Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

William Tate Questions 70Z085-18-Q-P45A1200

Question No.

CUTTER & HULL Number: USCGC WILLIAM TATE

RFQ Number: 70Z085-18-Q-P45A1200

SOLICITATION SECTION: SPECIFICATION PARA NO.

DEFINITE/OPTIONAL ITEM NO. 000 PARA NO. (3)(i)

TITLE:

Solicitation

QUESTION: 1

Paragraph (3)(i), Travel and Per Diem Costs, identifies that the CORs official duty station is Portsmouth, PA.

Please identify the location of the CORs official duty station.

Answer : The COR is CWO2 Holt (Portsmouth, Virginia) (757) 450-3102

RFQ Number: 70Z08518QP45A12200

SOLICITATION SECTION: PARA NO.

DEFINITE/OPTIONAL ITEM NO. 21 PARA NO.

3.1.5

Sea Strainers – Duplex (All Sizes), Overhaul

QUESTION:

Paragraph 3.1.5 directs us to fabricate and install a cofferdam. Since this is a dry-docking availability, is this requirement necessary?

Answer: Cofferdams are needed to prevent flooding only while the vessel is waterborne. Cofferdams are not necessary while the vessel is dry-docked.

3.1.5 Would be required in the event of a waterborne repair.

DEFINITE/OPTIONAL ITEM NO. 25 PARA NO. 3.2

TITLE:

Gripes, Binders and Jacks (Loose Rigging Gear), Inspect and Test

Paragraph 3.2 appears to be incomplete. Please clarify.

Answer: Corrected in REV-2

SOLICITATION SECTION: Schedule of Services PARA NO.

DEFINITE/OPTIONAL ITEM NO. PARA NO.

TITLE: various

The schedule of services lists both Item 53 (Chain Locker, Preserve 100%) and 54 (Chain Lockers, Preserve – Partial) as definite items. Shouldn’t these be listed as option items?

The same question applies to Items 55 and 56.

Answer: WORK ITEMs 53 & 54 should be Optional WIs… Corrected in REV-2

Question No. 005 Chain locker preserve 100% should be Optional WI. Corrected in REV-2

RFQ Number: 70Z08518QP45A1200

DEFINITE/OPTIONAL ITEM NO. PARA NO.

Attachment 1_Schedule of Supplies and Services

The Section B provided by the government lists the following items as “Definite” which directs the contractor to complete them without any further direction from the government; Item 53, 54, 55 and 56. It makes no sense to Preserve the Chain Lockers or Dirty Oil and Waste Tanks both Partially and at 100%.

Will the government change the Schedule of Supplies and Services to make these items all “OPTIONS”?

Answer: Work Items Item 53, 54, 55 and 56 were mislabeled as Definite, Corrected in REV-2

Question No. 006

DEFINITE/OPTIONAL ITEM NO. 1 PARA NO. 3.3.2

Hull Plating (side Scan), Ultrasonic Testing

Paragraph 3.3.2 directs the contractor to accomplish all required tasks within 10 calendar days of the start of the availability”. Paragraph 3.2 directs the contractor to abrasive blast and prime the u/w body of the vessel within 10 days of lifting the vessel. Paragraph 3.3.2 is not obtainable and should be deleted from the work item.

ANSWER: The work identified in 3.3.2 and 3.2 must be completed by the end of the 10th calendar day from when the contract begins. The 10th calendar day is the deadline regardless. 3.3.2 Must be completed “WITHIN” that same time period as well. The CTR must submit a CFR requesting approval for additional time if unforeseen circumstances arise that create a delay.

Question No. 007

DEFINITE/OPTIONAL ITEM NO. 15 PARA NO. Table 1

Voids (Non-Accessible), Internal Surfaces, preserve

Table 1 is not complete. Please provide the correct information to complete Table 1.

Answer: Corrected in REV-2

Question No. 008

DEFINITE/OPTIONAL ITEM NO. 16 PARA NO. 3.2

Tanks (Ballast), Clean and Inspect

Paragraph 3.2 does not identify the amount of fluids the contractor should plan on removing. Will the vessel be arriving at the contractor’s yard with more fluids that are normally present at low suction?

