1. PWS - Snow Plowing and Ice Management Services.pdf
PDF 855 KB Posted
- Solicitation number
- 70ZL1427Q0000002
- Issued by
- Not on record
About this file
This is a Performance Work Statement (PWS) for snow plowing and ice management services at the U.S. Coast Guard (USCG) Northeast District, John Foster Williams Building in Boston, Massachusetts.
The Contractor shall provide comprehensive snow plowing, snow clearing, and ice management services to maintain safe, passable, and accessible vehicle and pedestrian routes during winter weather conditions. Services are required when snow accumulation reaches 2 inches or more, or upon request from the Contracting Officer Representative (COR). The scope includes servicing the road/causeway leading to the entrance gate, access road to the parking lot, entire parking lot, front entrance area with sidewalks and stairs, and the open area along the building side. The Contractor must plow, shovel, blow, or otherwise remove snow without blocking entrances, pedestrian routes, accessible parking, fire hydrants, drainage features, parked vehicles, or emergency access, relocating snow only to Government-designated storage locations. All services must be completed no later than 6:30 AM. During continuous snowfall events extending through 6:30 AM, the Contractor shall perform an initial pass before morning commute hours, periodic clearing when accumulations reach an agreed threshold, and final cleanup after the storm ends. The Contractor shall apply salt, sand, or other appropriate deicing material to all service areas.
The contract requires seven-day-per-week coverage, including weekends and Federal holidays, due to 24/7/365 facility operations. The Period of Performance runs from December 7, 2026, through May 31, 2027. The Contractor must designate a Contract Manager and at least one alternate, both fluent in English, who have full authority over daily operational matters and must remain reachable throughout active service events. The Contract Manager must notify the USCG Command Center at (617) 603-8555 prior to performing after-hours services (weekdays 4:00 PM to 6:00 AM and weekends/Federal holidays 4:00 PM Friday through 6:00 AM Monday). Within 24 hours of each service event, the Contractor shall submit a service-event report via email to the COR including date, weather conditions, arrival/departure times, areas serviced, services performed, deicing materials applied, known hazards, and damage observed. The Government POC is SKC Ebenezer Oforiafram at ebenezer.n.oforiafram@uscg.mil or (571) 610-4520. All invoices must be submitted electronically via the Invoice Processing Platform (IPP) at ipp.gov separately for each service event, clearly displaying the Contract/PO Number, Company Name and Address, Unique Entity Identifier (UEI) Number, Invoice Number, Invoice Date, and Date of Service. The Contractor must present valid government-issued photo identification upon entry and comply with installation access and safety procedures; time spent on security screening is not considered a government-caused delay. The Contractor is responsible for correcting any damage caused by its operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Provisions and Clauses.pdf | ||
| 1. Instructions to Offerors.pdf | ||
| 1. suffolk_county_wage_determinations15-4047.txt | TXT text file | |
| 1. Pricing Instructions.pdf | ||
| 1. SF18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
PERFORMANCE WORK STATEMENT (PWS)
SNOW PLOWING AND ICE MANAGEMENT SERVICES
NORTHEAST DISTRICT
BASE BOSTON
COMMANDING OFFICER
408 ATLANTIC AVE, BOSTON, MA 02110
1 | P a g e
PERFORMANCE WORK STATEMENT (PWS)
Snow Plowing and Ice Management Services U.S. Coast Guard District Northeast — John Foster Williams (JFW) Building
1. INTRODUCTION / BACKGROUND
The Contractor shall provide comprehensive snow plowing, snow clearing and ice management services for the U.S.
Coast Guard (USCG) District Northeast at the John Foster Williams (JFW) Building, located at 408 Atlantic Ave, Boston, MA 02110.
The objective of this requirement is to maintain safe, passable, and accessible vehicle and pedestrian routes within the designated service areas during winter weather conditions.
