70Z08819BPQQ06600-Amendment_0001.pdf
PDF 68 KB Posted
- Solicitation number
- 70Z08819BPQQ06600
About this file
amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_abstract.pdf | ||
| 70Z08819BPQQ06600-Amendment_0002.pdf | ||
| site_walk_sign_in_roster.pdf | ||
| A8.pdf | ||
| A4.pdf | ||
| Invitation_For_Bid_-.pdf | ||
| A6.pdf | ||
| A1.pdf | ||
| A9.pdf | ||
| A10.pdf | ||
| A12.pdf | ||
| CONTRACTORS_REQUEST_FOR_CLARIFICATION.pdf | ||
| E1.pdf | ||
| A7.pdf | ||
| A2.pdf | ||
| A5.pdf | ||
| T1.pdf | ||
| A3.pdf | ||
| A11.pdf | ||
| WAGE_DETERMINATION_-70Z08819BPQQ06600.pdf | ||
| E2.pdf | ||
| Contractor_Responsibility_Questionair_-_New.pdf | ||
| Cert_of_Authotization_to_Bind_Corp.pdf | ||
| 11744975_SOW.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 04/25/2019 21-19-889PQQ066 11744975
6. ISSUED BY CODE 51290 7. ADMINISTERED BY (If other than Item 6)
CODE
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N
Oakland, CA 94612-5203
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N
Oakland, CA 94612-5203
8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.
ISC BioExpress
X 70Z08819BPQQ06600
9B. DATED (SEE ITEM 11)
To All Prospective Offerors s
Kaysville, UT. 84037
04/09/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
70Z08819BPQQ06600 - HURRICANE GORDON M &R AT STATION PENSACOLA FLORIDA.
The purpose of Amendment 0001 is to respond to RFIs and provide the site walk sign in sheet.
Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TRAVIS COHEN
Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY ___________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE COMPUTER GENERATED Prescribed by GS
A. Requests for Information
Question 1. After roof demolition, will damaged spray foam insulation require replacement? Recommend adding a UPLI for this one.
Answer 1. New UPLIs will be included in the revised pricing schedule. Amendment 0002 forthcoming.
Question 2. Will the tv dish mounted on the roof require temporary relocation during construction? Perhaps mounted on a temporary stand. If so, who is the provider? Will the contractor be required to coordinate with the provider to relocate or will the Coast Guard do this?
Answer 2. Per sheet A3 Note 4 Contractor to coordinate any disturbance of antenna with COR. Coast Guard personnel is responsible for coordinating with provider.
Question 3. How many layers of roof are installed on the main bldg.?
Answer 3: Unknown. Per A3 Note 1, Contractor to verify existing conditions prior to bidding.
Question 4. Is Longshoreman's Insurance required for work on the dock and boat house?
Answer 4: Not Required.
Question 5. Just electrical work on the dock?
Answer 5. Yes, see scope of electrical work for both small boat and cutter pier. Per Section 02 41 19 para D, provide wash down of piers prior to repairs.
Question 6. Some light fixtures show signs of rust possibly caused by water leak. Will they be replaced?
Answer 6. Light fixtures will Not be replaced.
Question 7. Are door the doors on the gym and storage bldgs. included in the base bid or option item?
Answer 7. Per 01 10 00 para F, all replacement doors to be included as the Option CLIN.
Question 8. Cut-out windows on passageway between gym and storage bldgs. for future window AC installation. Include power outlets. Recommend adding as an option.
Answer 8. Per A6 detail 4, provide block out for AC unit in gym building part of base bid. Storage building does not get AC.
Question 9. The Unit requests A/C cuts outs on the walls between the storage and Gym buildings. Was this added to the SOW? If not can we add?
Answer 9. Per A6 detail 4, provide block out for AC unit in gym building part of base bid. Storage building does not get AC cutouts.
END.
File details come from the government source that posted it.