ANSWER: The Ballast tanks should be empty (low suction) prior to dry-docking; any additional fluids found within the tank will be a Change Order.

Question No. 009

DEFINITE/OPTIONAL ITEM NO. 25 PARA NO. 3.2

Gripes, Binders and Jacks (Loose Rigging Gear), Inspect and Test

Paragraph 3.2 is not a complete paragraph. The sentence, “The Contractor shall perform the work described in the” does not have an ending. Please provide the complete work item.

ANSWER:

The Contractor shall perform the work described in in Table 1, in accordance with SFLC Std Spec 5000, SFLC Std Spec 7400, SFLC Std Spec 6310 and using Coast Guard Drawing 175 WLM 581-001 as guidance

Corrected in REV-2

Question No. 010

DEFINITE/OPTIONAL ITEM NO. 30 PARA NO. 3.2

Tanks (Ballast), Preserve, Partial

Paragraph 3.2 directs the contractor to “Power tool clean all affected surfaces to “bare metal”, in lieu of abrasive blasting”. Since Ballast Tank Preservation 100% is Work Item 29, how much of the ballast tanks interior surfaces is the contractor to mechanically clean to bare metal? The industry standard is normally up to 20%. If more than 20% of the tank interior surfaces require to be taken to bare metal, abrasive blasting of the tank at 100% is normally warranted.

ANSWER:

Work items 29 & 30 are Optional WIs (Corrected in REV-2), based on CFR associated with Clean & Inspect. Partial will use pwr tool method to clean effected surfaces to bare metal and feather out to coating that is well adhering and coat IAW WI-30 and SFLC std spec 6310.

If WI 29 is activated then KTR shall prepare and coat all tank interior surfaces (including internal surfaces of manhole cover(s), manhole cover hull ring(s) extending outward to the weld line that ties the hull ring into the tank plating on the tank exterior) using the system specified for " Tanks and Voids, Ballast Tanks; Option I or II " in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select finish/top coat color to match existing.

Question No. 011

DEFINITE/OPTIONAL ITEM NO. 30 PARA NO. 3.2

Tanks (Ballast), Preserve, Partial

Paragraph 3.2 directs the contractor to “Power tool clean all affected surfaces to “bare metal”, in lieu of abrasive blasting”. Since Ballast Tank Preservation 100% is Work Item 29, how much of the ballast tanks interior surfaces is the contractor to mechanically clean to bare metal? The industry standard is normally up to 20%. If more than 20% of the tank interior surfaces require to be taken to bare metal, abrasive blasting of the tank at 100% is normally warranted.

Answer:

Work items 29 & 30 are Optional WIs (Corrected in REV-2), based on CFR associated with Clean & Inspect. Partial will use pwr tool method to clean effected surfaces to bare metal and feather out to coating that is well adhering and coat IAW WI-30 and SFLC std spec 6310.

If WI 29 is activated then KTR shall prepare and coat all tank interior surfaces (including internal surfaces of manhole cover(s), manhole cover hull ring(s) extending outward to the weld line that ties the hull ring into the tank plating on the tank exterior) using the system specified for " Tanks and Voids, Ballast Tanks; Option I or II " in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select finish/top coat color to match existing.

Question No. 012

DEFINITE/OPTIONAL ITEM NO. 52 PARA NO. 3.4.1 and

3.4.2

Grey Water Holding Tank(s), Inspect

Paragraph 3.4.1 and 3.4.2 incorrectly reference Work Item 38 as “Galley Sink Drain, Modify”. The correct Work Item number is 37. Please make this correction.

ANSWER:

Previous REV deleted work item from the spec creating the numbering discrepancy. (Corrected in REV-2)

Question No. 013

DEFINITE/OPTIONAL ITEM NO. 60 PARA NO. 3.2

Exhaust Stack Plating, Renew

Paragraph 3.2 identified the location of work as the “top of the exhaust stack (03-70-Q). The work item does not identify the amount of plating to be replaced or the area of the stack. Please provide the amount of plate that the contractor is to price for this item.

