This is a Statement of Work and Specification document for dockside repair and maintenance services on the USCGC STORIS (WAGB-361) during Fiscal Year 2027. The document, developed by Ryan R Young and revised to November 20, 2026, outlines 25 discrete work items that contractors must execute during the vessel's dockside availability period.

The work scope encompasses comprehensive ship maintenance and repair operations organized into specific task categories: tank cleaning and inspection (potable water, grey water, sewage, and accessible voids); overhaul of watertight doors and miscellaneous valves; commercial cleaning of ventilation systems and exhaust ducts; thermal oil heater maintenance; fire main system restoration; plumbing drain cleaning; fuel oil connection repairs; crane maintenance and inspection (forward crane and aft knuckle boom crane); rescue equipment overhaul and testing (rescue doors, lifeboats, davits, and fast rescue craft); sewage treatment system inspection and repair (EVAC and FAST systems); heated pilothouse window and deck renewal; and fire prevention services. The specification incorporates by reference numerous Coast Guard technical drawings, publications, and standards (including SFLC Standard Specifications for welding, electrical cable work, ventilation systems, and fire prevention), federal regulations under Title 46 CFR, American standards (ANSI, ASME, ASTM), and equipment-specific manuals from manufacturers including Appleton Marine, Aalborg Industries, and others. The contractor must furnish all necessary labor, materials, services, equipment, supplies, power, facilities, and accessories required to complete the work in accordance with the specification and applicable standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC STORIS (WAGB 21)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2027

Developed By: Ryan R Young

(Rev03, 20 November 2026)

USCGC STORIS (WAGB-361) DOCKSIDE AVAILABILITY FY2027

ii (Rev03)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ........................................................................................... xvi Principal Characteristics ........................................................................................................................... xvii General Requirements ............................................................................................................................. xviii WORK ITEM 1: Tanks, Potable Water, Clean and Inspect WORK ITEM 2: Voids, Accessible, Clean and Inspect WORK ITEM 3: Tanks, Clean and Inspect WORK ITEM 4: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 5: Sewage Holding Tanks, Clean and Inspect WORK ITEM 6: Horizontal Hydraulic Sliding Watertight Doors, Overhaul WORK ITEM 7: Miscellaneous Valves, Overhaul WORK ITEM 8: Accommodations Ventilation Systems, Commercial Clean WORK ITEM 9: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 10: Thermal Oil Heater, Clean and Inspect WORK ITEM 11: Fire Main Recirculation/Pressure Relief Loop, Restore WORK ITEM 12: Plumbing Drains, Clean WORK ITEM 13: Fuel Oil Connections, Repair WORK ITEM 14: Forward Crane, Annual Maintenance, Inspect and Repair WORK ITEM 15: Aft Knuckle Boom Crane, Corrective and Annual Maintenance WORK ITEM 16: Rescue Doors, Overhaul WORK ITEM 17: Incinerator, Inspect and Test WORK ITEM 18: Fast Rescue Craft Davit, Level 1, Inspect WORK ITEM 19: Lifeboat and Davit, Five Year, Inspect and Test WORK ITEM 20: Fast Rescue Daughter Craft Davit, Level 1, Inspect WORK ITEM 21: EVAC Sewage Treatment System, Open, Inspect & Repair WORK ITEM 22: FAST Sewage Treatment System, Open & Inspect WORK ITEM 23: Heated Pilothouse Window, Renew WORK ITEM 24: Heated Deck, Renew WORK ITEM 25: Fire Prevention, Provide iii (Rev-03)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred after a Revision 0 (Rev-0) package.

Information listed is intended to provide contractors and field unit personnel with a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

14 Oct 2026 01 21 Revised GPF table to reflect EVAC quote

“ “ 11 Removed A-Team Note

6 Nov 2026 02 17 Removed Elevator Item

“ 19 Changed from Annual to 5 year requirement

“ 3 Added Fuel Oil Day Tanks

“ N/A Revised Consolidated GFP to suit

20 Nov 2026 03 19 Revised GFP and scope

N/A Revised Consolidated GFP to suit

NOTE : This revised specification is self-contained with all the above listed changes incorporated.

iv (Rev-03)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 361 WAGB 077-1, Rev 0, FIRE PLAN (D20_247)

Coast Guard Drawing 361-WAGB 085-002, Rev K, GENERAL ARRANGEMENT (D2)

