17a ABSTRACT OF BIDS for IFB 70Z0G125BSNNE0001.pdf

PDF 262 KB Posted

Attached to
Repair Waterfront - Phase I at USCG Station Portsmouth Harbor (New Castle, New Hampshire)
Solicitation number
70Z0G125BSNNE0001
Issued by

About this file

This Abstract of Offers - Construction document details bids for the Repair Waterfront - Phase I project at USCG Station Portsmouth Harbor in New Castle, New Hampshire. The solicitation (70Z0G125BSNNE0001) includes three bidders: CJR Atlantic, Inc. ($255,000), C. White Marine, Inc. ($274,825), and Riverside Marine Construction Inc. ($349,666), all submitting 20% bid security. The project involves structural waterfront repairs to pier systems and floating docks, including replacing timber bracing, struts, rubstrips, fenders, handrails, and guide posts. Key details include a bid due date of 8 July 2025 at 2:00 PM EST, a contract completion timeline of 77 calendar days from the Notice to Proceed, and is designated as a 100% Small Business Set-Aside with a project magnitude between $250,000 and $500,000. The solicitation is issued by the US Coast Guard Civil Engineering Unit Providence and will be awarded through the System for Award Management (SAM).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

70Z0G125BSNNE0001

2. DATE

ISSUED

6/5/25

DATE OPENED

7/8/25

PAGE OF PAGE

1 2

4. ISSUING OFFICE

US Coast Guard Civil Engineering Unit Providence 475 Kilvert Street Suite 100 Warwick, RI 02886

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Cam Ormiston, Contract Specialist

SIGNATURE

DATE SIGNED

7/8/25

5. PROJECT TITLE

Repair Waterfront – Phase I at USCG Station Portsmouth Harbor, New Castle, New Hampshire

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. HIRED LABOR

A. OFFEROR

CJR Atlantic, Inc

A. OFFEROR

C. White Marine, Inc.

B. REASONABLE

CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

20%

6. NUMBER OF AMENDMENTS ISSUED

1 X

C. REASONABLE

CONTRACT

(Including profit)

C. AMENDMENTS ACKNOWLEDGED

7A.

ITEM

NO.

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D.

UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Base Bid 1 LS $275,100.00 $255,000.00 $274,825.00

ABSTRACT OF OFFERS – CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER

70Z0G125BSNNE0001

PAGE OF PAGES

2 2

INSTRUCTIONS – Attach this form to OF-1419, Abstract of Offers – Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF-1419. Use additional OF-1419’s for contract items in excess of 14 and attach additional Continuation Sheets (OF-1419A) as needed.

5. PROJECT TITLE

Repair Waterfront – Phase I at USCG Station Portsmouth Harbor, New Castle, New Hampshire

4. OFFERS (Continued)

NO. 3 NO. 4 NO. 5 NO. 6

Riverside Marine Construction Inc

B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS

ACKNOWLEDGED

C.AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 BASE BID LS $349,666.00

LS

2025-07-08T14:31:37-0400
ORMISTON.CAMERON.HENRY.1512948630

File details come from the government source that posted it. Updated .