DRAWINGS_CC-1309_IFB_70Z0G119BPFA0080R.pdf

PDF 9 MB Posted

Attached to
REPLACE ROOF MUNRO HALL USCG ACADEMY NEW LONDON CT PROJECT #2524388
Solicitation number
70Z0G119BPFA0080R
Issued by

About this file

DRAWINGS CC-1309 (7 SHEETS), INVITATION FOR BID (IFB) 70Z0G119BPFA0080R, REPLACE ROOF MUNRO HALL USCG ACADEMY NEW LONDON CT PROJECT #2524388

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N.Y.

C

N.J.

B

A

MASS.

HARTFORD

CONNECTICUT

NEW LONDON

COAST GUARD

ACADEMY

LOCATION MAP

SCALE: NONE

CREW PIER

a R.t¥i!IIG

THAMES RIVER

PROJECT LOCATION

MUNRO HALL

2��=::::

'c•,-'

DETAIL SITE MAP

SCALE: NONE

R. I.

BLOCK

ISLAND

REPLACE

MUNRO

AT

ROOF

HALL

U.S. COAST GUARD ACADEMY

NEW LONDON, CONNECTICUT

I f

PROJECT DESCRIPTION

BASE BID:

PROVIDE ALL EQUIPMENT, MATERIALS. LABOR, AND SUPERVISION NECESSARY TO

COMPLETELY REMOVE AND REPLACE EXISTING ROOF SYSTEM ON THE MAIN ROOF,

PENTHOUSE ROOF, THIRD FLOOR ENTRY CANOPY ROOFS ON MUNRO HALL AT THE U.S.

COAST GUARD ACADEMY.

ABATEMENT:

SOME LOCATIONS OF THE ORIGINAL ROOF MASTIC (BOTTOM LAYER NEXT TO CONCRETE)

WHERE NOTED CONTAIN ASBESTOS AND SHALL BE REMOVED AND PROPERLY DISPOSED OF

BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. THE EXISTING MULTI-PLY BUILT-UP

ROOF MEMBRANE DOES NOT CONTAIN ASBESTOS.

THE EXISTING PAINT IA ASSUMED TO BE LEAD BASED DUE TO THE AGE OF THE BUILDING.

FOLLOW ALL LEAD SAFETY PRECAUTIONS AND REGULATIONS WHEN CUTTING, SANDING.ETC.

ANY PAINTED SURFACE CONTAINING LEAD. LEAD ABATEMENT IS NOT PART OF THE

PROJECT, EXCEPT AS NOTED ON DRAWINGS.

REMOVAL:

THE PROJECT INCLUDES COMPLETE REMOVAL OF EXISTING LOW SLOPE MULTI-PLY

BUILT-UP ROOF SYSTEM, INSULATION, VAPOR BARRIER, FLASHING, ETC. DOWN TO THE

CONCRETE DECK. REMOVE, SALVAGE, AND RECYCLE METAL COPINGS, FLASHING,

MISCELLANEOUS METAL, ETC. RECYCLE AS NOTED IN DOCUMENTS AND PROVIDE CREDIT TO

THE GOVERNMENT FOR RECYCLED MATERIAL. REMOVE EXISTING ROOF HATCHES AND

SAFETY RAILS. REMOVE AND RECYCLE OR PROPERLY DISPOSE OF ALL CONSTRUCTION

DEBRIS. PROTECT EXISTING BUILDING COMPONENTS LANDSCAPING, ETC. THAT ARE TO

REMAIN FROM DAMAGE.