Coast Guard Drawing 361 WAGB 085-3, Rev B, Tank Capacity Plan (D3)

Coast Guard Drawing 361-WAGB 167-1, Rev B, Manholes & Hatches (05)

Coast Guard Drawing 361 WAGB 185-4, Rev B, RESCUE BOAT AND DAVIT (S126R)

Coast Guard Drawing 361-WAGB 201-1, Rev B, MACHINERY ARRANGEMENT (D10)

Coast Guard Drawing 361 WAGB 264_2, Rev C, FUEL OIL TRANSFER SYSTEM (M28)

Coast Guard Drawing 361-WAGB 320-1, Rev C, POWER ONE LINE (E2)

Coast Guard Drawing 361-WAGB 324-1, Rev A, EMERGENCY SWITCHBOARD CABLE PULL LIST (E109

Coast Guard Drawing 361 WAGB 390-1, Rev B, HEAT TRACE DECK EPOXY LAYOUT (O99)

Coast Guard Drawing 361 WAGB 506-2, Rev D, Tank Level Indication System (M26)

Coast Guard Drawing 361 WAGB 511-1, Rev B, ELECTRICAL HEAT TRACING ONE LINE (E72)

Coast Guard Drawing 361 WAGB 512-1, Rev B, VENTILATION SYSTEM (046).

Coast Guard Drawing 361 WAGB 512-2, Rev B, VENTILATION SYSTEM YARD DWG (O46YD)

Coast Guard Drawing 361 WAGB 514-1, Rev B, HVAC GLYCOL COOLING SYSTEM (M64)

Coast Guard Drawing 361 WAGB 521-2, Rev B, FIREMAIN ARRANGEMENT (M12)

Coast Guard Drawing 361 WAGB 532-1, Rev B, FRESH WATER COOLING SYSTEM (M6)

Coast Guard Drawing 361 WAGB 533-1, Rev B, POTABLE WATER SYSTEM (M21)

Coast Guard Drawing 361 WAGB 541-2, Rev E, SHIP'S FUEL OIL TRANSFER SYSTEM (M3)

Coast Guard Drawing 361-WAGB 555-3, Rev B, FIREFIGHTING SYSTEM, ARRANGEMENT AND

DETAILS

Coast Guard Drawing 361 WAGB 572-1, Rev B, ELEVATORS (S82)

Coast Guard Drawing 361 WAGB 583-2, Rev B, INFLATABLE LIFERAFT CRADLE (S68)

Coast Guard Drawing 361 WAGB 593-1, Rev C, GREY, BLACK, SANITARY WATER SYSTEM (M22)

Coast Guard Drawing 361 WAGB 597-001, Rev B, Recovered Oil Heating (M68)

Coast Guard Drawing 361 WAGB 602-7, Rev B, Tank Labeling Arrangement (M49)

Coast Guard Drawing 361 WAGB 621-1, Rev B, JOINER WALL ARRANGEMENT (O21) v (Rev-03)

Coast Guard Drawing 361 WAGB 621-2, Rev A, JOINER CONNECTION DETAILS (O22)

Coast Guard Drawing 361 WAGB 635-2, Rev B, WINDOWS & SIDELIGHTS (O6)

Coast Guard Drawing 361 WAGB TBD, Rev B, JUNCTION & CONTROL BOX SCHEMATIC BOOK (E11)

Coast Guard Drawing 361 WAGB 637-1, Rev B, JOINER CEILING ARRANGEMENT (O23)

Coast Guard Drawing FL-1702-11, Sheave Inspection

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 5207, S9555-DM-MMC-010, Fire Extinguishing System, High Pressure Carbon Dioxide

Coast Guard Technical Publication (TP) 7427, SWBS 651, Aug 2014, R-102 Restaurant Fire Suppression System – Design, Installation, Recharge and Maintenance Manual

Coast Guard Technical Publication (TP) 10019, SWBS 555, May 2017, Fixed Firefighting System

COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Latest Version, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Aalborg Industries, Drawing D117334, Skid <electronic copy provided upon request>

Aalborg Industries, Drawing D107252, Mission TFO H4-0-TFO0-015 <electronic copy provided upon request>

Aalborg Industries, Thermal Fluid Installation for North American Shipbuilding, Operations and Maintenance Manual <electronic copy provided upon request>

American National Standards Institute (ANSI), A118.10, 2019, Standard Specifications for Load Bearing, Bonded, Waterproof Membranes for Thin-set Ceramic Tile and Dimension Stone Installation

