- BOILER REPLACEMENT, CG BASE CAPE COD, MA
- Solicitation number
- 70Z0G118BPRV08300
About this file
Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID_ABSTRACT.pdf | ||
| AMEND002PRV083.pdf | ||
| AMEND001PRV083.pdf | ||
| 70Z0G118BPRV083.pdf | ||
| P8529715DWGS.pdf | ||
| WAGERATEPRV083.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SHORE INFRASTRUCTURE LOGISTICS CENTER
SPECIFICATIONS FOR
DISCREP: Replace Boiler Bldg AF-124
PSN 8529715
AT
USCG BASE Cape Cod Buzzards Bay, MA (Barnstable County)
LT Joshua Smolowitz Gerry Gosselin Design Project Mgr. Design Branch Chief
A. A. JACOBS, BY DIRECTION
COMMANDING OFFICER
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
475 KILVERT ST. SUITE 100
WARWICK, RHODE ISLAND 02886
USCG BASE CAPE COD PSN 8529715
REPLACE BOILER AF-124
TABLE OF CONTENTS
TABLE OF CONTENTS
SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 00 Work Restrictions 01 32 00 Construction Schedule 01 33 00 Submittal Procedures, Submittal Register, Schedule of Values 01 35 29 Safety and Occupational Health 01 50 00 Temporary Facilities and Controls 01 57 19 Temporary Environmental Controls 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data
DIVISION 03 – CONCRETE
03 30 53 Misc Cast In Place Concrete
DIVISION 09 – FINISHES
09 90 00 Paints and Coatings
DIVISION 23 - MECHANICAL
23 00 00 Photographs 23 03 00 Basic Mechanical Materials and Methods 23 05 00 Common Work Results for HVAC 23 09 33 Electric and Electronic Control System for HVAC 23 52 00 Heating Boilers
DIVISION 26 – ELECTRICAL
26 00 00 Basic Electrical Materials and Methods 26 05 19 Insulated Wire and Cable
26 20 00 Interior Distribution System
DRAWINGS
G-001 Title Sheet M-101 Mechanical Boiler Room Plan, Sequence of Operation M-601 Schedules
-- End of Project Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
11/07
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
Demolish existing 800 MBH natural gas fired boiler and associated pumps, piping, valves, accessories and controls located in the AF-124 boiler room.
Replace with two new 550MBH boilers and accessory equipment as specified.
Expand concrete pads as necessary to support new boilers. Demolish and replace existing boiler exhaust vent and exterior stack. Demo and replace mechanical room combustion & ventilation (C&V) air. Demo and Replace Boiler Room Electrical Distributions Panel. Demo abandoned expansion tank. Reroute gas piping around boilers.
Other incidental work as indicated or specified. There are no optional bid items.
1.1.2 Location
U.S. Coast Guard BASE Cape Cod Bldg AF-124 Buzzards Bay, MA 02542
The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 SUPERVISION
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
SECTION 01 11 00 Page 2
1.4 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work. Major subcontractors who will engage in the work shall also attend.
1.5 INSPECTION
The Contractor shall keep the Contracting Officer or duly appointed representative fully informed of contract operations and plans so that a representative may arrange to be present at various times that work is being performed.
1.5.1 Contractor’s Daily Log
The Contractor shall complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector. The Government Inspector will attest to its accuracy by initialing the form and forwarding that form to CEU Providence. The form will be provided to the Contractor by the Contracting Officer’s Representative.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
--End of Section--
SECTION 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
02/10
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.1.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contracting Officer Monday through Friday, excluding Government holidays.
1.1.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 7 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.1.4 Occupied and Existing Building[s]
The Contractor shall be working in an existing building which is occupied.
Protect government furnishings and equipment against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
1.1.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, SECTION 01 14 00 Page 2 compressed air, and natural gas shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."
1.2 SECURITY REQUIREMENTS
1.2.1 Areas Not Covered by Contract
The Contractor will not be permitted to enter buildings or areas not covered by the work included in this contract, except by prior approval of the Contracting Officer.
1.2.2 Parking
Do not park inside the airport perimeter at any time. An exception may be made for vehicles which are part of the equipment needed to do the required work; for example, a truck which uses a mounted generator or a vehicle with built-in equipment. All vehicles must be authorized by the airport manager prior to being allowed access to within the airport perimeter. Coordinate access permission with the contracting officer.
Section 01 32 00 Page 1
SECTION 01 32 00
CONSTRUCTION SCHEDULE
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00, "Submittal Procedures."
SD-01 Preconstruction Submittals
Construction Schedule
Schedule of Values
1.2 CONSTRUCTION SCHEDULE
At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the Contracting Officer. For contracts under $25,000, a Schedule of Values is not required. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.
The Construction Schedule shall clearly indicate the start and completion dates of major work components. The Schedule of Values shall clearly indicate unit value of all major work components.
