PWS FLOOR REFINSIHING.pdf

PDF 365 KB Posted

Attached to
Floor Refinishing Services
Solicitation number
70ZH1526QCGA00004
Issued by
Not on record

About this file

This is a Performance Work Statement (PWS) for floor refinishing services at the U.S. Coast Guard Academy in New London, Connecticut.

The Contractor shall provide all labor, materials, equipment, transportation, and supervision for annual sanding, refinishing, maintenance, and associated services for two government-owned hardwood basketball court floors. The base scope includes screen-and-recoat service on Roland Hall Gymnasium (17,422 square feet, performed annually) and Billard Hall Gymnasium (12,129 square feet, performed biennially during funded periods). The Contractor must clean the floor, mechanically screen or abrade the existing finish only to the extent necessary for recoating, vacuum and tack to a dust-free condition, and apply one coat of approved finish. Work shall not involve sanding to bare wood or to depths that compromise existing court markings or hardwood integrity. The Contractor must apply a high-solids, low-VOC, oil-based, commercial-grade athletic hardwood-floor finish compatible with the existing oil-based coating system in accordance with manufacturer recommendations. All work must be coordinated with the Contracting Officer's Representative to minimize disruption to Academy operations and athletic events. Services are performed at 15 Mohegan Avenue, New London, Connecticut.

An optional CLIN provides for full hardwood-floor refinishing of additional floors at a firm-fixed unit price per square foot, including removal of existing coatings, mechanical sanding, preparation, finish application, and cleanup. The Contractor must submit work schedules at least 10 business days before the proposed start date, including proposed start date, estimated duration, number of personnel, equipment, finish products, anticipated cure time, and court return-to-service date. Required deliverables include work schedules and current Safety Data Sheets for all proposed products. All Contractor personnel must wear uniforms and present valid REAL identification and/or driver's licenses. The Contractor is solely responsible for hazardous waste material generated and must comply with Federal, State of Connecticut, and local laws, EPA, Connecticut Department of Environmental Protection, and OSHA regulations. Standard 110-volt electrical outlets are available; the Government will not provide electricians, special equipment hookups, generators, or higher-voltage service unless authorized in writing.

View the file

Other files

File Type Posted
Suggested CLINs.pdf PDF
SITE VISIT INFORMATION.pdf PDF
Combined Synopsis Solicitation_FLOOR REFINISHING.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) for Floor Refinishing Services Coast Guard Academy, New London, CT

1.0 INTRODUCTION

The Contractor shall furnish all labor, material, equipment, transportation and supervision to provide floor refinishing services to the U.S. Coast Guard Academy located in New London, CT.

2.0 BACKGROUND

2.1 The United States Coast Guard Academy is committed to strengthening the nation’s future by educating, training and developing leaders of character who are ethically, intellectually, professionally and physically prepared to serve their country and humanity, and who are strong in their resolve to build on the long military and maritime heritage and proud accomplishments of the United States Coast Guard.

2.2 This Educational Institution houses cadets and serves as a workplace for military and civilian employees year-round. As such, services performed under this contract shall not be scheduled to conflict with the normal daily operations of the facility without approval of the Contracting Officer’s Representative (COR).

2.3 This U.S. Coast Guard Academy consists of 2 hardwood floor courts. The following tables list the locations:

Areas to be serviced Location Square Foot

Roland Hall Gym (Annually) 17,422 Billard Hall Gym (Biennial) 12,129

3.0 SCOPE

3.1 The Contractor shall furnish all labor, supervision, tools, equipment, materials, transportation, and incidentals necessary to perform annual sanding, refinishing, maintenance, and associated services for Government-owned hardwood basketball court flooring.

The work shall restore and maintain the basketball court in a clean, smooth, uniform, safe, and playable condition while protecting the integrity of the existing hardwood flooring and court markings. The Contractor shall perform all work in accordance with applicable manufacturers’ recommendations, recognized industry practices, and the requirements of this PWS.