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End

Appleton Marine Inc, Dwg # AMD-2167 REV 1, Piping Assembly vi (Rev-03)

Appleton Marine Inc, Dwg # CMD-0805 REV 0, Hydraulic Schematic

Appleton Marine Inc, Dwg # AMD-2168 REV 1, Electrical Assembly

Appleton Marine Inc, Dwg # CMD-0806 REV 1, Electrical Schematic

Appleton Marine Inc, Dwg # BMD-0645, Crane Outline

Appleton Marine Inc, Installation, Operation, And Maintenance Manual For Electro-Hydraulic Knuckle Boom Crane, Model Number: EB30-30-18

Appleton Marine Inc, Dwg # DMD-3528, Pedestal

Appleton Marine Inc, Dwg #NMD-1069, Lubrication Chart

Appleton Marine Inc, Dwg # AMD-2115 REV 1, Electrical Assembly

Appleton Marine Inc, Dwg # CMD-0786 REV 2, Electrical Schematic

Appleton Marine Inc, Dwg # BMD-0633, Crane Outline

Appleton Marine Inc, Dwg # AMD-2114 REV 1, Piping Assembly

Appleton Marine Inc, Installation, Operation, And Maintenance Manual For Electro-Hydraulic Knuckle Boom Crane, Model Number: KB600-60, Serial Number: 16765

American Society of Testing and Materials (ASTM), C 881, Standard Specification for Epoxy-Resin- Base Bonding Systems for Concrete

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

Bayards Drawing ED:4900R2, EHT CONTROL PANEL 10076 <Electronic Copy Available Upon Request>

CaptiveAire Drawing, Job Number 1201468 <electronic copy available upon request>

Code of Federal Regulations (CFR) Title 46, Part 61.30, Tests and Inspections of Fired Thermal Oil Heaters

Code of Federal Regulations (CFR), Title 46 Chapter I Subchapter Q Part 160 Subpart 160.151 § 160.151-57 Servicing Procedure.

Code of Federal Regulations Title 46 Chapter I Subchapter L Part 131 Subpart E § 131.575

EVAC User’s Manual Icebreaker Edison Chouest, Rev.0 /Aug. 2010 (electronic copy provided upon request)

Fassmer, Operator’s Handbook for lifeboats type CL / CLR / GMR with NADIRO Drop in Ball Release <To be provided electronically upon request>

FPS New Orleans Drawing “Kidde Marine High Pressure Carbon Dioxide Fire Suppression System, North American Shipbuilding Hull 247” <electronic copy provided upon request>

Green Marine, EVAC Vacuum Sewage Collection System and FAST Sewage Treatment System (electronic copy provided upon request, FAST Operating Instruction Manual begins page 151)

IMO MSC.402(96)

IMS drawing 357049.03, Assembly and Loose Items Drawing WT-Doors, Type N-280 and N200 <electronic copy available upon request>

International Maritime Organization Resolution A.761(18), Recommendation on Conditions for the Approval of Servicing Stations for Inflatable Liferafts

King and Associates LLC, Drawing “HVAC (High and Low Pressure) System Engineering to SOLAS Standard’, Rev 1, 1/30/12 <Electronic Copy Provided upon request

Marioff Hi-Fog® Drawing D-32305 “Hi Fog Layout Diagram, FPS Hull 247” <electronic copy provided upon request>

Marioff Hi-Fog® Operations and Maintenance Manual <electronic copy provided upon request> vii (Rev-03)

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated

MIL-DTL-15024F General Specifications for Plates, Tags, and Bands for Identification of Equipment

MIL-PRF-23236, Aug 2009, Coating Systems for Ship Structures

MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull

MIL-PRF-24667, Mar 2018, Coating system, Non-Skid, for Roll or Spray Application

MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

National Fire Protection Association (NFPA) 25, 2023, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems

Supreme Integrated Technology Drawing S10230-5000, Hull 247 Icebreaker Rescue Door Arrangement

TeamTec, Instruction Manual, Incinerator GS 500C(S) (Electronic copy provided upon request)

Tranberg AS, INSTALLATION INSTRUCTIONS FOR ANTI-ICE SELF-REGULATING HEATING CABLES HEAT TRACE JB, ACCESSORIES, CONTROL SYSTEMS, Version 1.2 (Electronic copy available upon request)

