This is a Statement of Work for a Request for Quote (RFQ 70ZL14Q0000006) issued by the U.S. Coast Guard for propane regulator assembly replacement services at Fire Island Housing in Babylon, New York. The contractor must remove and replace 13 exterior propane regulator assemblies serving housing boilers, furnishing all labor, materials, equipment, transportation, and supervision. Each replacement assembly shall include a complete new LP-gas regulator suitable for outdoor vapor service, a manual gas shutoff valve, compatible unions or approved disconnect fittings, nipples, adapters, vent protection, and mounting hardware. The scope is limited to regulator replacement and deteriorated adjacent piping only where necessary (maximum 5 linear feet per assembly for inlet and outlet piping combined), with tank replacement, buried line replacement, relocation, capacity increases, boiler replacement, and engineered redesign explicitly excluded.
Work must be completed within 30 calendar days after award and performed by qualified LP-gas technicians holding required licenses during normal hours (0800-1500, Monday through Friday, excluding federal holidays). A pre-award site visit is strongly encouraged to verify all 13 locations, equipment ratings, piping conditions, and access. Contractors must submit regulator product data and verified pressure and capacity information for Government review before ordering and obtain required permits and inspections. Work shall comply with applicable fuel gas requirements, NFPA 54 and NFPA 58, manufacturer instructions, and OSHA requirements, including proper piping isolation, depressurization, pressure testing, leak checks, and verification of regulator outlet pressure and lockup pressure. Upon completion, contractors must provide a location-by-location record of installed models, pressure settings, test results, actual piping replaced, operating instructions, warranties, and final installation photographs, with a minimum one-year warranty on materials and workmanship required. Quotes must be firm fixed price, include lead time for parts, parts specification sheets, detailed price breakdowns, completed SF 18 forms with price and UEI, and past performance information, with evaluation based on lowest price technically acceptable. Questions must be received in writing by November 30, 2026, and quotes must be submitted to Beverly.A.Primm@uscg.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12_30199PR270000006SF18.docx | DOCX document | |
| 12_30199PR270000006RFQCLAUSES.docx | DOCX document | |
| 7_30199PR270000006WR.pdf | ||
| SF1413REVOCT2023.pdf | ||
| 12_30199PR270000006RFQCLAUSES.docx | DOCX document | |
| 7_30199PR270000006WR.pdf | ||
| 12_30199PR270000006SF18.docx | DOCX document | |
| 3_30199PR270000006SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Propane Regulator Assembly Replacement Fire Island Housing Site
REQUEST FOR QUOTE (RFQ) 70ZL14Q0000006
Location: 1 Rescue Road, Babylon, NY 11702-4602 Contracting Officer’s Representative: DCC Kyle Swann COR Email: Kyle.D.Swann@uscg.mil Phone: (562) 562-0240 Unit site contacts: MK1 Kyle Turcott Phone: (810) 441-8754 1 Scope Provide all labor, materials, equipment, transportation, and supervision to remove and replace 13 exterior propane regulator assemblies serving housing boilers. Replace equipment one for one in the existing locations, maintaining the existing gas service arrangement, capacity, and operating pressures.
Replace deteriorated adjacent piping only where needed, limited to 5 linear feet per assembly, including inlet and outlet piping combined. Retain existing routing and pipe size. Tank replacement, buried distribution line replacement, relocation, capacity increases, boiler replacement, and engineered redesign are outside this scope.
2 Replacement Requirements Furnish 13 complete, new, listed LP-gas regulator assemblies suitable for outdoor propane vapor service. Each assembly shall include a regulator, manual gas shutoff valve, compatible unions or approved disconnect fittings, nipples, adapters, vent protection, and necessary mounting hardware. Verify existing regulator type, inlet pressure, required outlet pressure, connection sizes, and connected boiler load before ordering. Do not select replacements by appearance or color alone. The photographed nameplate appears to identify a Fisher R622-DFF regulator with a 9–13 inch water column spring range. This is reference information only; verify each installed regulator and the required operating setpoint before procurement. Do not use the spring range as the outlet pressure setting.
Use approved LP-gas piping, fittings, and thread sealant. Maintain required dielectric separation at riser transitions. Support assemblies without stressing existing piping; protect new exposed steel piping against corrosion. Install regulators and protected vents in accordance with manufacturer instructions and required clearances from openings and ignition sources. Keep vents unobstructed. Inspect exposed threaded connections, shutoff valves, unions, and aboveground riser transitions for corrosion and serviceability. Replace unserviceable components within the stated piping allowance. Preserve existing tracer wire continuity and do not disturb buried piping. Verify vent orientation and clearance above grade in accordance with the replacement manufacturer instructions.
3 Site Visit and Coordination A pre-award site visit is strongly encouraged to verify all 13 locations, equipment ratings, piping condition, and access. Submit regulator product data and verified pressure and capacity information for Government review before ordering. Work shall be performed by qualified LP-gas technicians holding required licenses. Obtain required permits and inspections.
Normal work hours are 0800–1500, Monday through Friday, excluding federal holidays. Coordinate access and gas outages with the COR at least 48 hours in advance. Protect residents and property and minimize loss of heat.
4 Safe Installation and Testing Follow applicable fuel gas requirements, NFPA 54 and NFPA 58 as adopted, manufacturer instructions, and OSHA requirements. Safely isolate and depressurize affected piping before removal. Protect appliances from test pressure. Perform required piping pressure tests and leak checks, safely purge affected piping, and verify regulator outlet pressure under load and lockup pressure within manufacturer limits. Restore service and verify proper boiler ignition and operation.
If piping damage extends beyond the 5-foot allowance, or an unsafe condition or suspect hazardous material is encountered, stop affected work, secure the area, and notify the COR. Do not restore unsafe service. Only the Contracting Officer may authorize changes to scope, price, or contract terms.
5 Completion and Acceptance Complete work within 30 calendar days after award unless otherwise specified in the contract. Remove replaced equipment and debris from Government property and restore disturbed areas. Provide a location-by-location record of installed models, pressure settings, test results, and actual piping replaced, plus operating instructions and warranties. Correct deficiencies before acceptance. Provide a minimum one-year warranty on materials and workmanship from final acceptance. Include final installation photographs and identify each housing location in the closeout record.
Existing Propane Regulator Assembly
Photo 1 Existing regulator assembly and adjacent piping. Verify conditions and replacement requirements at each of the 13 locations.
Additional Existing Condition Photos Representative existing conditions only. Verify all 13 locations during the site visit. Photographs do not establish concealed conditions or confirm equipment serviceability.
Photo 2 Overall installation showing the wall connection, regulator, shutoff, and riser.
Photo 3 Regulator and adjacent threaded connections.
Photo 4 Close view of regulator body, fasteners, and shutoff valve.
Photo 5 Nameplate reference for field verification before replacement selection.
Photo 6 Side view of regulator, fittings, and riser transition.
image1.jpeg image2.png image3.png image4.png image5.png image6.png