SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required for (l ) waste receptacle of an at least four cubic yards capacity, and (l ) co-mingles recyclables cart of an at least fifty gallon capacity, with weekly pickup at USCG

ESD Southport, 9001 River Road, Wilmington, NC 28412.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION

OF WORK: Upon acceptance the contractor shall commence work

NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 10 days after contract award.

3. SCOPE OF WORK:

(l) Contractor shall provide weekly service visits to empty one waste receptacle and one co-mingled recyclables cart. Visits shall be scheduled as follows:

a. Each Friday for the waste receptacle

b. Each Tuesday for the co-mingled recyclables cart.

c. If the regular service day falls on a holiday, service will occur the day prior to the regular service day.

This schedule of visits is valid for the entire length of the contract.

ESD Southport point of contact is ETC Stephen Goepel at (910)

792-0696.

(2) Provide trash and recyclables disposal service at the United States

Coast Guard ESD Southport to include delivery, pickup, and landfill fees.

(3) Contractor shall exchange used waste receptacles with clean ones twice a year to prevent vermin and insect infestation. The time frame for exchange is late October/ early November and late

April/Early May.

(4) If the Contractor cannot comply with the dates set forth in paragraph ( I ), the Contractor must contact ETC Stephen Goepel and set up alternate dates and times for the visit.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

l l. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station's regular hours, he may submit his request in writing to the

Contracting Officer's QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting

Officer QAE Representative to arrange for inspection/acceptance of work.