3.2 Place of Performance

Work shall be performed at the Government-designated basketball court facility at, 15 Mohegan Ave, New London, CT. Government will identify the specific court and provide access to the facility.

3.3 Period of Performance

The Contractor shall perform services for Roland Hall Gymnasium once during each contract year. The Contractor shall perform services for Billard Hall Gymnasium only during the base or option periods for which the applicable Billard Hall CLIN is included and funded, unless otherwise directed by the Contracting Officer (KO) or Contracting Officer’s Representative

(COR).

The Contractor shall coordinate all work with the COR to minimize disruption to Academy operations, athletic events, and other facility requirements.

3.4 Contractor Responsibilities

The Contractor shall perform a screen-and-recoat service. The Contractor shall clean the floor;

mechanically screen or abrade the existing finish only to the extent necessary to prepare the surface for recoating; vacuum and tack the floor to a dust-free condition; and apply one coat of approved finish.

The Contractor shall not sand the floor to bare wood and shall not sand to a depth that compromises existing court markings or the integrity of the hardwood flooring. Existing court markings, lines, logos, and graphics shall be protected during performance. Repainting or restoration of markings is required only when the Contractor damages markings during performance.

3.5 Finish Requirements

The Contractor shall apply a high-solids, low-VOC, oil-based, commercial-grade athletic hardwood-floor finish compatible with the existing oil-based coating system and suitable for indoor basketball court use. The Contractor shall apply the finish in accordance with the manufacturer’s written recommendations, including all required surface-preparation, application, drying, ventilation, and curing requirements.

The Contractor shall submit current Safety Data Sheets for all proposed products in accordance with Section 6.0.

3.6 Repairs Excluded from Base Scope

Except for repairs required to correct damage caused by the Contractor, floor repairs are not included in the fixed-price base scope. The Contractor shall promptly notify the COR of any observed floor damage, loose boards, failed coating, or other condition requiring repair. The Contractor shall not perform repairs outside the base scope without written authorization from the Contracting Officer and an authorized task order or other contract modification.

4.0 Option CLIN X – Refinishing of Additional Hardwood Floors Outside the Base Scope

The Government may, at its discretion, order the refinishing of additional hardwood floors that are not identified within the base contract scope. These areas may include, but are not limited to, gymnasiums, athletic facilities, multipurpose rooms, offices, corridors, or other Government-owned facilities containing hardwood flooring.

The optional additional-floor CLIN is for full hardwood-floor refinishing and is distinct from the base screen-and-recoat services. When authorized, the Contractor shall perform all work necessary to fully refinish the designated hardwood flooring, including removal of existing coatings as necessary, mechanical sanding, preparation, finish application, protection, cleanup, and disposal. The firm-fixed unit price per square foot shall include all associated labor, materials, equipment, supervision, mobilization, protection, and incidental costs.

The Contractor shall provide all labor, supervision, equipment, materials, supplies, protection, and incidentals necessary to completely refinish the designated hardwood floor areas in accordance with the requirements and standards established in this Statement of Work (SOW).

Work performed under this Optional CLIN shall include, as applicable:

1. Inspection and assessment of the existing hardwood floor condition.

2. Removal of existing finish and coatings as necessary.

3. Mechanical sanding and preparation of the hardwood surface.

4. Repair of minor surface imperfections and preparation of damaged areas.

5. Cleaning and removal of all dust and debris generated by the work.

6. Application of approved hardwood floor finish/coating in accordance with the manufacturer’s requirements.

7. Application of required coats, including appropriate drying and curing time between coats.

8. Final screening/buffing and preparation of the finished surface, as applicable.

9. Protection of adjacent walls, equipment, fixtures, and other Government property.

10. Removal and proper disposal of all contractor-generated debris and waste.

The Government will identify the specific floor area(s), approximate square footage, and desired period of performance when exercising this Optional CLIN. The Contractor shall not commence work under this CLIN until authorized in writing by the Contracting Officer or Contracting Officer’s Representative, as authorized by the contract.