Vestdavit AS, VDT-UMP-92209, USER MANUAL, Inspection & Maintenance, VESTDAVIT TYPE PAP–9000 <Electronic copy provided upon request> viii (Rev-03)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of properties which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

13 N STANAG 3756 4” dry break connector, ANSI Class 150 Flange, Stainless Steel

MannTeck T563B4401 or

TODO II TT405-4407

1 ea. $1,907.85

13 N STANAG 3756 6” dry break connector, ANSI

Class 150 Flange, Stainless Steel

TODO II TT605-4407 1 ea. $7,455.23

14 N Brake Valve Seal Kit Appleton Marine YMD-6596- R

1 ea.

14 N Sheave Appleton Marine YMD-4892 2 ea.

14 N Return Filter Appleton Marine YMD-3383-

R 1 ea.

14 N Motor Seal Kit Appleton Marine YMD-4944- R1

1 ea.

14 N Tri Color Gauge Appleton Marine YMD-10377 1 ea.

14 N Breather Appleton Marine YMD-10113 1 ea.

14 N Pressure Gauge Appleton Marine YMD-9532 1 ea.

14 N Winch Rebuild Kit Appleton Marine YMD-9404-

R 1 ea.

14 N Standby Valve Appleton Marine YMD-10358 1 ea.

14 N Sheave Pin Appleton Marine MMD-4630 2 ea.

14 N Sounder Appleton Marine YMD-10112 1 ea.

14 N Thrust Washer Appleton Marine WMD-0600 4 ea.

14 N Luff Cylinder Rebuild

Kit Appleton Marine YMD-

11463-R 1 ea.

15 Joystick Assemblies Appleton Part Number YMD- 10175

2 ea.

15 Crane Cab Air Conditioner w/ Electric

Heat

Appleton Part Number YMD-

1 ea.

15 Rexroth Amplifiers Appleton Part Number YMD- 14422

4 ea.

15 Directional Control Valve Repair Parts

Appleton Part Number YMD- 11284-R

1 ea.

15 Deadman Foot Switch Appleton Part Number YMD-

1 ea.

15 Directional Control Valve Solenoid Coils

Rexroth Bosch PN R901205197

8 ea.

15 DCV Solenoid Coil Connectors

Rexroth Bosch, PLUG-IN

CONNECTOR 3P Z4 M SW

8 ea.

ix (Rev-03)

SPEZ, PN: R901017011

15 Hydraulic Pump

Unloading Valve Appleton Part Number YMD-

10152 1 ea.

15 Hydraulic Pressure Unit “Filter Dirty” gauge

Appleton Part Number YMD- 10377

1 ea.

15 Hydraulic Oil Tank Breather Filter

Appleton Part Number YMD- 10113.

1 ea.

15 System Standby Valve Appleton Part Number YMD- 10358

1 ea.

15 Gasket – HPU Return Filter Adaptor

Appleton Part Number MMD-

1 ea.

15 HPU Return Filter Appleton Part Number YMD- 10259

1 ea.

15 Y Tensioner Pump Appleton YMD-9807 1 ea. $32,325.00 15 Y Tensioner Hose Appleton YMD-9808 1 ea $2089.00 15 Y 1.50-6-UNC Stud

Tensioner Appleton YMD-10258 1 ea $23,844.00

15 N Emergency Lowering

Release Appleton Part Number YMD-

1 ea. $5,321

15 N Junction Box Appleton Part Number YMD-

4 ea. $1,214

15 N Wedge Socket Appleton Part Number YMD-

92092 1 ea. $1,252

15 N Crane Block Appleton Part Number YMD-

11248 1 ea. $21,038

15 N Control Valve Seal Kit Rexroth R961000391 5 ea.

15 N Sheave 16" dia x 3/4

Rope Appleton Part Number YMD-

2 ea. $4,608

15 N Sheave 18" dia x 3/4

Rope Appleton Part Number YMD-

4 ea. $2,539

15 N Thrust Washer, Guide

Sheaves Appleton Part Number

WMD-2175

4 ea.

15 N Pin Guide Sheaves Appleton Part Number

MMD-4363

2 ea.

15 N Brake Valve Repair Kit Appleton Part Number YMD-

8844-R1 1 ea.

15 N Winch Seal Kit Appleton Part Number YMD-

8844-R1 1 ea.