The Construction Schedule shall incorporate at a minimum the following activities:
a. Mobilization
b. Demobilization
c. Pre-Construction Submittals
d. Work Activities
e. In-Progress Submittals
f. Final Government Inspection
g. Close-Out Submittals; i.e. Testing Balancing Reports, Warranties, Operation and Maintenance Manuals, Posted Instructions
h. As-Built Drawings
i. Factors which Constitute Potential Interruptions to Station Operations
Section 01 32 00 Page 2
Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. Contractor shall annotate all such activities into the progress schedule with their forecasted time periods.
These activity periods shall not be exclusive of the contract performance period. No site work shall commence until the respective submittals have been approved.
The value of all major work components within the project shall be identified on the Schedule of Values on a unit quantity and unit cost basis, e.g. number of squares and cost per square of roofing, number of lineal feet and cost per lineal foot of conduit, number of panels and cost per panel etc. Lump sum items shall only be paid for when 100% complete.
Do not include mobilization and demobilization line items on the Schedule of Values.
The Construction Schedule and Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job.
Omissions and errors on the Construction Schedule and Schedule of Values are the responsibility of the Contractor.
Payments will not be made until the schedule of prices has been submitted to and approved by the Contracting Officer.
1.3 UPDATED SCHEDULES
Update the construction schedule and equipment delivery schedule at monthly intervals or when schedule has been revised. Reflect any changes occurring since the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
3.1 PROGRESS UPDATES
3.1.1 General
A revised Construction Schedule/Schedule of Values shall be issued by the Contractor on a monthly basis. In addition, any revisions to the Construction Schedule/Schedule of Values such as modifications or delays shall be reflected by Contractor submission of an updated Construction Schedule/Schedule of Values.
3.1.2 Modifications
When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule and Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change. Enter all modifications in this manner in sequential order.
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1.1 DEFINITIONS
1.1.1 Submittal
Shop drawings, product data, samples, and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Types of Submittals
All submittals are classified as indicated in paragraph "Submittal Descriptions (SD)". Submittals also are grouped as follows:
a. Shop drawings: As used in this section, drawings, schedules, diagrams, and other data prepared specifically for this contract, by contractor or through contractor by way of subcontractor, manufacturer, supplier, distributor, or other lower tier contractor, to illustrate portion of work.
b. Product data: Preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer's descriptive literature, catalog data, and other data to illustrate portion of work, but not prepared exclusively for this contract.
c. Samples: Physical examples of products, materials, equipment, assemblies, or workmanship that are physically identical to portion of work, illustrating portion of work or establishing standards for evaluating appearance of finished work or both.
d. Administrative submittals: Data presented for reviews and approval to ensure that administrative requirements of project are adequately met but not to ensure directly that work is in accordance with design concept and in compliance with contract documents.
1.1.3 Submittal Descriptions (SD)
Construction Progress Schedule Submittal register Schedule of values Health and safety plan Work plan Quality control plan Environmental protection plan
SECTION 01 33 00 Page 2
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the contractor for integrating the product or system into the project.
Drawings prepared by or for the contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
SECTION 01 33 00 Page 3
Daily checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative to confirm compliance with manufacturer's standards or instructions.
Factory test reports.
SD-10 Operation and Maintenance Data
Data intended to be incorporated in operations and maintenance manuals.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
As-built drawings
Special warranties
Posted operating instructions
Training plan
1.1.4 Approving Authority
Person authorized to approve submittal.
1.1.5 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce construction and materials, SECTION 01 33 00 Page 4 products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Submit the following in accordance with the requirements of this section.
Submittal register
1.3 USE OF SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data in columns (a), (b), (c), and (d) as delivered by government.
1.3.1 Submittal Register
Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Complete the following on the register:
Column (e) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
1.4 PROCEDURES FOR SUBMITTALS
1.4.1 Reviewing, Certifying, Approving Authority
Government organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Project Manager unless otherwise specified for specific submittal.
1.4.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.4.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
SECTION 01 33 00 Page 5
b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 10 working days. Period of review for each resubmittal is the same as for initial submittal.
1.4.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to government.
1.4.4.1 Proposing Variations
When proposing variation, deliver written request to the contracting officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to government. If lower cost is a benefit, also include an estimate of the cost saving. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.4.4.2 Warranting That Variation Are Compatible
When delivering a variation for approval, contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work, and deliver the same service life and performance.
1.4.4.3 Review Schedule Is Modified
In addition to normal submittal review period, a period of 5 working days will be allowed for consideration by the Government of submittals with variations.
1.4.5 Contractor's Responsibilities
a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.
b. Transmit submittals to Contracting Officer in accordance with schedule on approved Submittal Register, and to prevent delays in the work, delays to government, or delays to separate contractors.
c. Advise contracting officer of variation, as required by paragraph entitled "Variations."
d. Correct and resubmit submittal as directed by approving authority.
