SOW.CylinderRental.ASCW.pdf

PDF 109 KB Posted

Attached to
USCG Air Station Clearwater Cylinder Rental Services
Solicitation number
70ZL26-27-ASCW-CylinderRentalServices
Issued by
Not on record

About this file

STATEMENT OF WORK SUMMARY

This is a Statement of Work (SOW) for FY27 Cylinder Rental services at United States Coast Guard Air Station Clearwater. The contractor must provide weekly pickup, refill, and delivery of compressed gas cylinders to support the air station's 24/7 operational missions. Service hours are 0800–1500 EST, Monday through Friday (with holiday adjustments to the previous business day), though the contractor may be required to work outside normal business hours, including weekends and holidays, as needed. The primary performance location is Coast Guard Air Station Clearwater, 15100 Rescue Way, Clearwater, Florida 33762. The contract period runs from ARO December 2026 through 31 December 2027.

The contractor must supply and maintain 131 total compressed gas cylinders across 12 different types and sizes, including argon, nitrogen (industrial and medical grades), oxygen (industrial, aviation, and medical grades in multiple sizes), carbon dioxide, and mixed gases. All contractor personnel must possess valid identification for facility access, comply with security protocols, maintain professional conduct, and meet DHS safety and operational standards. The contractor must furnish all personnel, equipment, materials, tools, and supervision necessary to perform the work. A project manager must be available via telephone during business hours (0800–1500 EST) and respond to technical issues within 48 hours. The government will furnish no resources; the contractor is responsible for all deliverables including draft and final project plans, business continuity plans, and progress reports, with a standard three business-day review and correction cycle for COR acceptance.

View the file

Other files

File Type Posted
RFQ.70ZL26-27-ASCW-CylinderRentalServices.docx DOCX document
Services.Wage.Act.Pinellas.pdf PDF
FAR.CLAUSES.NOV.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

FY27 CYLINDER RENTAL

1.0 GENERAL

1.1 Background

To provide Air Station Clearwater weekly Gas Cylinder services of rented equipment to include

Pickup, refill and delivery of compressed gas bottles.

1.2 Scope

The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform as defined in this Scope of Work, the contractor must perform to the standards in this contract.

1.3 OBJECTIVE

Service is to ensure Coast Guard Air Station Clearwater is supplied with a continuous supply of compressed gases critically needed to perform the units 24/7 missions.

1.4 APPLICABLE DOCUMENTS

N/A

1.4.1 Compliance Documents

1.4.2 Reference Documents

https://uscg-my.sharepoint-mil.us/personal/antoine_d_titus_uscg_mil/Documents/SMA/FY25/SCOPE%20PARAGRAPHS.doc

2.0 SPECIFIC REQUIREMENTS/TASKS

Vendor shall pick up, refill and delivery of the following compressed gas cylinders. 0800- 1500 Monday-Friday and should the service fall on a holiday the delivery shall be made on the previous business days.

PART # DESCRIPTION AND NUMBER OF BOTTLES AS FOLLOWS:

1)Argon Size 300 (3ea)

2) AR 75/25 size 300 (1ea)

3) CD SZ 20LB Carbon (10ea)

4)Nitrogen Industrial size 300 (34ea)

5)Industrial Oxygen size 300 (4ea)

6) Aviation Oxygen size 300 (11ea)

7) Industrial oxygen size 125 (3ea)

8) Nitrogen Industrial size 80 pound (1ea)

9) Medical oxygen size 300 (4ea)

10) Medical oxygen size M22 (26ea)

11) Medical oxygen size DA (8ea)

12)Medical oxygen size EA (6ea)

3.0 CONTRACTOR PERSONNEL

The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence.

Otherwise, the Contractor must provide a fully qualified replacement.

3.3 KEY PERSONNEL

3.4 PROJECT MANAGER

The Project Manager must be available to the COR via telephone between the hours of 0800 and 1500 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 48 hours of notification.

3.5 EMPLOYEE IDENTIFICATION

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

3.6 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the COR), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

4.2 Period of Performance

The period of performance for this contract must not exceed

ARO December 2026 - 31 December 2027.

4.3 PLACE OF PERFORMANCE

The primary place of performance will be the United States Coast Guard at Air Station Clearwater, 15100 Rescue Way, Clearwater, FL 33762.

4.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0800 and 1500 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.5 Travel

4.6 POST AWARD CONFERENCE

4.7 PROJECT PLAN

4.8 BUSINESS CONTINUITY PLAN

4.9 PROGRESS REPORTS

4.10 PROGRESS MEETINGS

The Project Manager must be available to meet with the COR upon request to present deliverables, discuss progress, exchange information and resolve emergent technical problems and issues. These meetings must take place by Telephone or email or in person at Coast Guard Air Station if needed.

4.11 GENERAL REPORT REQUIREMENTS

The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).

4.12 INTELLECTUAL PROPERTY

4.13 PROTECTION OF INFORMATION

4.14 SECTION 508 COMPLIANCE

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have 03 business days to review deliverables and make comments. The Contractor must have 03 business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.

8.0 DELIVERABLES

The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.

ITEM

SOW

REFERENCE

DELIVERABLE / EVENT DUE BY

DISTRIBUTION

1 4.6 Post Award Conference Xxxxx

2 4.6, 4.7 Draft Contractor Project Plan

Xxxxx

COR,

Contracting Officer

3 4.7 Final Contractor Project Plan

Xxxxx

COR,

Contracting Officer

4 4.8 Original Business Continuity Plan

Xxxxx

COR,

Contracting Officer

5 4.8 Updated Business Continuity Plan

Xxxxx

COR,

Contracting Officer

6 4.9 Progress Reports Xxxxx

COR,

Contracting Officer

7 xxx Xxxxx Xxxxx

Xxxx

8 xxx Xxxxx Xxxxx Xxxx

9 xxx Xxxxx Xxxxx Xxxx

File details come from the government source that posted it. Updated .