15 N Winch Motor Seal Kit Appleton Part Number YMD-

11274-R 1 ea.

15 N Pin Lower Headbox

Sheave Appleton Part Number

MMD-5099

1 ea.

15 N Thrust Washer, Headbox Sheave Appleton Part Number

WMD-1100

10 ea.

15 N Hydraulic Motor Seal

Kit Appleton Part Number YMD-

7946-R 3 ea.

15 N Pin, Upper Headbox Appleton Part Number 2 ea.

x (Rev-03)

Sheave MMD-5100

15 N Turntable Washer Appleton Part Number YMD-

11215 12 ea.

15 N Turntable Hex Nut Appleton Part Number YMD- 11251

12 ea.

17 N diesel oil burner nozzle

1, 3.5 GPH 60°

TeamTec part number12324 1ea. 42.32

17 N Diesel oil burner nozzle

2, 5.5 GPH 45°

TeamTec part number 11260 1 ea. 50.01

17 N Sludge Dosage Pump bonded stator

Team Tec Part No. 15748 1 ea. 303.78

18 N Proportional Control Valve, - PSV 6-5, 4-sections

Vestdavit Part Number 24353 1 ea. 23,795.00

18 N Limit Switch Valve HV 222-L

Vestdavit Part Number 10177 2 ea. 5,995.00

18 N Limit switch, Link

SK1503

Dwg D-01210 Item 9 Dwg. 109530+117074

Vestdavit Part Number 11033 1 ea. 2,195.00

18 N Limit Switch, Clamp Plastic

Ø16-18mm

Vestdavit Part Number 18557 1 625.00

18 N Wirepuller Wheel for SK-1503

Vestdavit Part Number 15963 1 2,695.00

18 N WS-1k Valve Block incl. valves _For Line

Puller

Vestdavit Part Number 10083 1 4,495.00

18 N Bladder accumulator 10L Arctic QHP Accumulator 10L

Vestdavit Part Number 15582 2 6,595.00

18 N Adapter Accumulator – Shockabsorber, Shockabsorber 10L to 50L

Complete with Dowty ring & O-ring

Vestdavit Part Number 12015 1 1,395.00

18 N Adapter accumulator neck, 316, 2"-> 1/2"

BSP

Vestdavit Part Number 16531 2 895.00

18 N Bladder Accumulator 35L Arctic, QHP Accumulator 35L

Vestdavit Part Number 15584 1 10,095.00

18 N Filter Cartridge - Pressure – HPU, HP320210

Vestdavit Part Number 11970 1 1,195.00

18 N Filter Cartridge - Return – HPU, MF400310

Vestdavit Part Number 13165 1 1,295.00

18 N Breather Filter, Vestdavit Part Number 22800 1 1,095.00 xi (Rev-03)

Thermally reactive, moisture blocking

18 N Adapter _For Breather _Filter - Part 22800

Vestdavit Part Number 22801 1 345.00

18 N Guiding Cylinder Seal Kit - Arctic, CD20-

63/32

Vestdavit Part Number 13246 2 6,895.00

18 N Guiding Cylinder Bearing Spherical -

CD10/20/25 SS 80/40

_& /50

Vestdavit Part Number 11972 4 1,350.00

18 N Retaining Ring - For Guiding Cylinder Bearing

65/32, 63/32 _& /40

Vestdavit Part Number 11532 8 20.00

18 N Main Davit Cylinder Seal Kit - Arctic, CD20-100/50

Vestdavit Part Number 13245 2 8,625.00

18 N Main Davit Cylinder Bearing Spherical -

CD10/20/25 SS

100/50/63 _& 110/56

Vestdavit Part Number 11182 4 1,950.00

18 N Retaining Ring - _For Cylinder Bearing

100/50/63 _& 110/56

Vestdavit Part Number 11533 8 50.00

18 N Seal Kit - Shockabsorber -

CP4BG80

Vestdavit Part Number 13247 1 6,395.00

18 N Sealing Box Ring - _For CP4 BG80 Shock absorber

Vestdavit Part Number 13206 1 2,875.00

19 N Lifeboat Davit Wire Rope Falls, Left Hand

Lang Lay: 20 mm, 35x7 compacted, 1960

N/mm², 372 kN, galvanized, 45 m

2 ea. $2000.00

19 N Lifeboat Davit Wire Rope Falls, Right Hand

Lang Lay: 20 mm, 35x7 compacted, 1960

N/mm², 372 kN, galvanized, 54 m

2 ea $2000.00

19 N Accumulator bladder

EHV10

SH Group 10000853 2 $1200.92

19 N Accumulator bladder-

EHV 54

SH Group 10000860 10 $4198,00

19 N Accumulator N2 filling valve

SH Group 10000877 12 $224.92

19 N O-Ring NB-70 54,5x3,0mm adaptor

SH Group 10053834 12 $0.90 xii (Rev-03)

