This is a Request for Information (RFI) issued by the United States Coast Guard for market research purposes regarding a salinity monitoring system upgrade for the USCGC HEALY (WAGB-20), a 420-foot icebreaker homeported in Seattle, Washington. The USCG seeks contractor capability information for procuring and installing two Burkert 8619 Multicell Controllers, two Burkert 8220 Conductivity Sensors, and two Burkert S020 Insertion Fitting Adapters to replace obsolete McNab MC-81 salinity cells in Auxiliary Machinery Room #1. The work requires removal and disposal of old equipment, fabrication and welding of custom mounting hardware, electrical work including cable replacement and repair, and full system integration with the ship's existing Machinery Plant Control and Monitoring System (MPCMS). Interested parties must respond by 4:00 PM Eastern Daylight Time on March 20, 2026, via email to CWO2 Corry Thomas (primary) or Stephen Krumfolz (alternate) with responses limited to 2 pages addressing capability and approach, procurement confirmation with lead time estimates, and Rough Order of Magnitude (ROM) costs broken down by labor, materials, and travel expenses.
The RFI requires responses submitted as searchable PDFs in a specified format with a 1–2 page ROM estimate in Excel format only, including assumptions and limitations. The Government will not reimburse response costs, and submission of proprietary information is not requested; however, any voluntarily submitted proprietary content must be clearly marked and provided separately as an appendix. Marketing brochures, phone/voicemail submissions, and late responses will not be accepted. This RFI does not constitute a promise to issue a future RFP, and non-response does not preclude participation in any subsequent solicitation. The work must comply with multiple Coast Guard standards including SFLC Standard Specifications 0000, 0740, and 3042, along with applicable MIL-STD requirements and Coast Guard technical drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Current Salinity Monitor.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
REQUEST FOR INFORMATION (RFI)
USCGC HEALY (WAGB-20): Salinity Monitoring System Upgrade
1.0 DESCRIPTION
This notice is a Request for Information (RFI) only. This RFI is issued by the United States Coast Guard (USCG) for information and planning purposes, pursuant to Federal Acquisition Regulation (FAR) Part 10, Market Research. It does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. All participants are advised that the Government will not pay for any information or administrative costs that result from responding to this RFI; all costs associated with responding to this RFI will be at the interested party’s expense. Not responding to this RFI does not preclude participation in any future RFP, if any is issued.
2.0 PURPOSE
The purpose of this RFI is to seek a contractor capable of procuring and installing a new boiler condensate salinity monitoring system on the CGC HEALY.
Specifically, the USCG requires the contractor to supply and install two Burkert 8619 Multicell Controllers and two Burkert 8220 Conductivity Sensors and associated components. This new system will replace the obsolete and unsupported McNab MC-81 salinity cells and must be adapted to the existing monitoring locations in Auxiliary Machinery Room #1.
3.0 REQUESTED INFORMATION / DELIVERABLES
In response to this RFI, the USCG requests that the following information and deliverables be provided:
1) Interested parties should provide a detailed response that satisfies the requirements outlined in Appendix A.
2) Describe your capability and approach to meeting the specific requirements in Appendix A, including welding, shipboard electrical work, and system integration.
3) Confirm your ability to procure the specified Burkert components and provide an estimated lead time.
4) Rough Order of Magnitude (ROM) cost for the following:
a) Complete scope of work, including all labor cost breakdown.
b) Purchasing of all materials
c) Any travel related costs to complete work.
4.0 RESPONSES
Interested parties should respond to this RFI no later than 4:00 PM, Eastern Daylight Time (EDT), on March 20, 2026. All RFI responses shall address the requested deliverables and information detailed in Section 3.0. Responses shall be submitted electronically via email to:
CWO2 Corry Thomas, SFLC-LREPL SES-2, COR, corry.d.thomas@usg.mil, (primary) Stephen Krumfolz, SFLC-LREPL SES 2, CTR, stephen.d.krumfolz@uscg.mil, (alternate)
2 | P a g e
The subject line must read: “CGC HEALY SALINTY MONITOR RFI RESPONSE - [Company Name] -
RFI #______.
4.1 Response Format:
All responses shall include the following components, submitted as searchable PDFs:
1. Collective responses to items (1), (2), and (3) from Section 3.0 shall be limited to 2 pages.
2. Rough Order of Magnitude (ROM) Estimate (1-2 pages, Excel format only)
a. Includes assumptions and limitations (e.g., inflation year, labor-rates, quantity basis).
b. Note: This ROM is non-binding and for planning purposes only.
4.2 Additional Guidance:
Submission of proprietary information is not requested. If proprietary content is submitted voluntarily:
The information shall be clearly and appropriately marked as proprietary.
The information shall be provided separately from unrestricted materials as an appendix.
All submissions become the property of the USCG and will not be returned.