Pricing: The Contractor shall provide a firm-fixed unit price per square foot for additional hardwood floor refinishing. The unit price shall include all labor, materials, equipment, supervision, mobilization, protection, cleanup, and other costs necessary to complete the work.

Measurement and Payment: Payment shall be based on the actual square footage of hardwood flooring refinished and accepted by the Government, multiplied by the established unit price. No payment will be made for areas outside the authorized work area or for work that does not meet the acceptance requirements of this SOW.

Optional Nature of CLIN: This CLIN is entirely optional and may be exercised in whole, in part, or not at all at the Government’s discretion. The Government makes no guarantee or minimum quantity of work under this CLIN.

5.0 General Conditions

5.1 Government Inspection – All maintenance work performed by the Contractor shall be subject to inspection by the Contracting Officer or the COR during and after completion of each maintenance visit. Unsatisfactory work shall be corrected at no additional cost to the Government.

5.2 Job Visit – The Contractor shall coordinate the proposed work with the COR and submit the required work-schedule information at least 10 business days before the proposed start date.

The Contractor shall provide:

Proposed start date Estimated duration Number of personnel Equipment to be brought on site Finish products to be used Anticipated cure time Proposed date the court will be returned to service

The Government reserves the right to coordinate the schedule around athletic events, facility requirements, and other mission requirements.

5.3 Hazardous Conditions – During the course of this contract, should the Contractor discover a hazardous condition, the Contractor shall secure the equipment and immediately notify the COR and/or the Contracting Officer.

5.4 Hazardous Materials – The Contractor shall be solely responsible for Contractor owned or Contractor generated hazardous waste material. While performing work specified herein, if hazardous waste materials are utilized or encountered, the Contractor shall notify the COR immediately. The Contractor’s responsibility for handling hazardous waste material is incidental to the work performed. The Contractor shall adhere to all safety requirements as specified by Federal, State of Connecticut, and local laws, EPA, Connecticut Department of Environmental Protection (DEP) and OSHA regulations pertaining to the handling of hazardous waste materials.

Contractor shall remove from the Academy all empty containers and any other materials used under this contract and dispose of them in accordance with all applicable laws. Contractor shall submit and maintain a valid and up-to-date Safety Data Sheet for all materials used under this contract and have a written emergency response plan for spills or other accidental exposure to the environment. The Contractor shall use chemical and non-chemical control techniques as necessary and in accordance with all Federal, State of Connecticut, and local laws, EPA, DEP and OSHA regulations pertaining to the handling of hazardous waste materials.

5.5 Utilities and Environmental Conditions

Standard 110-volt electrical outlets are available at the facility. The Contractor shall inspect and verify outlet locations, access, and suitability for Contractor equipment during the required site visit. The Government will not provide an electrician, special equipment hookup, temporary generator, or higher-voltage electrical service unless specifically authorized in writing.

The facilities have heat and exhaust fans but do not have cooling, drying HVAC, or continuous climate control. Contractor-provided dehumidification is not permitted. The Contractor shall coordinate any proposed ventilation measures with the COR and obtain approval before use.

6.0 Deliverables

The Contractor shall submit the following deliverables in accordance with the table below; and, via the following electronic media, Microsoft Word, when applicable. The format shall be PC compatible and submitted on compact disc or via email.

Deliverable (Based on PWS) Frequency No. Of Copies and to Whom

Date Required

Work schedule in accordance with Section 5.2

As revised One/ COR Within 10 days prior to starting any work

Safety Data Sheets As revised One/ COR Within one week after contract award and when new materials are used

7.0 PERSONNEL REQUIREMENTS

7.1. Management: The Contractor shall manage the total work effort associated with operations and all other services required herein in a skillful and professional manner to assure fully adequate and timely completion of these services. Included in this function is a full range of management duties including, but not limited to, planning, scheduling, cost accounting, report preparation, establishing and maintaining records and quality control. The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.

7.2. Security Requirements: All Contractor personnel shall appear in uniform and be able to present a valid REAL identification and/or driver’s license (if operating a vehicle).

File details come from the government source that posted it. Updated .