EHV50/32

19 N O-Ring NB-70

37,2x3,0mm adaptor

EHV6

SH Group 10053835 12 $0.90

19 N O-Ring NB-70 14,00x1,78mm Gas side

SH Group 10053836 12 $0.90

19 N O-Ring NB-70 4,76x1,78mm Press G

SH Group 10053837 12 $0.90

19 N Tread Seal-Bonded 18C

1/2"ELM0,075/0,5/0,16

SH Group 10008995 12 $0.90

19 N Pressure gauge 400 Bar Hyd accum.

SH Group 10006799 12 $37.67

19 N O-Ring NB-70 4,76x1,78mm Press G

SH Group 10053837 12 $0.90

19 N Brake pads set SH Group 10000068 4 $1400.55 19 N MED Hyd. Hose set item 109 SH Group 10005288 2 $7300.10

19 N Densyl tape 50mm LB SH Group 10009904 10 $19.43 19 N Boat In Box service kit – contains next 12 items

SH Group 10058875 2 Contains next 12 items

19 N Hyd. Breather filter- F7.285X290X48

SH Group 10011075 2 $55.00

19 N Filter Cartridge MP

CS-150-P10A

SH Group 10001962 4 $62.00

19 N Filterelement GB938773Q-for 70-1-

10Q

SH Group 10001752 2 $179.00

19 N Refill Kit Lekang

(KL93R)-

SH Group 10002018 2 $117.00

19 N Grease-KLUBER

GREASE ISOFLEX

NBU15

SH Group 10009828 2 $239.00

19 N Accumulator Corsion.

sticker--

SH Group 10017459 2 $2.24

19 N Marking-SHG-accumulator insp--

SH Group 10020552 12 $2.16

19 N Xervo service inspec.

sticker

SH Group 10014389 2 $2.17

19 N Controlfuse 15amp-- SH Group 10015909 2 $1.11 19 N Plombe - plast pull-tight--plast - 200mm SH Group 10011183 4 $0.34

19 N Marking-SH Group - Service proformed

SH Group 10014401 8 $1.87

19 N Xervo certificate 10Y service

SH Group 2 $224.23

19 N Drop In Ball II 600 5 Y Service Kit

SH Group 10053336 2 (contains next 6 items) xiii (Rev-03)

(contains next 6 items 19 N Xervo Seal for Emerg.

R. Valve SH Group 10011183 2 $0.34

19 N Xervo service label SH Group 10014389 4 $2.17 19 N Control fuse 10 Amp SH Group 10011040 4 $0.22 19 N Main fuse 80 Amp SH Group 10011039 4 $5.39 19 N Hyd. Air Breather filter SH Group 10001531 4 $158.83 19 N Spring 9011531 System

I / 1,5x15x60MM SH Group 10009351 8 $13.08

19 N DIB HPU 5Y service kit Lifeboat

SH Group 10038711 (contains next 8 items)

