SOLICITATION_AMENDMENT_0001_70Z0G118QPFA00500_REPLACE_ROOF_LOWER_MECHANICAL_ROOM_MUNRO_HALL_USCG_ACADEMY.pdf

PDF 86 KB Posted

Attached to
REPLACE ROOF LOWER MECHANICAL ROOM MUNRO HALL USCG ACADEMY NEW LONDON CT PROJECT #4780868
Solicitation number
70Z0G118QPFA00500
Issued by

About this file

SOLICITATION AMENDMENT 0001 REQUEST FOR QUOTE 70Z0G118QPFA00500 REPLACE ROOF LOWER MECHANICAL ROOM MUNRO HALL USCG ACADEMY

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. DATE

19 DEC 2017

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG Civil Engineering Unit 475 Kilvert St. Suite 100 Warwick, RI 02886

Same as block #6

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE

ACKNOWLEDGED WITH YOUR QUOTE

X

9A. AMENDMENT OF SOLICITATION NO.

70Z0G118QPFA00500

9B. DATED (SEE ITEM 11)

12/01/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

THE HOUR AND DATE SPECIFIED FOR RECEIPT OF QUOTES REMAINS 29 DECEMBER 2017 AT 4:00 P.M.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. The solicitation referenced in Block #9A is hereby amended as follows:

a. In response to a request for information from an interested vendor, the following question and answer is provided:

Question: Can the ladders that need to be abated be removed from the building wrapped in plastic and abated off site and temp ladders put in place?

Answer: USCGA considers this means and methods. The contractor may protect and abate the ladders in place or remove the ladders and abated off site. If the ladders are abated in place the rusted and missing anchors shall be replaced with new anchors. If ladders are removed new anchors shall be provided. New anchors shall be torque-controlled expansion anchors or chemical anchors of alloy group 1 (A1) 304 stainless-steel or group 2 (A2) 316 stainless-steel bolts, ASTM F 593 and nuts, ASTM F594.

b. All other terms and conditions remain unchanged.

2. The hour and date specified for receipt of quotes remains 4:00 p.m. on Friday 29 December 2017.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TERESA LAMPHERE

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

12/19/2017

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83)

2017-12-19T17:58:08-0500
LAMPHERE.TERESA.LOUISE.1155638873

File details come from the government source that posted it.