Combined Synopsis/Solicitation Number: 70Z0G122QABCD0MM3
Request for Information (RFIs)/Questions
Dated: 05/12/2022
1. Question: Do we need to supply shackles and chains to hang the fender as well?
Answer: Yes. Contractor is responsible for providing all shackles and chains for each fender.
2. Question: Is the fender being hung by 2 Point system or 4 point system? 2 point hanging system requires – 4 shackles and 2 chain lengths or 4 point hanging system requires – 6 shackles and 4 chain lengths Answer: 2 Point Hanging System
3. Question: Specify the length for each piece of chain.
Answer: 8ft length
4. Question: How long does the chain need to be?
Answer: 8ft length
5. Question: Are shackles required on both ends of the chain?
Answer: Yes.
6. Question: We know the shackle size for the fender fitting, but what size shackle is required for the other side?
Answer: All shackles will be the same size, 1.5 Inches.