ANSWER:

WIs 005 thru 010 covers “structural steel plating renewal”. KTR can activate the number of (4 square ft) units via CFR to be activated as needed. (The location of wastage is at the top horizontal plaiting at back side below the drain where water tends to lay (approximately 8 to 10 square ft.)

Question No. 014

SOLICITATION SECTION: Page 1 PARA NO.

DEFINITE/OPTIONAL ITEM NO. PARA NO.

The solicitation indicates that the due date for receipt of contractor’s quotations is April 23, 2018 at 10AM PDT. This contractor has not yet received the references for this solicitation, making it difficult to send request for quotes to subcontractors. The contractor requests an extension to the bid due date until May 7, 2018.

Answer: Solicitation response date has been extended to April 30, 2018

DEFINITE/OPTIONAL ITEM

NO.

55 PARA NO. 3.3

TITLE: Tanks (Dirty Oil and Waste), Preserve 100%

Paragraph 3.3 directs us to remove and dispose of 100 gallons of waste oil and oily water.

This work is already being accomplished in paragraph 3.2 of WI 49, Tanks (Dirty Oil and Waster), Clean and Inspect. Please clarify.

ANSWER:

WI-055 is an option item Paragraph 3.3 should be to remove and dispose waste oil and oily water up to 100 gallons. This won’t be necessary in this WI (if activated) since it was already accomplished in WI-49.

Question no 16.

RFQ Number: 70Z08518QP45A12200

SOLICITATION SECTION: PARA NO.

DEFINITE/OPTIONAL ITEM

NO.

51 PARA NO. 1.2

TITLE: Thruster Unit (General), Inspect

The GFM listed in paragraph 1.2 of WI 51 is also being furnished and replaced in WI 50.

Both items are listed as definite. Should one of them be an option item?

ANSWER: Work item 50 is an Optional WI; based on results of WI-51.

DEFINITE/OPTIONAL ITEM

NO.

55 PARA NO. 3.3

TITLE: Tanks (Dirty Oil and Waste), Preserve Partial

Paragraph 3.3 directs us to remove and dispose of 100 gallons of waste oil and oily water.

This work is already being accomplished in paragraph 3.2 of WI 49, Tanks (Dirty Oil and Waster), Clean and Inspect. Please clarify.

ANSWER: Should be up to 100 gals of waste water if standalone (Won’t be necessary since it is being accomplished in WI WI-49

DEFINITE/OPTIONAL ITEM

NO.

61 PARA NO. 3.2

TITLE: Temporary Services, Provide - Cutter

Table 1, sub-paragraph 3.3.4 in paragraph 3.2 of WI 61 directs us to provide duty section berthing, but does not indicate how many males and how many females we need to provide berthing for. Please provide this information.

ANSWER: -

Work Item 61 (TABLE) 3.3.3 states "Duty section berthing: 1 male, 1 female. Duty section berthing shall be provided for during disruption of berthing."

WILLIAM TATE has a 2 person duty section so the KTR will need to provide 2ea single berthing rooms. It doesn't matter if male or female occupies them as long as they are separate rooms.

SF 30 70Z085-18-Q-P45A1200-A0001 WILLIAM TATE
Attachment 4 Responses 6 April
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]: 70Z085
Code[1]:
AccountingData[0]:
A13[0]: FAR 52.212-4(c) Changes
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Natalie J. Rodriguez
Description[0]: FY2018 WILLIAM TATE DRY DOCK

This Amendment updates attachment 1-Schedule of Supplies and Services and Attachment 2-The work specification to REV-2 dated 29/MAR/2018. It also provides responses to the request for clarification form and extends the response time to April 30, 2018, 10:00 AM PDT All other terms and conditions remain unchanged.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: USCG SURFACE FORCES LOGISTICS CENTER

1301 CLAY STREET, SUITE 800N

OAKLAND, CA 94612

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 70Z085-18-Q-P45A013
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 04/06/2018
Dated9B[0]: 23MAR2018
Dated10B[0]:
CheckBox9[0]: Off
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: 1
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]: 06APR2018