2. SCOPE OF WORK AND PERFORMANCE REQUIREMENTS
a. General Requirements: The contractor shall provide all personnel, materials, supplies, equipment, supervision, vehicles, fuel, and incidental items necessary for managing and performing snow plowing, snow clearing, and ice management services in accordance with this PWS.
The Contractor shall continuously monitor weather conditions throughout the period of performance and shall initiate services without waiting for Government notification when any of the following conditions occur within the designated service areas:
1. Snow accumulation reaches 2 inches or more; or
2. The Contracting Officer Representative (COR) or designated Government point of contact (POC) requests services that are within the established scope of this contract.
b. Service Areas: The Contractor shall service the areas identified below (see Enclosure 1, Service Area Map for reference).
The road/causeway leading up to the entrance gate The access road leading to the parking lot The entire parking lot The front entrance area of the building, to include sidewalks and stairs The open area along the side of the building
c. Snow Clearing and Snow Relocation: The Contractor shall plow, shovel, blow, or otherwise remove snow as appropriate for access conditions to all service areas. The Contractor shall not push, pile, or discharge snow in a manner that blocks entrances, pedestrian routes, accessible parking, fire hydrants, drainage features, parked vehicles, or emergency access. The Contractor shall relocate snow only to Government-designated on-site storage locations. The Contractor shall obtain Government direction before using a storage that has not been designated for that purpose.
d. Deicing and Ice Management: The Contractor shall apply salt, sand, or other appropriate deicing material to all service areas to mitigate ice and traction hazards.
e. Completion Deadline: All services shall be completed no later than 6:30 AM.
f. Proactive Mitigation: During continuous snowfall events that continues through 6:30 AM, the Contractor shall perform the following:
An initial pass before morning commute hours to provide safe access to the service areas.
2 | P a g e
Periodic clearing during extended storms when accumulations reach an agreed threshold.
A final cleanup after the storm ends, including widening, edge cleanup and treatment.
g. After-Hours Operations: The Contractor shall respond promptly when contacted by the designated USCG representative to perform after-hours plowing and sanding/salting.
3. HOURS OF OPERATION, LOCATION, AND POINTS OF CONTACT
a. Standard & Weekend Hours: Because the USCG facility operates 24 hours a day, 7 days a week, 365 days a year, the Contractor shall provide coverage seven days a week, including Saturdays and Sundays, or as otherwise directed by the COR.
b. Federal Holidays: Service is required on all Federal Holidays due to continuous 24/7/365 facility operations, unless otherwise specified by the COR.
c. Adjusted Work Schedules: If circumstances require the Contractor to request an adjusted work schedule different from the requirements in Sections 3.a and 3.b, the Contractor must submit a written request to the COR at least 24 hours prior to the requested change. If the requested change takes effect on a Monday, the written request must be submitted to the COR prior to 9:00 AM on the preceding Friday.
d. Place of Performance:
John Foster Williams (JFW) Building 408 Atlantic Ave Boston, MA 02110
e. Government Point of Contact (POC): The Government POC will be available to coordinate site access and answer operational questions. The Contractor shall immediately notify the POC of conditions that delay, prevent, or materially affect performance.
POC Name: SKC Ebenezer Oforiafram Email: ebenezer.n.oforiafram@uscg.mil Phone: (571) 610-4520
4. PERIOD OF PERFORMANCE
The Period of Performance for this contract is December 7, 2026, through May 31, 2027.