When resubmitting disapproved transmittals or transmittals noted for resubmittal, the contractor shall provide copy of that previously submitted transmittal including all reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
e. Furnish additional copies of submittal when requested by contracting officer, to a limit of 4 copies per submittal.
SECTION 01 33 00 Page 6
f. Complete work which must be accomplished as basis of a submittal in time to allow submittal to occur as scheduled.
g. Ensure no work has begun until submittals for that work have been returned as "approved," except to the extent that a portion of work must be accomplished as basis of submittal.
1.4.6 Government Responsibilities
a. Note date on which submittal was received from contractor on each Contract Item Approval Request Form.
b. Review each submittal; and check and coordinate each submittal with requirements of work and contract documents.
c. Review submittals for conformance with project design concepts and compliance with contract documents.
d. Ensure that material is clearly legible.
e. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
f. Identify returned submittals with one of the actions defined in paragraph entitled "Actions Possible" and with markings appropriate for action indicated.
1.4.7 Actions Possible
Submittals will be returned with one of the following notations:
a. Submittals marked "approved" "approved as submitted" authorize contractor to proceed with work covered.
b. Submittals marked "approved" "see below" authorize contractor to proceed with work as noted provided contractor takes no exception to the notations.
c. Submittals marked "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
1.5 FORMAT OF SUBMITTALS
1.5.1 Transmittal Form
Transmit each submittal electronically, unless otherwise noted in the submittal register and/or where electronic submission is not feasible (i.e.
samples), to office of approving authority. The maximum file size that may be emailed is 10 MB; anything larger must be submitted hard copy or on a CD.
Transmit submittals with transmittal form prescribed by contracting officer and standard for project. The transmittal form shall identify contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying
SECTION 01 33 00 Page 7
Submittals." Process transmittal forms to record actions regarding sample panels and sample installations. Note: Submittals requiring hard copy submission shall be provided with carbon copy transmittal form provided by the government.
1.5.2 Identifying Submittals
Identify submittals, except sample panel and sample installation, with the following information on each separate component of each submittal and transmittal form. The maximum file size for electronic submittals shall be no larger than 10 MB. Identify each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description (SD) number of each component of submittal.
e. When a resubmission, alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.
f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier contractor associated with submittal.
g. Product identification and location in project.
1.5.3 Format for Product Data
a. Present product data submittals for each section. Include table of contents, listing page and catalog item numbers for product data.
b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.
c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project.
1.5.4 Format for Shop Drawings
a. Shop drawings shall not be less than 8 1/2 by 11 inches nor more than 30 by 42 inches.
b. Present 8 1/2 by 11 inches sized shop drawings as part of the submittals required by section. Present larger drawings in sets.
c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."
SECTION 01 33 00 Page 8
d. Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Shop drawing dimensions shall be the same unit of measure as indicated on the contract drawings. Identify materials and products for work shown.
1.5.5 Format of Samples
a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:
(1) Sample of Equipment or Device: Full size.
(2) Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.
(3) Sample of Materials Exceeding 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.
(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.
(6) Color Selection Samples: 2 by 4 inches.
(7) Sample Panel: 4 by 4 feet.
(8) Sample Installation: 100 square feet.
b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.
c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated. Incorporated samples shall be in undamaged condition at time of use.
d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final clean up of project.
e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.5.6 Format of Administrative Submittals
a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply contractor's approval stamp to document, but to a separate sheet accompanying document.
SECTION 01 33 00 Page 9
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Copies of Product Data
a. When hard copy submission is required, submit four copies of submittals of product data.
1.6.2 Number of Copies of Shop Drawings
Submit shop drawings in compliance with quantity requirements specified for product data.
1.6.3 Number of Samples
a. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to contractor.
b. Submit one sample panel. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
1.6.4 Number of Copies of Administrative Submittals
a. Unless otherwise specified, submit administrative submittals compliance with quantity requirements specified for product data.
