SOLICITATION AMENDMENT 0003 (3 PAGES) IFB 700Z0G118BPFA01200 REPAIR MAIN ENTRANCE AT CHAPEL USCG ACADEMY NEW LONDON, CT PROJECT #6973018
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
3. DATE
12 JAN 2018
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer USCG Civil Engineering Unit 475 Kilvert St. Suite 100 Warwick, RI 02886
Same as block #6
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
THIS AMENDMENT MUST BE
ACKNOWLEDGED WITH YOUR BID
9A. AMENDMENT OF SOLICITATION NO.
70Z0G118BPFA01200
9B. DATED (SEE ITEM 11)
12/19/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
THE BID OPENING DATE IS HEREBY EXTENDED UNTIL 23 JANUARY 2018 AT 2:00 P.M.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. The solicitation referenced in Block #9A is hereby amended as follows:
a. A clarification regarding the existing granite top stair tread is provided at the top of page 2.
b. Questions and Answers are provided on pages 2 and 3 in response to pre-bid inquiries received to date from interested vendors.
c. Department of Labor General Decision Number CT180024 Modification Number 0 dated 01/05/2018 is hereby incorporated into the subject solicitation as attached and supersedes General Decision Number CT20170024 previously incorporated.
d. All other terms and conditions remain unchanged.
2. The bid opening date is hereby extended until 23 January 2018 at 2:00 p.m. EST as a result of this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full 15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TERESA LAMPHERE
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
1/12/2018
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83)
AMENDMENT 0003
SOLICITATION 70Z0G118BPFA01200
12 JANUARY 2018
CLARIFICATION REGARDING THE EXISTING GRANITE TOP STAIR TREAD:
The existing granite top stair tread extends under the existing brick end walls by 6” to 12” and appears to extend completely under the two brick columns. Per the existing building drawings, the existing top tread is set in mortar on a continuous concrete foundation wall/slab. The existing top tread appears to be sound, in good condition, well supported, and showing no signs of movement. Based on current observations and for bidding purposes, the existing top stair tread shall remain in place and become part of the re-installed stair. Additional inspection of this stair tread and its setting material shall be completed after the adjacent floor stones and the other stair treads are removed (as noted on drawings) to determine if any repair of its setting mortar is required. Any additional work required based on the additional inspection will be addressed by modification to the contract at that time.
PRE-BID INQUIRIES AND RESPONSES:
Question #1: We were unable to attend the site visit last week. Can we reach out to Garrett Starasinic to set up an appointment to visit the site?
Answer #1: A site visit can be coordinated by contacting the COR, LT Cory Fagan, at (860)444-8226 or @ cory.p.fagan@uscg.mil.
Question #2: Do you have any idea of the type of marble and granite available that closely matches existing?
Answer #2: Existing types/sources are unknown.
Question #3: Please confirm that the intent is to have the metal railings shop-finished w/ touchup onsite after installation.
Answer #3: Confirmed. Perform shop painting and field touch-ups per paragraph 3.1.H of Section 057300 and Section 099100.
Question #4: Please provide a total quantity of light fixtures to be replaced per stair section 1/A-500.
Answer #4: A single fixture is located at both cheek walls as shown in the cited detail (total of 2 for the project).
Question #5: Is any lighting required for the new handicap ramp?
Answer #5: No ramp lighting is included in the scope of work for this project.
Question #6: Drawing C-300 notes that a Dogwood tree is to be transplanted. How are we expected to transplant a tree to an area that has maybe 12" of topsoil before we hit rock and guarantee the tree will survive?
Answer #6: Planting locations within the work site shall be coordinated with the COR per Addendum #1.
AMENDMENT 0003
SOLICITATION 70Z0G118BPFA01200
12 JANUARY 2018
Question #7: SKC-1 changes the layout of the handicap ramp. Can you please revise the site layout, landscape and grading drawings as they are affected by this change.
Answer #7: No additional drawings are forthcoming. Affected elements shall be adjusted as required to accommodate revisions shown on Addendum Sketch SKC-1.
Question #8: SKC-1 shows a natural stone path with reused stone instead of the concrete walk depicted on the site drawings. Where are these salvaged stones coming from? And can you provide a detail for this stone path.
Answer #8: Salvage stones from existing stone walk; location shown on drawing C-101. Provide new 6” processed aggregate base for relocated stone walk; location shown on sketch SKC-1.
Question #9: Is there any line striping or signage required at the newly created handicap drop off/pickup zone?
Answer #9: No striping or signage is included in the scope of work for this project.
Question #10: Can you please provide a detailed section through the stairs showing how the granite is to be reinstalled. Are the stones pinned? If so, then how? Do they sit on top of each other with a 1” overlap, or are they shimmed off each other with a gap for backer rod and sealant?
Answer #10: The existing granite steps are set in mortar on concrete foundation walls (no pins). Foundation walls perpendicular to stair run are 12” wide about 5’-5” on center and stepped to support stair treads. End of treads have 4” bearing on foundation walls. Remove, salvage, clean, and re-set existing granite stair treads per drawing A-100. Bottom tread shall be set in mortar on continuous foundation wall, typical treads shall be set in mortar on foundation walls and with treads leading edge having 2” bearing on tread below, treads slope 1/8” per foot toward leading edge for drainage; see typical stair section 1/A-500. End joints between treads shall have mortar, backer rod, and sealant per detail 5/A-500.