Question and Answers.pdf
PDF 100 KB Posted
- Solicitation number
- 70Z0G821Q5CV22500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers_updated_21MAY21.pdf | ||
| Attachment 2 - Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| RFQ Schedule 70Z0G821Q5CV22500.pdf | ||
| Attachment 1- Statement of Work.pdf | ||
| SF1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 5/5/2021
USCG Base Elizabeth City, NC
Facilities Engineering Department
Project: HMF-2 HVAC Unit #76 Replacement
Subject: Project Questions submitted and Answers
Question 1. Can the contractors take additional pictures during the site visit?
Answer 1. Yes, additional photographs related to this project may be taken by the Contractors.
Question 2. Given the proximity of the installation to a marine environment, are there any special coatings to condensing coils or housings which should be included when specifying the condensing unit?
Answer 2. The statement of work for this project does not have a requirement for the any coil coating.
Question 3. What is the magnitude of construction for this project?
Answer 3. Between 25,000 and 100,000
Question 4. Is this project proposing to sole source the Brand Name for the replacement units or can it be equal or better on the replacement unit?
Answer 4. No, this project is not requiring a “sole source”. The condensing equipment proposed for this project should be “equal to or exceed the existing equipment. The “brand” name or equipment manufacturer is not required to be the same manufacturer as the existing condensing equipment, that is be replaced in this project. The new condensing equipment requirements are specified in the “Technical Requirements” section of the Statement of Work and can be found on pages 5 through pages 8 of the “Statement of Work”. However, the evaporator coils and condensate drain pans are part of a very specialized air handler manufactured by Industrial Commercial Equipment Manufacturing LTD (ICE). The replacement evaporator coils and condensate drain pans must precisely fit the existing manufacturers’ (ICE) equipment to obtain the rated performance, form, fit and function as designed by the manufacturer.
Question 5. Is there a drawing showing the following:
a) The current location of the condensing unit and air handler.
b) The new location of the air handler and/or condensing unit.
c) The proposed routing for the new piping/electrical/drain lines.
d) The current location of the electrical source and proposed routing of the new electrical supply.
Answer 5.
a) No, there is not a drawing of the existing location of the condensing unit or Air Handler.
b) The new condensing unit will remain at the same location as the existing condensing unit. The existing air handler is remaining in its present location and is not being replaced. Only the existing evaporator coils and condensate pans are to be replaced.
c) There is not a drawing showing the location of the proposed new piping/ electrical/ or drain lines.
The existing refrigerant piping is routed from the condensing unit to the evaporator coils above an existing suspended ceiling. The Contractor is required, as listed in the Statement of Work, to provide a refrigerant piping plan submittal.
The electrical wiring, can be found, on pages 5 and 6 of the Scope of Work, under Technical Requirements.
The condensate drain piping is described in the Technical Requirements on page 6, also a photograph of the floor location on page 14 shows the floor drain.
d) There is no drawing for the existing electrical source, however the electrical panel that feeds the condensing unit is located to the left of the air handler and identified as Panel M3, circuit breaker # 55/57/59.