LOA: Contract #:
PSN 8529715 Award Date: TBD DAFIS: Task Order #:
TIN / FEIN: Award:
Phone: FAX:
N/A Invoice Date: N/A Period From: N/A To: N/A A C D E F G H I J
Item No. Contract Value
Previous Period
(Prev. D+E) Current
(This Period)
Presently Stored
(Not in D or E)
Completed and Stored (D+E+F)
% Complete (G/C)
Balance to Finish (C-G) Retainage
1 $0.00 $0.00 $0.00 $0.00 0% $0.00 2 $0.00 $0.00 $0.00 $0.00 0% $0.00 3 $0.00 $0.00 $0.00 $0.00 0% $0.00 4 $0.00 $0.00 $0.00 $0.00 0% $0.00 5 $0.00 $0.00 $0.00 $0.00 0% $0.00 6 $0.00 $0.00 $0.00 $0.00 0% $0.00 7 $0.00 $0.00 $0.00 $0.00 0% $0.00 8 $0.00 $0.00 $0.00 $0.00 0% $0.00 9 $0.00 $0.00 $0.00 $0.00 0% $0.00 10 $0.00 $0.00 $0.00 $0.00 0% $0.00
Pre-Construction Submittals
Invoice No.:
Project:
Project No.:
Contractor:
Address:
Replace Boiler TBD
Boilers & Accessoires - Labor Boilers & Accessoires - Material Electrical
TBD
Commanding Officer, USCG Civil Engineering Unit - Providence
PROGRESS PAYMENT REQUEST - BREAKDOWN
Work Completed
B
USCG Base Cape Cod bldg. AF-
Controls
Demolition
Contract Work Item Description
Mobilization
Bonds
TBD
11 $0.00 $0.00 $0.00 $0.00 0% $0.00 12 $0.00 $0.00 $0.00 $0.00 0% $0.00 13 $0.00 $0.00 $0.00 $0.00 0% $0.00 14 $0.00 $0.00 $0.00 $0.00 0% $0.00 15 $0.00 $0.00 $0.00 $0.00 0% $0.00 16 $0.00 $0.00 $0.00 $0.00 0% $0.00 17 $0.00 $0.00 $0.00 $0.00 0% $0.00 18 $0.00 $0.00 $0.00 $0.00 0% $0.00 19 $0.00 $0.00 $0.00 $0.00 0% $0.00 20 $0.00 $0.00 $0.00 $0.00 0% $0.00 21 $0.00 $0.00 $0.00 $0.00 0% $0.00 22 $0.00 $0.00 $0.00 $0.00 0% $0.00 23 $0.00 $0.00 $0.00 $0.00 0% $0.00 24 $0.00 $0.00 $0.00 $0.00 0% $0.00 25 $0.00 $0.00 $0.00 $0.00 0% $0.00 26 $0.00 $0.00 $0.00 $0.00 0% $0.00 27 $0.00 $0.00 $0.00 $0.00 0% $0.00 28 $0.00 $0.00 $0.00 $0.00 0% $0.00 29 $0.00 $0.00 $0.00 $0.00 0% $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
$0.00 Total MODs: $0.00 Current Total:Original Award: $0.00
Closeout Submittals Demobilization
Record Drawings
Final Government Inspection
PERCENTAGE
OF TOTAL
CONTRACT
COST
DURATION OF WORK ITEM
(Indicates Friday date of each contract week in row below)
ESTIMATED
COST
CONTRACT NUMBER:
PROJECT LOCATION: Replace Boiler
TBDTASK ORDER NUMBER:
CONTRACT WORK ITEM
CONTRACTOR Name, Address & Phone:
LIMIT TO COMPLETE DATE:
NOTICE TO PROCEED DATE:
LIMIT TO COMMENCE DATE:TBD
PSN 8529715
CONTRACTOR'S SCHEDULE OF VALUES AND
PROPOSED PROGRESS SCHEDULE
PROJECT PSN:
0PROJECT TITLE: USCG Base Cape Cod bldg. AF-124
1/0 1/7
1/14 1/21 1/28 2/4
2/11 2/18 2/25 3/3
3/10 3/17 3/24 3/31 4/7
4/14 4/21
PERCENTAGE
OF TOTAL
CONTRACT
COST
Bonds
ESTIMATED
COST
CONTRACT WORK ITEM
1 $0.00 #DIV/0!
2 $0.00 #DIV/0!
3 $0.00 #DIV/0!
4 $0.00 #DIV/0!
5 $0.00 #DIV/0!
6 $0.00 #DIV/0!
7 $0.00 #DIV/0!
8 $0.00 #DIV/0!
9 $0.00 #DIV/0!
10 $0.00 #DIV/0!
11 $0.00 #DIV/0!
12 $0.00 #DIV/0!
13 $0.00 #DIV/0!
14 $0.00 #DIV/0!
15 $0.00 #DIV/0!
16 $0.00 #DIV/0!
17 $0.00 #DIV/0!
18 $0.00 #DIV/0!
19 $0.00 #DIV/0!
20 $0.00 #DIV/0!
21 $0.00 #DIV/0!
22 $0.00 #DIV/0!
23 $0.00 #DIV/0!
24 $0.00 #DIV/0!
25 $0.00 #DIV/0!
26 $0.00 #DIV/0!
27 $0.00 #DIV/0!
28 $0.00 #DIV/0!
29 $0.00 #DIV/0!
TOTAL COST: $0.00 #DIV/0!