19 N Adaptor for accumulator

SH Group 10000881 4 $3.75

19 N Membrane Accumulator-MEAK

1,00-210-G 1/2

SH Group 10039569 4 $115.68

19 N FILTERELEMENT

14/10R

SH Group 10002048 4 $28.92

19 N FILTERELEMENT

14/10R

SH Group 10002048 4 $14.46

19 N Tread Seal-Bonded seal 18C 1/2"

SH Group 10008995 4 $1.07

19 N Tread Seal-Bonded seal 16C 3/8"

SH Group 10009002 4 $0.64

19 N Seal kit complete- Nadiro HPU

SH Group 10034487 2 $10.58

19 N Fitting Metric-DOZ 10 L-Cr6 free

SH Group 10003157 4 $4.88

19 N Drop In Ball--DROP

IN BALL 100KN_GA

SH Group 10012605 4 $1601.76

19 N Wirelock resin kit LB SH Group 10009855 4 $91.19 19 N Lifeboat Stern Tube

Packing/Shaft Seals SH Group 2 $34.60

19 N Lifeboat Drain Valve Cork Ball

SH Group 2 $3.82

19 N External light, no flash

SL-45012-24 VDC

Power

SH Group 10091818 2 $145.00

19 N UPS battery SH Group 10013073 2 $381.00 19 N Fassmer 10Y certificate lifeboat SH Group 2 $230.00

20 N Bladder Accumulator 04L Arctic -

Accumulator 04L Note

- For Docking Head

Vestdavit Part Number 15581 1 5,225.00

20 N Adapter Accumulator – Shockabsorber 4l Acc.

to 1 1/4'' flange

Vestdavit Part Number 10485 1 1,995.00

20 N Bladder accumulator Vestdavit Part Number 15583 2 8,150.00 xiv (Rev-03)

20L Arctic, QHP Accumulator 20L, 316SS - 1/4" Gas valve, 2" Oilport, Note - For

Shockabsorber and Emergency Winch

Lowering 20 N Adapter Accumulator –

Shockabsorber, Shockabsorber 10L to

50L Complete with Dowty ring& O-ring

Vestdavit Part Number 12015 1 1,395.00

20 N Bladder accumulator 50L Arctic, QHP Accumulator

50L Note - For Emergency

Davit Outswing

Vestdavit Part Number 15585 3 10,895.00

20 N Adapter accumulator neck, 316 2"-> 1/2"

BSP

Vestdavit Part Number 16531 4 895.00

20 N Filter Cartridge - Pressure - HPU

HP320210

Vestdavit Part Number 11970 1 1,195.00

20 N Filter Cartridge - Return - HPU

MF400310

Vestdavit Part Number 13165 1 1,295.00

20 N Breather Filter, Thermally reactive, moisture blocking

Vestdavit Part Number 22800 1 1,095.00

20 N Adapter For Breather Filter - Part 22800 HS

Code: 39269098

Vestdavit Part Number 22801 1 345.00

20 N Wirepuller Wheel, 250 S-1506

Vestdavit Part Number 10585 1 2,495.00

20 N Seal kit for Hydraulic Cylinder CD20-63/32

Note - For Trim Cylinders

Vestdavit Part Number 10534 2 1,295.00

20 N Bearing Spherical -

CD10/20/25 SS 80/40

& /50 – for trim cylinders

Vestdavit Part Number 11972 4 1,350.00

20 N Retaining Ring - For Cylinder Bearing

65/32, 63/32 & /40 – for trim cylinders

Vestdavit Part Number 11532 8 20.00

20 N Seal Kit - CD20-80/40

– for heel cylinder

Vestdavit Part Number 10655 1 1,445.00

20 N Bearing Spherical - Vestdavit Part Number 2 1,350.00 xv (Rev-03)

CD10/20/25 SS 80/40

& /50 – for heel cylinder 20 N Retaining Ring - For

Cylinder Bearing.

80/40 & /50 – for heel cylinder

Vestdavit Part Number 14679 4 30.00

20 N Seal Kit - CD20- 200/100 – for kipp cylinders

Vestdavit Part Number 12007 2 2,995.00

20 N Bearing Spherical -

CD10/20/25 SS

200/100 – for kipp cylinders

Vestdavit Part Number 15280 4 4,295.00

20 N Retaining Ring - For Cylinder Bearing

200/100 – for kipp cylinders

Vestdavit Part Number 15281 8 95.00

20 N Seal Kit - CD20-160/80

– for davit cylinders

Vestdavit Part Number 10759 2,435.00

20 N Bearing Spherical -

CD10/20/25 SS 160/80

& 180/90 – for davit cylinders

Vestdavit Part Number 4 3,225.00

20 N Retaining Ring - For Cylinder Bearing 160/80 & 180/90

Vestdavit Part Number 13255 8 95.00

20 N Seal Kit - Shockabsorber -

CP4BG110

Vestdavit Part Number 10524 1 2,725.00

20 N Sealing Box Ring - For

CP4 BG110

Shockabsorber

Vestdavit Part Number 13664 1 2,995.00

21 N Membrane Modules PN: 6555650 4 ea. 5,202.77 21 N Level Switches PN: 70701001 8 ea. 675.69 21 N Solenoid Valve PN: N11709942 1 ea. 812.58 21 N Solenoid Valve PN: N11709942 1 ea. 812.58 21 N pH Sensor PN: 6545377 1 ea. 992.61 23 N Fehrmann 5-4-Q / 24

Fixed Window, C.O.