The following type of responses will not be accepted as part of this RFI:
1) Submitted as marketing brochures or general capability presentations,
2) Submitted via telephone or voicemail,
3) Received after the listed due date.
3 | P a g e
APPENDIX A – Statement of Work
Title: Salinity Monitoring System Upgrade for CGC HEALY (WAGB-20)
The CGC HEALY (WAGB-20) is homeported in Seattle, WA, 98134. The CGC HEALY is 420 feet long, 82 feet wide, drafts 29 feet (at full load), and weighs 16,000 long tons (at full load).
NAICS Code for this requirement: 221310 – Water Treatment and Distribution FSC Code for this requirement: 6630 – Chemical Analysis Instruments
Specification:
1. SCOPE. The Contractor shall procure, deliver, and install a complete salinity monitoring system for the CGC HEALY's Boiler Condensate System. This includes providing two (2) Burkert 8619 Multicell Controllers, two (2) Burkert 8220 Conductivity Sensors, two (2) Burkert S020 Insertion Fitting Adapters, and all necessary electrical components for full integration. The scope of work requires the Contractor to remove and dispose of the old equipment, fabricate and weld any new mounting hardware required for the installation in Auxiliary Machinery Room #1, replace any damaged wiring, and fully integrate the new Burkert system with the ship’s existing systems.
2. APPLICABLE DOCUMENTS. The Contractor shall ensure all design and manufacturing of the system complies fully with the standards referenced herein. The Contractor is responsible for understanding and applying all requirements of these documents.
2.1. Coast Guard Standards:
2.1.1. SFLC Standard Specification 0000, General Requirements (SFLC Std Spec 0000)
2.1.2. SFLC Standard Specification 0740, Welding and Allied Processes (SFLC Std Spec 0740)
2.1.3. SFLC Standard Specification 3042, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation (SFLC Std Spec 3042)
2.2. Coast Guard Drawings:
2.2.1. Coast Guard Drawing 420-WAGB-535-001
2.2.2. Coast Guard Drawing 420-WAGB-531-003
2.3. Coast Guard Technical Publications.
2.4. MIL-STD-1399-300-1 Department of Defense Interface Standard, Section 300, Part 1, Low
Voltage Electric Power, Alternating Current, September 2018
2.5. MIL-STD-461G, Department of Defense Interface Standard, Requirements for the Control of
Electromagnetic Interference Characteristics of Subsystems and Equipment
3. TECHNICAL REQUIREMENTS. The proposed salinity monitoring system shall meet the following technical requirements:
3.1. Bill of Materials: The system shall include, at a minimum:
3.1.1. Two (2) Burkert 8619 Multicell Transmitter/Controllers (Wall Mount variant).
3.1.2. Two (2) Burkert 8220 Conductivity Sensors.
3.1.3. Two (2) Burkert S020 Insertion Fitting Adapters.
4 | P a g e
3.2. Physical Installation:
3.2.1. The Burkert 8619 controllers shall replace the existing McNab MC-81 units in Auxiliary
Machinery Room #1 (Compartment 4-63-0-E) and be mounted using custom-fabricated mounting plates.
3.2.2. The Burkert 8220 conductivity sensors shall replace the existing sensors at locations BLRFD-SC-1 (Boiler Feed Suction) and COND-SC-1 (Condensate Discharge), as referenced on CG Drawing 420-WAGB-535-001.
3.2.3. The new sensors shall be adapted to the existing 1-1/4 inch NPT fittings using the specified Burkert S020 adapters.
3.3. System Integration:
3.3.1. The Burkert 8619 controllers shall be connected to the ship's Machinery Plant Control and Monitoring System (MPCMS).
3.3.2. The controllers' 4-20mA analog output shall be configured to represent a range of 0-20 µS/cm (micro siemens per centimeter).
4. TASKS AND DELIVERABLES. The Contractor shall perform the following tasks and provide the specified deliverables:
4.1. Removal and Installation:
4.1.1. The contractor shall remove the existing McNab MC-81 units and complete installation of all components as listed under (3.0) Technical Requirements.
4.2. System Configuration and Calibration:
4.2.1. Set the system's high salinity alarm parameter to 0.2 Grains Per Gallon (GPG).
4.2.2. Calibrate both conductivity sensors using a 5µS/cm calibration solution upon completion of installation.
4.3. Testing and Training:
4.3.1. Conduct a comprehensive operational test of the entire system in the presence of a
Government representative to verify full functionality.
4.3.2. Provide system familiarization and operational training to designated ship's crew during the operational test.
4.4. Documentation and Reporting:
4.4.1. Provide as-installed wiring diagrams for the Burkert 8619 controller's input and output connections.
4.4.2. Submit a final Condition Found Report (CFR) within five (5) working days of work completion, detailing the work accomplished and the results of the operational test.