DATE: DATE:
Electrical
Controls
Bonds Pre-Construction Submittals
Boilers & Accessoires - Labor
DATE:APPROVED BY (Contract Specialist signature:)SUBMITTED BY (Contractor sign): REVIEWED BY: (PM signature):
Page 1 of ___
Boilers & Accessoires - Material
Demolition
Mobilization
Final Government Inspection
Demobilization
Closeout Submittals
Record Drawings
CONTRACTOR NAME & ADDRESS:
January 0, 1900
January 0, 1900
NOTICE TO PROCEED DATE:
LIMIT TO COMMENCE DATE:
LIMIT TO COMPLETE DATE: January 0, 1900
TBD
PERCENTAGE
OF TOTAL
CONTRACT
COST
DURATION OF WORK ITEM
(Indicates Friday date of each contract week in row below)
ESTIMATED
COST
PSN 8529715
CONTRACTOR'S SCHEDULE OF VALUES AND
PROPOSED PROGRESS SCHEDULE
PROJECT PSN:
0PROJECT TITLE:
PROJECT LOCATION: Replace Boiler
TBDTASK ORDER NUMBER:
CONTRACT WORK ITEM
USCG Base Cape Cod bldg. AF-124
CONTRACT NUMBER:
4/28 5/5
5/12 5/19 5/26 6/2 6/9
6/16 6/23 6/30 7/7
7/14 7/21 7/28 8/4
8/11 8/18 8/25
PERCENTAGE
OF TOTAL
CONTRACT
COST
ESTIMATED
COST
CONTRACT WORK ITEM
Bonds1 $0.00 #DIV/0!
2 $0.00 #DIV/0!
3 $0.00 #DIV/0!
4 $0.00 #DIV/0!
5 $0.00 #DIV/0!
6 $0.00 #DIV/0!
7 $0.00 #DIV/0!
8 $0.00 #DIV/0!
9 $0.00 #DIV/0!
10 $0.00 #DIV/0!
11 $0.00 #DIV/0!
12 $0.00 #DIV/0!
13 $0.00 #DIV/0!
14 $0.00 #DIV/0!
15 $0.00 #DIV/0!
16 $0.00 #DIV/0!
17 $0.00 #DIV/0!
18 $0.00 #DIV/0!
19 $0.00 #DIV/0!
20 $0.00 #DIV/0!
21 $0.00 #DIV/0!
22 $0.00 #DIV/0!
23 $0.00 #DIV/0!
24 $0.00 #DIV/0!
25 $0.00 #DIV/0!
26 $0.00 #DIV/0!
27 $0.00 #DIV/0!
28 $0.00 #DIV/0!
29 $0.00 #DIV/0!
TOTAL COST: $0.00 #DIV/0!
DATE: DATE:
Pre-Construction Submittals
Demolition
Mobilization
Bonds
Boilers & Accessoires - Material
Boilers & Accessoires - Labor
Electrical
Controls
Closeout Submittals
Record Drawings
DATE:APPROVED BY (Contract Specialist signatur:)SUBMITTED BY (Contractor sign): REVIEWED BY: (PM signature):
Final Government Inspection
Demobilization
Project: Replace Boiler Contract #: TBD Project No.: Task Order #: TBD
Contractor: TIN / FEIN: 0 -
Address: Phone: 0 -
N/A Invoice Date: N/A Period From: N/A To: N/A
TO: Contracting Officer
1 $0.00
2 $0.00
3 $0.00
4 $0.00
5 $0.00
6 $0.00
7 0% $0.00
8 $0.00
9 $0.00
10 $0.00
11 $0.00 title DATE: N/A
DATE:
DATE:
DATE:
Invoice #:
COTR - Contracting Officer's Technical Representative print name
I hereby certify, to the best of my knowledge and belief, that:
The request is made for payment as shown below in connection with the contract. The present status of the account for this contract is as follows:
AMOUNT RECOMMENDED FOR PAYMENT
signature
COTR (_________________________):
CONTRACT SPECIALIST / KO (_________________________):
signature
PSN 8529715
STORED MATERIALS SUBTOTAL
NET AMOUNT OF CONTRACT
ACTIVITIES COMPLETED TO DATE
1. The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract.
2. Payments to subcontractors and supplies have been made from previous payments received under the contract, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with the subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
3. This request for progress payment does not include any amounts which the prime contractor intends to withhold or retain from a contractor or supplier in accordance with the terms and conditions of the construction;
and
4. This certificate is not to be construed as final acceptance of a Subcontractor's performance.
ORIGINAL CONTRACT SUM
LESS RETAINAGE
TOTAL ALLOWANCES TO DATE
Commanding Officer, USCG Civil Engineering Unit - Providence
REQUEST FOR PROGRESS PAYMENT
USCG Base Cape Cod print name
TITLE:
SIGNATURE:
I have received this payment request and agree that the Contractor is entitled to payment in the amount shown.
