This document is an amendment to a solicitation for repair of aids to navigation (ATON) at various United States Coast Guard sites in Massachusetts Bay. The United States Coast Guard Civil Engineering Unit Providence is seeking bids to provide all labor, materials, equipment, supervision, transportation, and disposal required to complete repairs to five ATON assets under a base bid and three additional ATON assets under option items. Repairs are needed for Londoner Rock Daybeacon, Boston Main Channel Light 5, Weymouth Fore River Channel Light 16, Harry's Rock Light, and Cohasset Channel Light 8. Option repairs include Whaleback Daybeacon 8, Brimbles Daybeacon, and Satan Rock Daybeacon 6. The estimated price range for the project is between $2,000,000 to $4,000,000. Sealed bids are due on September 8, 2022 by 2:00 PM local time in Warwick, Rhode Island. The period of performance is 330 days for the base bid and up to 450 days if all options are exercised.

This amendment provides responses to questions about tower measurements and soil conditions at two sites. Bidders should assume a 15 foot depth of overburden and rock socketed piles for those locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

00001

3. EFFECTIVE DATE

08/17/2022

4. REQUISITION/PURCHASE REQ.

51283PR220000074

5. PROJECT NO. (If applicable)

13494020

6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283

Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert St., Suite 100 Warwick, RI 02886

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE ACKNOWLEDGED

WITH YOUR PROPOSAL

9A. AMENDMENT OF SOLICITATION NO.

70Z0G122BABCD0074

9B. DATED (SEE ITEM 11)

8/9/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE 834953036 FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ x ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 00001 is to provide answers to questions and requests for information (see Page 2):

As of the date of this Amendment, additional questions or requests for information will not be accepted.

The due date has not been extended. Bids are due: THURSDAY, SEPTEMBER 8, 2022 AT 2:00P.M. LOCAL TIME, WARWICK, RI. All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

SEAN E. WALDRON, SR. FIELD CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10- 83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

70Z0G122BABCD0074

Amendment 0001

Repair ATON At Various USCG First District Sites in Massachusetts Bay 8/17/2022

RESPONSES TO RFI/QUESTIONS:

Q.1. Referencing Drawing S-202C: A5 states "Reinstall Truss Tower" and "Reinstall Truss Tower Ladder", I believe this should be "Provide Truss Tower" and "Provide Truss Tower Ladder". A2 depicts the tower as 20ft and the measurement extends past the deck of the tower, I believe the measurement should be 15ft to the tower deck.

A.1. Drawing S-202C, A5 states “Reinstall Truss Tower” and “Reinstall Truss Tower Ladder”, change to “Provide

Truss Tower” and “Provide Truss Tower Ladder”. The U.S. Coast Guard confirms the measurement of 15ft to the tower deck.

Q.2. Referencing Drawing S-202D: A5 states "Reinstall Truss Tower" and "Reinstall Truss Tower Ladder", I believe this should be "Provide Truss Tower" and "Provide Truss Tower Ladder". A2 depicts the tower as 20ft and the measurement extends past the deck of the tower, I believe the measurement should be 15ft to the tower deck.

A.2. Drawing S-202D, A5 states “Reinstall Truss Tower” and “Reinstall Truss Tower Ladder”, change to “Provide

Truss Tower” and “Provide Truss Tower Ladder”. The U.S. Coast Guard confirms the measurement of 15ft to the tower deck.

Preface to Questions 3 and 4:

In the notes off the Weymouth Fore River Channel Lt 16 and Harry's Rock Light, note 4, it gives a generic statement of assuming 100ftt of pile, which is a significant overstatement but more importantly not the cost driver for performing that work. When bidding a rock socket installation, the depth of mudline, i.e. how much you need to clear and prevent from collapsing is the key. A mud layer of 15 feet is significantly different than 2 feet.

Q.3. Can the USCG provide boundaries of the expected mudline thickness, distance from mudline to bedrock, for

Weymouth Fore River Channel Lt16 and Harry's Rock Light?

A.3. No historical geotechnical data was available, and no soil borings or probes were performed during the design phase.

Bidders should assume 15 feet of overburden to top of bedrock for bidding purposes.

Q.4. Are the current piles at Weymouth Fore River Channel Lt16 and Harry's Rock Light rock socket installations or driven pile?

A.4. Given the presence of rock outcroppings in the area of these two ATON’s, the designer of record conservatively assumed these piles would need to be rock-socketed. Casing shall be driven to top of bedrock, all overburden and rock tailings shall be removed before driving piles and grouting. Assume 100’ piles per Note 4 Sheets S-202C and

S-202D.