P7839442DWG .pdf

PDF 3 MB Posted

Attached to
WATERFRONT REPAIRS, U. S. COAST GUARD STATION SOUTHWEST HARBOR, ME (HANCOCK COUNTY)
Solicitation number
70Z0G120BPRV03300
Issued by

About this file

This solicitation package outlines a federal contract opportunity for waterfront repairs at the U.S. Coast Guard Station in Southwest Harbor, Maine. The contractor will be responsible for cleaning and recoating steel structures, replacing hardware, repairing concrete, and performing other maintenance and repair work on the floating docks, retaining wall, quaywall, concrete wharf, and boat hoist piers. There is also an optional bid item to clean and recoat steel sheet piles. The NAICS code is 237990 and small businesses under $36.5 million are eligible to bid. The performance period is 150 days from notice to proceed and bids are due on January 7, 2020. The estimated value is between $1,000,000 and $3,000,000. Payment and performance bonds are required. The solicitation will be available on November 22, 2019 through the Federal Business Opportunities website.

View the file

Other files

File Type Posted
Abstract of Offers_70Z0G120BPRV03300.pdf PDF
Amendment0001_20-B-PRV033.pdf PDF
SF24_Bid Bond Form.pdf PDF
P7839442SPEC.pdf PDF
IFB_70Z0G120BPRV03300.pdf PDF
General Decision Number ME20190021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP LOCATION MAP

LOCUS

LOCUS

10/15/19

L I C E N S E D

P R

O

FES S IO NA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

ROBERTS

No. 15504

DRAWING INDEX

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

N

SITE PLAN

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

CONCRETE WHARF

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

CONCRETE WHARF SECTION

A1

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

SECTION

A4

PLAN

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

PLAN

SECTION

A4

2 2 2 2

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

2 4

PLAN

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

N

PLAN

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

A

N

PLAN

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

SECTION

A2

N

2222 2

2 2 2

3 4

ABOVE DECK PIER PLAN UNDER DECK PIER PLAN

N

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

RETAINING WALL SECTION QUAY WALL SECTION

A1 A3

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

UNDER DECK SECTION

B1 B2

UNDER DECK SECTION

4 4

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

GROUT CHINKING PACKET

A1

EDGE SPALL REPAIR

C1

UNDERSIDE OF CAP REPAIR

C2

CONCRETE SPALL REPAIR

B1

GANGWAY RUB STRIP DETAIL

B2

PILE HOLE PLUG

B3

DECK SPALL REPAIR

C4

UNDERSIDE OF DECK SPALL REPAIR

B4

GROUT BAG VOID REPAIR

A4

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

EXPANSION JOINT

C2

STRUT REPAIR DETAIL

B1

CONCRETE SPALL REPAIR AT JOINT

C4

HANDRAIL REPAIR

A4

GANGWAY PLATFORM CONNECTION

A3

CONCRETE SPALL DISINTERGRATION REPAIR

C1

RUBBERIZED MEMBRANE REPAIR

B2

QUAYWALL SECTION

A1

GANGWAY TREAD CONNECTION

B3

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

ANODE CONNECTION

B4

ANODE CONNECTION

B3

A A

SECTION A-A

FRP JACKET INSTALLATION

B1

FENDER SYSTEM REPLACEMENT

A2

LADDER DETAIL

A1

10/15/19

L I C E N S E D

P R

O

FES S IONA L ENG

IN

E E R

ST

ATEOFMAINE

CHARLES W.

MARSHALL

2019-10-28T16:22:42-0400
CAROSOTTO.MICHAEL.P.1021033398

File details come from the government source that posted it. Updated .