CHANGES AUTHORIZED
signature KO - Contracting Officer print name
GOVERNMENT INSPECTOR (_________________________):
CONTRACT BALANCEnameNAME:
MONEY VALUE ALLOWED TO DATE
LESS PREVIOUS PAYMENTS
SUBMITTAL REGISTER
Specification Section Number or Item Number
SD No., and Type of Submittal Material or Product
Specification Paragraph Number.
Requires Hard Copy Submission
Planned Submittal Date
Date Fwd to Appr Auth /Date Recd From Contr
Date Fwd to Other Reviewer
Date Recd From Other Reviewer
Action Code
Date of Action
Mailed to Contr / Recd From Appr Auth
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
Section
01 32 00
SD-01,
Preconstruction Submittals
1.1
1 Construction Schedule/Schedule of Values
1.1
Section
01 35 29
SD-07, Certificates 1.2
2 Accident Prevention Plan
1.2
3 Activity Hazard Analysis
1.2
Section
01 35 29
SD-11, Closeout Submittals
1.2
4 Reports 1.2
5 Certificate of Compliance
1.2
Section
01 50 00
SD-01
Preconstruction Submittals
1.2
6 Construction Site Plan
1.2
Section
01 57 19
SD-01
Preconstruction Submittals
1.3
7 Environmental Protection Plan
1.3.
8 Storage Inventory Form
1.3
Section
01 57 19
SD-06 Test Reports
1.3
9 Laboratory analysis
1.3
Section
01 57 19
SD-11, Closeout Submittals
1.3
10 Preconstruction Survey
1.3
11 Solid Waste Disposal Permit
1.3.
12 Waste Determination
1.3
13 Disposal documentation for hazardous and regulated waste
1.3
14 Contractor 40 CFR employee training records
1.3
15 Regulatory Notification
1.3
16 Solid Waste Disposal Report
17 Contractor Hazardous Material Inventory Log
1.3.
Section
01 77 00
SD-10 Operation and Maintenance Data
1.1
18 Equipment/Product Warranty List
1.1
Section
01 77 00
SD-11, Closeout Submittals
1.1
19 As-Built Drawings 1.1
20 Record of Materials
1.1
Section
03 30 53
SD-02, Shop Drawings
1.3
21 Installation Drawings
1.3
Section
03 30 53
SD-06 Test Reports
1.3
22 Compressive Strength Testing
1.3
Section
03 30 53
SD-07 Certificates 1.3
23 Certificates 1.3
Section
09 90 00
SD-02 Shop Drawings
1.2
24 Piping Identification
1.2
25 Color Stencil Codes
1.2
Section
09 90 00
SD-03 Product Data
1.2
26 Coating 1.2
27 Sealant 1.2
Section
09 90 00
SD-08
Manufacturer’s Instructions
1.2
28 Application Instructions
1.2
29 Manufacturer’s
MSDS
1.2
30 Env. Cond. for applying paint
1.2
Section
23 05 00
SD-01
Preconstruction Submittals
1.3
31 Material, Equipment, and Fixture lists
1.3
Section
23 05 00
SD-02 Shop Drawings
1.3
32 Record Drawings 1.3
33 Fabrication Drawings
1.3
34 Installation Drawings
1.3
Section
23 05 00
SD-03 Product Data
1.3
35 Air/Dirt Separator 1.3
36 Pumps 1.3
Pipe and Fittings 1.3
37 Piping Specialties 1.3
38 Pipe insulation system
1.4
39 Valves 1.3
40 Misc. Materials 1.3
41 Supporting Elements
1.3
42 Protective Coasting
1.3
Section
23 05 00
SD-05
Design Data
1.3
43 Air / Dirt Separator 1.3
44 Pumps 1.3
45 Pipe and Fittings 1.3
46 Piping Specialties 1.3
47 Valves 1.3
Section
23 05 00
SD-06 Test Reports
1.3
48 Hydrostatic Tests 1.3
49 Air Tests 1.3
50 Valve-Operating Tests
1.3
51 Drainage Tests 1.3
52 Pneumatic Tests 1.3
53 System Operation Tests
1.3
Section
23 05 00
SD-08
Manufacturer’s Instructions
1.3
54 Installation Instructions
1.3
Section
23 05 00
SD-10 Operation and Maintenance Data
1.3
55 Operations and Maintenance Manuals
1.3
Section
23 09 33
SD-01
Preconstruction Submittals
1.5
56 Materials, Equipment and Fixtures Lists
1.5
Section
23 09 33
SD-02 Shop Drawings
1.5
57 Installation Drawings
1.5
Section
23 09 33
SD-03 Product Data
1.5
58 Controllers 1.5
59 Thermometers 1.5
60 Pressure Gages 1.5
61 Valves 1.5
62 Dampers 1.5
63 Operators 1.5
Section
23 09 33
SD-06 Test Reports
1.5
64 Testing, Calibration and Acceptance Report
1.5
Section
23 09 33
1.5
65 Certificates 1.5
Section
23 09 33
SD-08
Manufacturers instructions
1.5
66 Manufacturer’s Instructions
1.5
Section
23 09 33
SD-10 Operation and Maintenance Data
1.5
67 Electric Operators 1.5
68 Motor Operated Damper
1.5
Section
23 52 00
SD-03 Product Data
1.2
69 CIS Boilers 1.2
70 Breaching & Chimney
1.2
71 Gas-Burning Equipment
1.2
72 Combustion Safety Controls
