This is a Statement of Work and Specifications for replacement of flooring in the galley at U.S. Coast Guard Station Saginaw River in Essexville, Michigan, effective October 13, 2026. The contractor must remove approximately 450 square feet of existing quarry tile flooring, thin-set mortar bed, and all associated debris from the galley and adjacent hallway. Work includes removal and reinstallation of interferences (cook range, sink, countertops, refrigerator), removal of approximately 70 linear feet of cove base, surface preparation, installation of new quarry tile flooring, and installation of new cove base. The Onsite Technical Representative is MKCS Travis J. VanWinkle at (402)-709-4114, with alternate MK1 Curtis B. Gustin at (989) 233-3756. The project must be completed within 30 calendar days from acceptance of submittals, with standard work hours from 7:00 a.m. to 4:00 p.m., though extended hours are permitted with OTR approval.
The contractor must supply all supervision, labor, equipment, and materials and comply with FDA Food Code 2026, Chapter 6-101 Indoor Areas requirements, including smooth, durable, easily cleanable, and nonabsorbent surfaces suitable for food establishment operations. The flooring must meet a minimum Dynamic Coefficient of Friction of 0.42 per ANSI A326.3. Materials must be delivered in original unopened packages and stored per manufacturer specifications in clean, dry, well-ventilated areas. The contractor must comply with local VOC laws, provide applicable Safety Data Sheets, implement a comprehensive safety program, and prevent construction materials and debris from entering water. The Davis-Bacon Act applies to this procurement. The contractor is responsible for site restoration and cleanup at the end of each workday and upon project completion, with no final acceptance until the OTR approves the job site appearance. All submittals must be provided five days prior to work commencement and include catalog cuts with manufacturer specifications and sketches demonstrating compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 70ZL1727QCLEV0004 Sta Saginaw River Galley Flooring.docx | DOCX document | |
| Standard Form 1442 - 70ZL1727QCLEV0004.pdf | ||
| DB Wage Determination Bay County.pdf | ||
| References.pdf | ||
| Request for Information.pdf |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work and Specifications for
Replacement of Flooring in Galley
At U.S. Coast Guard
Station Saginaw River Essexville, MI.
13, October 2026
Officer in Charge United States Coast Guard
Station Saginaw River 2405 Weadock HWY Essexville, MI 48732
Background
The quarry tile flooring in the gally of STA Saginaw has failed with several tiles popping off the floor. It was a hot summer day, and the A/C had failed in the building; raising the temperature in the facility. When the A/C was repaired, it was determined the change in atmosphere caused an expansion; which popped the tiles from the floor. The intent of this project is to remove approximately 450 Sqft of quarry tile from the galley and hallway next to the galley; install new quarry tile.
1. SCOPE: Contractor shall supply all supervision, labor, equipment, and materials for the removal of existing quarry tile, thin-set mortar bed, and all debris within the galley and the hallway next to the galley. For bidding purposes, the total approximately square footage of tile is 450 Sqft.
Contractors shall also supply all supervision, labor, equipment, and materials to remove and reinstall all interferences, install replacement quarry tile floor.
Remove and all interferences; cook range, sink, counter tops, Fridge ect… Remove all old tile, mortar, and debris.
Remove Cove Base. Approximately 70 ft (Contractor Field virility) Prep floor surface for new tile.
Install new quarry tile.
Install new Cove Base.
Re-install cook range, sink, counter tops, Fridge ect..
2. GOVERNMENT FACILITIES AND UTILITIES: Electrical power of 120v and water are available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded. Telephone services will not be available for use by the contractor.
3. ONSITE TECHNICAL REPRESENTATIVE: The Onsite Technical
Representative (OTR) will be MKCS Travis J. VanWinkle (402)-709-4114. OTR Alternate will be MK1 Curtis B. Gustin (989) 233-3756.
4. MATERIALS AND LOCATIONS:
a. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations in a clean, dry, well-ventilated area.
Stored materials shall be protected from sunlight, and kept away from excessive heat. The contractor shall not store any highly flammable materials in the work area. Sufficient area for staging is available on site;
storage areas will be pre-approved by the OTR. Special precautions shall be taken to ensure construction materials and debris does not enter the water.
b. The Contractor is required to comply with local VOC laws and regulations.
All applicable Safety Data Sheets shall be available upon request.
5. SCHEDULE OF WORK: Completion of work shall be accomplished within 30 calendar days from acceptance of submittals. The Contractor shall have the normal base work hours of 7:00 am to 4:00 pm, but the contractor is not limited to these hours. If the contractor is going to work outside normal working hours, permission must be obtained from the OTR.
6. EXISTING CONDITIONS: The contractor is expected to satisfy himself as to the existing conditions and the work to be performed. The contractor shall verify all dimensions prior to ordering materials and commencement of work.
A site visit should be arranged with the OTR.
7. LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the OTR.
8. INSPECTION AND ACCEPTANCE: The OTR will accomplish inspection and acceptance of work.
8. LABOR LAWS: The Davis-Bacon Act applies to the procurement.
9. SAFETY: The Contractor is solely responsible for work site safety. The
Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, fall protection, signs, signal lights, etc.
as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations.
10. SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each workday. Contractor shall take special care to contain dust while working. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains. There will be no final acceptance of the contract until (OTR) approves the appearance of the job site.
11. GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all
Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area, and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard Building.
12. SUBMITTALS: The following list of submittals required for approval, defines the specific minimum requirements for this contract. The Contractor shall submit the submittals 5 days prior to the commencement of work and must obtain approval from the US Coast Guard. A “Catalog Cut” shall be submitted for each of these items, which will include the manufacturer’s description, specifications, and sketches of the material being used. The catalog cut shall contain sufficient information that can be used to determine compliance of the material with these specifications and referenced specifications.
13. GENERAL TECHNICAL REQUIREMENTS
1. Contractor shall install new epoxy or tile flooring, that meets FDA Food
Code 2026, Ch 6-101 Indoor Areas and meets the following requirements:
(1) SMOOTH, durable, and *EASILY CLEANABLE for areas where
*FOOD ESTABLISHMENT operations are conducted, (3) Nonabsorbent for areas subject to moisture. Installation of new product will comply with manufactures specifications and all precaution taken for proper adhesion.
2. Contractor will clean and remove old existing flooring to remove loose dirt and debris before prep fill joints, spalled areas, and holes.
3. Contractor will apply colorization to the base coat of OTRs choosing.
4. Contractor will apply a decorative flake or like in kind to meet minimum
Dynamic Coefficient of Friction (DCOF) of 0.42 IAW ANSI A326.3
5. Hallway walls and molding shall be protected and place back to original condition.
6. All areas shall be protected to avoid damage to normal walking traffic during cure times.
7. Contractor will conduct clean-up of site, remove and dispose of all debris in a dumpster provide by the contractor, and remove from site prior to sign off of project by OTR.