A0003_-_RFI_Responses.pdf

PDF 185 KB Posted

Attached to
Maintenance & Repair in Station Houston and Air Station Houston located in Houston, Texas
Solicitation number
70Z08818BP0400100
Issued by

About this file

A0003 - RFI Response

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

0003 25October2018

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE OFFERORS

X 70Z08818BP0400100

9B. DATE (SEE ITEM 11)

30 October 2018

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide responses to the following RFIs: (see next page)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

GUILJOHN ALCANTARA

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

IFB 70Z08818BP0400100

Maintenance & Repair Station Houston/ Air Station Houston

RFI Response Amendment A0003

1. Refer to sheet A1 Plan Keynote #6 of AS Houston Fitness Center. Please provide specifications for the new ductwork at Fitness Center 001. HVAC as‐builts of this area were not provided.

R: See specification section 2.10A to 2.10F of 23 00 00 for ductwork requirements. See reference‐drawing M104 of 3101726 for fitness center HVAC floor plan.

2. Refer to sheet A1.3. Please advise if the Construction Phasing Plan will require Contractor preparation of swing spaces for Government staff during_each phase of construction.

R: : No. Government staff will prepare swing spaces during each phase of construction.

3. Refer to sheet A1.3 and_A1.2. The Construction Phase Plan (A1.3) shows work at rooms 187, 188 during phase 1 that are not included in the bordered area line shown in sheet A1.2. The same happens for phase 3 in room 171 and 173. Please clarify.

R: Rm 173 is not in Scope of Work. Refer to A6 and A7 for Scope of work in rooms 171,172, 187,

188. Phasing to remain as shown.

Additionally: A6‐FINISH DEMOLITION SCHEDULE NOTES R11 TO READ:

ACT TO BE REMOVED FROM WALL FACING HANGAR BAY TO 10’‐0” INSIDE EXISTING ROOM.

METAL GRID SUSPENSION SYSTEM TO REMAIN.

4. Refer to sheet A1, Plan_Keynote #11. Note is not illustrated in drawing. Please advise.

R: Keynote 11 refers to ceiling in FITNESS CENTER. See Finish Schedule for additional new ceiling locations in other rooms in scope of work area.

SF30
A0003 - RFI Responses