73 Combustion Controls
1.2
74 Boiler Trim and Accessories
1.2
Section
23 52 00
SD-06 Test Reports
1.2
75 Field Tests 1.2
Section
23 52 00
SD-07 Certificates 1.2
76 Certificates 1.2
Section
23 52 00
SD-08
Manufacturer’s Instructions
1.2
77 Manufacturer’s Instructions
1.2
Section
23 52 00
SD-10 Operations and Maintenance Data
1.2
78 Operations and Maintenance Manuals
1.2
Section
26 00 00
SD-02 Shop Drawings
1.4
79 Shop Drawings 1.4
Section
26 05 19
SD-03 Product Data
1.2
80 Installation Instructions
Section
26 20 00
SD-02 Shop Drawings
1.3
81 Panelboards 1.3
82 Busways 1.3
83 Cable Trays 1.3
84 Motor Control Centers
1.3
85 Wiring Diagrams 1.3
86 Wireways 1.3
Section
26 20 00
SD-03 Product Data
1.3
87 Receptacles 1.3
88 Circuit Breakers 1.3
89 Switches 1.3
90 Motor Controllers 1.3
Section
26 20 00
SD-06 Test Reports
1.3
91 600 Volt wiring Test
1.3
92 Grounding System Tests
1.3
93 Ground Fault Receptacle Tests
1.3
Section
26 20 00
94 Fuses 1.3
Section
26 20 00
SD-10 Operation and Maintenance Data
1.3
95 Operations and Maintenance Manuals
SECTION 01 35 29 Page 1
SECTION 01 35 29
SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
11/07
1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Use the most recent version unless otherwise noted.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A10.32 Personal Fall Protection - Safety
Requirements for Construction and Demolition Operations
ANSI A10.34 Protection of the Public on or Adjacent to
Construction Sites
ANSI Z359.1 Safety Requirements for Personal Fall Arrest
Systems, Subsystems and Components
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B30.22 Articulating Boom Cranes
ASME B30.3 Construction Tower Cranes
ASME B30.5 Mobile and Locomotive Cranes
ASME B30.8 Floating Cranes and Floating Derricks
CODE OF FEDERAL REGULATIONS (CFR)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1919 Gear Certification
29 CFR 1926 Safety and Health Regulations for
Construction
29 CFR 1926.500 Fall Protection
CORPS OF ENGINEERS (COE)
EM 385-1-1 Safety -- Safety and Health Requirements
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 Standard for Portable Fire Extinguishers
SECTION 01 35 29 Page 2
NFPA 241 Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B Fire Prevention During Welding, Cutting, and
Other Hot Work
NFPA 70 National Electrical Code
NFPA 70E Electrical Safety in the Workplace
1.2 SUBMITTALS
Accident Prevention Plan (APP)
Activity Hazard Analysis (AHA)
Submit one copy of each permit attached to each Daily Production Report.
Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."
Crane Reports
Crane Critical Lift Plan
Certificate of Compliance
1.3 QUALITY ASSURANCE
1.3.1 Meetings
The Safety Officer shall attend the pre-construction conference.
1.3.1.1 Weekly Safety Meetings
Hold weekly at the project site. Attach minutes showing contract title, signatures of attendees and a list of topics discussed to the QC Contractor Quality Control daily report.
1.3.1.2 Work Phase Meetings
The appropriate AHA shall be reviewed and attendance documented by the Contractor at the preparatory, initial, and follow-up phases of quality control inspection.
SECTION 01 35 29 Page 3
1.3.1.3 New Employee Indoctrination
New employees will be informed of specific site hazards before they begin work. Documentation of this orientation shall be kept on file at the project site.
1.3.2 Certifications
1.3.2.1 Accident Prevention Plan (APP)
Submit the APP at least 15 calendar days prior to start of work at the job site, following Appendix A of EM-385-1-1. Make the APP site specific.
Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHA as amendments to the APP. In accordance with contract quality control requirements each AHA will be reviewed during an on-site preparatory inspection.
1.4 ACCIDENT PREVENTION PLAN (APP)
Prepare the APP in accordance with EM-385-1-1 Table 1-1. Include the associated AHA and other specific plans, programs and procedures detailed in Paragraphs 01.A.09 and 01.A.10 of EM-385-1-1, some of which are listed below.