INSTALLATION:

PATCH AND REPAIR CONCRETE DECK AS REQUIRED FOR INSTALLATION OF NEW ROOF

SYSTEM. EXTENT OF ANY PATCHING AND REPAIR OF CONCRETE ROOF DECK WILL BE

DETERMINED BY INSPECTION AFTER DECK IS EXPOSED AND WILL BE ADDRESSED BY

CHANGE ORDER AT THAT TIME. PROVIDE A MEMBRANE ROOFING SYSTEM; INCLUDING FULLY

ADHERED VAPOR BARRIER, POLYISOCYANURATE INSULATION, TAPERED INSULATION BOARD, ½"

THICK HIGH DENSITY COVER BOARD, 60 MIL EPDM MEMBRANE, FLASHING, ETC. PROVIDE

NEW EPDM FLASHING AT WALLS, PIPE PENETRATIONS, ETC. PROVIDE WOOD BLOCKING,

FLASHING, METAL EDGE FLASHING, AND ALL REQUIRED ACCESSORIES FOR A COMPLETE AND

WATER TIGHT ROOF SYSTEM. PROVIDE NEW LEAD COATED COPPER FLASHING AND FASCIA,

EDGE FLASHING, AND SCUPPER DRAINS AS NOTED ON DRAWINGS. REMOVE AND REPLACE

SEVERAL COURSES OF BRICK AT WALL FLASHING, NEW BRICK TO MATCH EXISTING, REPLACE

WALL FLASHING AND COUNTER F;LASHING WITH 20 OZ COPPER FLASHING, ADD WEEPS TO

JOINTS ABOVE FLASHING AND POINT JOINTS WITH LIME MORTAR. REMOVE AND REPLACE

EXISTING ROOF DRAINS AND DOME STRAINERS, CAST IRON PIPE AND FITTINGS, AND

CONNECT TO EXISTING ROOF LEADERS, TEN ( 1 0) LOCATIONS.

PROVIDE NEW ROOF HATCHES AND SAFETY RAILS TWO (2) LOCATIONS.

PROVIDE NEW PAINTED LADDER BETWEEN MAIN ROOF AND PENTHOUSE ROOF.

SCHEDULE:

ON-SITE SHALL BE PREFORMED BETWEEN EARLY APRIL, 2019 WEATHER PERMITTING AND

EARLY AUGUST, 2019.

BUILDING CODE INFORMATION

INTERNATIONAL BUILDING CODE (IBC-ICC) - 2018

INTERNATIONAL MECHANICAL CODE (IMC-ICC) - 2018

INTERNATIONAL PLUMBING CODE (IPC-ICC) - 2018

INTERNATIONAL ENERGY CONSERVATION CODE (IECC-ICC) - 2018

LIFE SAFETY CODE (NFPA 101) - 2018

NATIONAL ELECTRICAL CODE (NFPA 70) - 2017

ACCESSIBILITY STANDARD (ICC/ANSI A117.1-2009 & ADA REGULATIONS 201 O)

DRAWING

DRAWING NO.

G-001

ARCHITECTURAL

AD-100

A-100 A-301 A-302 A-303 A-401

LIST

DRAWING TITLE

COVER SHEET

DEMOLITION PLANS

ROOF PLANS

ROOF DETAILS

ROOF DETAILS

ROOF DETAILS

PHOTOS

SHEET SEQUENCE

C

B

A

Notes

U. S. COAST GUARD

ACADEMY

U.S. COAST GUARD ACADEMY

15 MOHEGAN AVE.

NEW LONDON, CT 06320

ISSUE

12/18/18 BID DOCUMENTS

MARK DATE DESCRIPTION

A/E PROJECT NO:

CAD FILE NAME: CC-1309-2524388-1-7-G

DESIGNED BY: J E Gearity DRAWN BY: KHollowa

EDITED BY:

CHECKED BY:

SCALE: AS NOTED PLOT SCALE: 1 = 1

SHEET TITLE

REPLACE ROOF MUNRO HALL

U.S. COAST GUARD ACADEMY

NEW LONDON CT

GENERAL

COVER SHEET

REVIEWED BY: APPROVED BY:

J E Gearity G. J. Carabine

PROJECT ENG. CHIEF, CONST. & ENGINEERING

S. C. ACOSTA, CDR 2/04/19

CHIEF OF BRANCH DATE

PROJECT NUMBER DRAWING NUMBER

2524388 CC-1309

DISCIPLINE SHT NO

G-001 SHEET 1 OF 7

2019-02-04T08:34:31-0500
CARABINE.GREGORY.JOHN.1017185477
2019-02-04T15:33:57-0500
ACOSTA.STEVEN.C.1013865430