Attachment 6 - Government Property Report.pdf
PDF 132 KB Posted
- Solicitation number
- 70Z08527QLREP0001
- Issued by
- Not on record
About this file
This is a Government Property Report form used for tracking and accounting government property provided to contractors during contract performance on Coast Guard vessels. The contractor must complete the report throughout the contract period with assistance from the Government Property Administrator and submit it with the final invoice.
The report requires contractors to document all government property received by recording the property type with name, description, National Stock Number (NSN), and serial number; the property value; the date received; the date installed or consumed; the current location of property in the contractor's possession or disposition instructions for unused, serviceable, salvage, or scrap property; and the date disposition was carried out. The form defines serviceable property as pre-existing property that was replaced during performance and will be returned to the Coast Guard for future use; salvage as property with no serviceable value but some value exceeding scrap value; and scrap as property with value only for its basic material content. The Government Property Administrator signs to certify disposition instructions have been given, and the contractor signs after executing those instructions, certifying that all property has been accounted for through consumption or proper disposition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 8 Change Request Proposal Form.xlsx | XLSX spreadsheet | |
| Attachment 4 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 3 Consolidated List of References.docx | DOCX document | |
| Attachment 2-WAESCHE DS FQ2 FY27 Specification REV-0.docx | DOCX document | |
| Solicitation-WAESCHE-Q2-FY27-70Z08527QLREP0001.docx | DOCX document | |
| Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA).pdf | ||
| Attachment 5 Questions.docx | DOCX document | |
| Attachment 1-Pricing Scheduel DS FQ2 FY27.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 6
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
CONTRACT NUMBER: VESSEL:
CONTRACTOR POINT OF CONTACT:
TELEPHONE NUMBER:
CONTRACTOR’S ADDRESS:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
1 2 3 4 5 6
TYPE OF PROPERTY RECEIVED
(INCLUDE NAME, DESCRIPTION ,
NSN AND SERIAL #)
VALUE OF
PROPERTY
DATE
RECEIVED
DATE
INSTALLED/
CONSUMED
USE THIS BLOCK TO
RECORD :
1. CURRENT LOCATION
OF PROPERTY IN THE
POSSESSION OF THE
CONTRACTOR FOR USE
DURING THE
AVAILABILITY OR
OTHERWISE BEING
TEMPORARILY HELD
UNTIL BEING RETURNED
TO/REINSTALLED ON
CUTTER.
2. DISPOSITION
INSTRUCTIONSFOR
UNUSED, SERVICEABLE,
SALVAGE OR SCRAP
PROPERTY. STATE
WHICH APPLY.
DATE
DISPOSITION
CARRIED OUT
DESCRIPTION
NSN\SERIAL\P/N
* Definitions (all property defined below will require disposition instructions):
Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.
Scrap – defined as property having no value except for it basic material content.
The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
PROPERTY ADMINISTRATOR DATE
(Sign at time disposition instructions are given)
CONTRACTOR SIGNATURE DATE
(sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)
| Type of property received (include name, description , nsn and serial #) |
| date |
| nsn\serial\p/n |
| description |
File details come from the government source that posted it. Updated .