1.4.1 Contents of the Accident Prevention Plan
a. Name and safety related qualifications of safety officer (including training and any certifications).
b. Qualifications of competent and of qualified persons.
c. Identity of the individual who will complete exposure data (hours worked); accident investigations, reports and logs; and immediate notification of accidents to include subcontractors.
d. Emergency response plan. Conform to EM-385-1-1, paragraph 01.E and include a map denoting the route to the nearest emergency care facility with emergency phone numbers. Contractor may be required to demonstrate emergency response.
e. Confined Space Entry Plan. Identify the qualified person's name and qualifications, training, and experience. Delineate the qualified person's authority to direct work stoppage in the event of hazardous conditions. Include procedure for rescue by contractor personnel and the coordination with emergency responders. (If there is no confined space work, include a statement that no confined space work exists and none will be created.)
f. Hazardous Material Use. Provisions to deal with hazardous materials, pursuant to the Contract Clause "FAR 52.223-3, Hazardous Material Identification and Material Safety Data." and the following:
(1) Inventory of hazardous materials to be introduced to the site with estimated quantities.
SECTION 01 35 29 Page 4
(2) Plan for protecting personnel and property during the transport, storage and use of the materials.
(3) Emergency procedures for spill response and disposal, including a site map with approximate quantities on site at any given time. The site map will be attached to the inventory, showing where the hazardous substances are stored.
(4) Material Safety Data Sheets for inventoried materials not required in other section of this specification.
(5) Labeling system to identify contents on all containers on-site.
(6) Plan for communicating high health hazards to employees and adjacent occupants.
g. Hazardous Energy Control Plan. For hazardous energy sources, comply with EM-385-1-1, paragraph 12.A.07.
h. Critical Lift Plan. Weight handling critical lift plans shall be prepared and signed in accordance with EM-385-1-1, paragraph 16.c.18.
i. Fall Protection and Prevention (FP&P) Plan. The plan shall be site specific and address all fall hazards in the work place. It shall address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A qualified person shall prepare the plan. The plan shall include fall protection and prevention systems, equipment and methods employed, responsibilities, rescue and escape equipment and operations, training requirements, and monitoring methods. FP&P Plan shall be revised once every six months for lengthy projects, to reflect any new changes during the course of construction, due to changes of personnel, equipment, systems or work habits.
j. Silica Exposure Reduction. The plan shall include specific procedures to prevent employee silica inhalation exposures.
k. Training Records and Requirements. List of mandatory training and certifications which are applicable to this project (e.g. explosive actuated tools, confined space entry, fall protection, crane operation, vehicle operator, forklift operators, personal protective equipment); list of requirements for periodic retraining/certification; outline requirements for supervisory and employee safety meetings.
l. Severe Weather Plan. Procedures of ceasing on-site operations during lightning or upon reaching maximum allowed wind velocities.
m. Emergency Lighting and Power Systems Plan (e.g. periodic testing of batteries for emergency lighting.)
SECTION 01 35 29 Page 5
1.5 ACTIVITY HAZARD ANALYSIS (AHA)
Prepare for each phase of the work. As a minimum, define activity being performed, sequence of work, specific hazards anticipated, control measures to eliminate or reduce each hazard to acceptable levels, training requirements for all involved, and the competent person in charge of that phase of work. For work with fall hazards, including fall hazards associated with scaffold erection and removal, identify the appropriate fall arrest systems. For work with materials handling equipment, address safeguarding measures related to materials handling equipment. For work requiring excavations, include excavation safeguarding requirements. The appropriate AHA shall be reviewed and attendance documented by the Contractor at the preparatory, initial, and follow-up phases of quality control inspection.
2 PRODUCTS
Not Used.
3 EXECUTION
3.1 CONSTRUCTION
Comply with EM-385-1-1, NFPA 241, the accident prevention plan, the activity hazard analysis and other related submittals and activity fire and safety regulations.
3.1.1 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited.
Exceptions to the use of any of the above excluded materials may be considered by Contracting Officer upon written request by Contractor.
3.1.2 Unforeseen Hazardous Material
The design should have identified materials such as PCB, lead paint, and friable and nonfriable asbestos. If additional material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."
3.2 PERSONNEL PROTECTION
3.2.1 Hazardous Noise
Provide hazardous noise signs, and hearing protection, wherever equipment and work procedures produce sound-pressure levels greater than 85 dBA steady state or 140 dBA impulse, regardless of the duration of the exposure.
SECTION 01 35 29 Page 6
3.2.2 Fall Protection
Enforce use of the fall protection device designated for each specific work activity in the FP&P plan and/or AHA all times when an employee is on a surface 6 feet or more above lower levels. Personal fall arrest systems are required when working from an articulating or extendible boom, scissor lifts, swing stages, or suspended platform. Fall protection must comply with ANSI A10.32.
3.2.2.1 Fall Protection for Roofing Work
Fall protection controls shall be implemented based on the type of roof…