CGC MORRO BAY GAUGE CALIBRATION SOW FINAL.pdf
PDF 238 KB Posted
- Attached to
- CGC MORRO BAY GAUGE CALIBRATION
- Solicitation number
- 70ZU0227Q0001013
- Issued by
- Not on record
About this file
This is a Statement of Work for the inspection, configuration, and calibration of Weschler digital panel meters supporting the center-section engine overhaul of the CGC MORRO BAY, a United States Coast Guard cutter. The work is located in Cleveland, Ohio, with performance beginning December 1, 2026.
The contractor must inspect, configure, and calibrate digital panel meters that support three voltage input channels compatible with 0-10 V, 0-5 V, ±100 V, and frequency signal ranges. All meters passing testing must be labeled with calibration test dates and contractor initials; failed meters must be labeled accordingly. The contractor is responsible for ensuring secure electrical connections, wiring terminations, mounting hardware, and signal inputs, then conducting functional testing to verify proper operation, accuracy, readability, and system compatibility. The contractor is authorized to perform minor in-scope adjustments, configuration changes, wiring corrections, and tuning at no additional cost, but any work requiring additional parts, replacement wiring, major repairs, system redesign, or significant labor beyond the awarded scope must be documented and requires written authorization from the Contracting Officer before proceeding. Upon completion, the contractor must deliver a Final Service Report identifying installed panel meters, work performed, testing completed, final operational status, and any discrepancies or recommended follow-on repairs. The work location is CGC MORRO BAY, 1055 East 9th Street, Cleveland, Ohio 44114, with technical questions directed to CWO Gregory Tarker at Gregory.E.Tarker@uscg.mil or 440-458-0278.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage and Determinations Ohio.pdf | ||
| FAR CLAUSES FOR SERVICES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CGC MORRO BAY OPFAC: 17506 LOCATION: Cleveland, OH.
EQUIPMENT: WESCHLER DIGITAL PANEL METERS
COMPONENT AFFECTED: ENGINEERING MONITORING AND INDICATION SYSTEM,
CENTER-SECTION ENGINE OVERHAUL
DISCREP: 25107 Prop Gen Center Section Overhaul
MAINTENANCE PROCEDURE CARD (MPC): E-C-783
SECTION 1 – GENERAL INFORMATION
1.1 Scope of Work
The contractor must inspect, configure, and calibrate Weschler digital panel meters in support of the center-section overhaul of one of CGC MORRO BAY’s engines. The digital panel meters must support three voltage input channels and be compatible with required input ranges, including 0-10 V, 0-5 V, ±100 V, and frequency signals.
The contractor must affix a label stating calibrations test date and initials on each meter each meter that passes testing. Any meter that is unable to be calibrated must be labeled with failed or out of calibration in a similar manner. The contractor must ensure all electrical connections, wiring terminations, mounting hardware, signal inputs, and associated components are secure and properly configured.
Following installation, the contractor must calibrate or configure the digital panel meters as necessary to ensure accurate indication of voltage and frequency inputs. The contractor must conduct functional testing of each installed meter to verify proper operation, accuracy, readability, and compatibility with the cutter’s engineering monitoring system. The contractor must coordinate all testing with the TPOC and must return affected systems to normal operational configuration upon completion of the work.
The contractor is authorized to perform minor in-scope adjustments, configuration changes, wiring corrections, and tuning required to restore the panel meters and associate monitoring functions to normal operation, provided these actions do not require additional parts or incur costs beyond the awarded scope of work.
Any discrepancy identified that requires additional parts, replacement wiring, major repairs, system redesign, or significant labor beyond the scope of this requirement must be documented in the Final Service Report. The contractor must not proceed with any additional repair work without written authorization from the Contracting Officer. The TPOC will route the report to the Contracting Officer, who is the sole authority for authorizing work that results in additional cost.
The contractor must provide a Final Service Report upon completion of work. At a minimum, the report must identify the panel meters installed, work performed, testing completed, final operational status, and any discrepancies or recommended follow-on repairs.
1.2 Contact for questions:
1.2.1 Any questions regarding scope of work must be directed to the Contracting Officer (KO).
Technical questions can be directed to CWO Gregory Tarker, Gregory.E.Tarker@uscg.mil, Phone # 440-458-0278.
1.3 Required Delivery Date and Address
Address/Location:
CGC MORRO BAY
1055 East 9th Street Cleveland, OH. 44114
(206) 815-6706
1.4 Period of Performance (POP)
Work to begin 12/1/2026.
File details come from the government source that posted it. Updated .