5. CONTRACTOR PERSONNEL
5.1 Contract Manager
a. Designation: The Contractor shall designate a Contract Manager, and at least one alternate to act in the manager's absence, in writing to the Contracting Officer prior to contract start. The Contract Manager is responsible for overseeing the timely performance and completion of all work under this PWS.
b. Authority: The Contract Manager or designated alternate shall have full authority to act on behalf of the Contractor on all daily operational matters and shall be reachable throughout each active service event.
c. Language Proficiency: The Contract Manager and all alternates must be able to read, write, speak, and understand English fluently.
d. After-Hours & Verification Check-Ins: The Contract Manager must notify the USCG Command Center at (617) 603-8555 prior to performing service during after-hours windows. After-hours windows are weekdays between 4:00
3 | P a g e
PM and 6:00 AM and weekends and Federal holidays from 4:00 PM Friday through 6:00 AM Monday, including all Federal holidays. The Contractor shall also notify the Command Center when the after-hours service is complete.
e. Service-Event Reporting. Within 24 hours after each service event, the Contractor shall email the COR and/or designated Government POC a service-event report that includes:
Date and weather condition;
Arrival and departure times, including time of Command Center check-in for after-hours work;
Areas serviced;
Services performed;
Type and approximate quantity of deicing material applied;
Known hazards, deficiencies, access limitations, or conditions requiring Government action;
Damage caused or observed by weather conditions or service efforts; and Name of the USCG Command Center representative contacted, when applicable.
5.2 Contractor Employees
a. Conduct & Suitability: The Contractor shall ensure personnel conduct themselves professionally and comply with installation access and safety requirements. The Government may deny installation access to an individual when necessary for safety, security, or mission reasons; such denial does not relieve the Contractor of performance obligations.
b. Appearance: When performing services, Contractor personnel shall maintain a neat appearance and be readily identifiable as Contractor personnel through company identification, branded apparel, or high-visibility garments, as appropriate for the work and conditions
c. Conflict of Interest: The Contractor shall not employ any U.S. Government employee if doing so would create a conflict of interest. Furthermore, the Contractor shall not employ any active or civilian U.S. Coast Guard personnel unless that individual has sought and received formal approval in accordance with USCG regulations.
6. QUALITY ASSURANCE & ACCEPTANCE OF WORK
The Government may inspect completed and in-process work. The Contractor shall correct nonconforming work identified by the Government at no additional cost and within the time directed by the COR or designated Government POC, considering active weather and safety conditions.
A service event is acceptable when the Contractor has performed all required work; met the applicable response and completion standards; cleared and treated the designated service areas to maintain safe, passable, and accessible vehicle and pedestrian routes; and submitted the required service-event report.
Government verification may include review of the service-event report, Command Center notification records for after-hours work, and inspection of completed or in-process work. A condition does not constitute nonconforming performance when active precipitation or unsafe conditions prevent full completion, provided the Contractor has prioritized access routes, taken reasonable mitigation measures, and continues work without undue delay.
If the Government identifies nonconforming performance, the Contractor shall correct the deficiency at no additional cost within the time directed by the COR or designated Government POC, considering active weather and safety conditions.
7. INVOICING
a. Submission Portal: All invoices shall be submitted electronically via the Invoice Processing Platform (IPP) at ipp.gov. Invoices must be submitted separately for each service event.
4 | P a g e
b. Required Information: To ensure timely payment, all invoices must clearly display:
Contract or Purchase Order (PO) Number Company Name and Address Unique Entity Identifier (UEI) Number Invoice Number, Invoice Date, and Date of Service
The Contractor may attach the corresponding service-event report and any other documentation required by the contract or requested by the COR to support acceptance and payment.
8. SECURITY REQUIREMENTS
All Contractor personnel performing work under this contract shall present valid, government-issued photo identification upon entry and comply with installation access, traffic, and safety procedures. Time spent undergoing security screening or gaining entrance to USCG facilities shall not be considered a government-caused delay of work or a differing site condition.
9. DAMAGE TO GOVERNMENT AND PRIVATE PROPERTY
The Contractor shall take reasonable steps to prevent damage to Government and private property. The Contractor shall immediately notify the COR and designated Government POC of any damage, injury, hazardous condition, or incident arising from or observed during performance. The Contractor shall document the incident in the service-event report and shall be responsible for correcting damage caused by its operations in accordance with the contract.