1778/1445x1805

Heated Glass 12mm = 6mm, Drawing number

125644_KA_engl

PN: 125644_KA 1 ea. $11,000

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xvi (Rev-03)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars):

Work Item

Title

2 Voids, Accessible, Clean and Inspect

3 Tanks, Clean and Inspect

12 Plumbing Drains, Clean

14 Forward Crane, Annual Maintenance, Inspect and Repair

15 Aft Knuckle Boom Crane, Corrective and Annual Maintenance xvii (Rev-03)

PRINCIPAL CHARACTERISTICS

361’ WAGB

PHYSICAL

Length overall 360 ft 11 in Length between perpendiculars 324 ft 3 in Beam, extreme 80 ft 1 in Depth amidships to main deck 43' 2-7/8" Draft to bottom of keel @ full load 28 ft 3 in Full load displacement 12,892 long tons Effective keel length 223 ft Mast height above DWL @ 28' draft 138 ft

HULL

Frame spacing 16" Material Hull ABS DH36, EH36 steel Flight deck Aluminum Superstructure ABS AH36 steel

MACHINERY

Propulsion, diesel 4 x Caterpillar C280-12 Propellers Two ducted controllable-pitch propellers Generators 4 x Caterpillar 3512C HD SSDG

2 x Caterpillar C32 EDG 2 X Shaft Generators

Sewage equipment 4 holding tanks with pumps 4 (2 P & 2 S) deck discharge stations

Rudder Two, high lift, independent action Anchor & chain Two 9,000 lb navy stockless, 165 fathom chain each

TANKS

Fuel Oil 799,853 gal.

JP-5 (helo) 8,830 gal.

lube oil 28,000 gal.

Fresh water 115,489 gal.

Sewage 4,320 gal Grey Water 72,917 gal Cargo Area Wash Water 84,335 gal Ballast/Rig Water 776,213 gal xviii (Rev-03)

00000_0226_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI apply to all work under the xix (Rev-03) scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Coatings approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written COR authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 Conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

xx (Rev-03)

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. The Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. The Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is LQG.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations follow applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the COR and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must xxi (Rev-03) furnish the FRP when required for over-the-water liquids transfers to and from vessels and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

xxii (Rev-03)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

xxiii (Rev-03)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

xxiv (Rev-03)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /

TIME

xxv (Rev-03)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils) xxvi (Rev-03)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

xxvii (Rev-03)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

xxviii (Rev-03)

4.2 Tank and Void Assessment form.

xxix (Rev-03)

30 Rev 03

12314_RRY_0826_361

WORK ITEM 1: Tanks, Potable Water, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TABLE 1 - TANKS

TYPE OF TANK LOCATION

FR - FR

CAPACITY -

100%

(GALLONS)

Potable Water 1-P 15-27 12787.5

Potable Water 1-S 15-27 12787.5

Potable Water 2-P 22-36 44956.8

Potable Water 2-S 22-36 44956.8

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 361 WAGB 602-7, Rev B, Tank Labeling Arrangement (M49)

Coast Guard Drawing 361 WAGB 85-3, Rev B, Tank Capacity Plan (D3)

Coast Guard Drawing 361-WAGB 167-1, Rev B, Manholes & Hatches (05)

Coast Guard Drawing 361 WAGB 506-2, Rev D, Tank Level Indication System (M26)

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Series, General Requirements

OTHER REFERENCES

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

31 Rev 03

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

3. REQUIREMENTS

3.1 General. Coordinate work on this item with Work Item “Miscellaneous Valves, Renew”.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:

Fluid contents

Piping

RO system components

Deck grating.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

Only one tank at a time may be worked at a time due to the cutter’s shore tie configuration.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.

TLI

3.3 Plug log. The Contractor must keep a written record of all plugs put in any tank vents. A separate list must be kept for each tank being entered.

3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

3.4 Tank content removal. The Contractor must remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.

32 Rev 03

3.5 Tank cleaning. The Contractor must remove tank cover(s); clean tank interior surfaces free of all foreign materials, such as sediment, sludge and bacterial growth. Remove all persistent residues, taking care not to damage any tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.

3.6 Inspection. The Contractor must visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Complete the “Tank and Void Assessment Form” (found in the Work Item titled “General Requirements”) and submit via CFR. Electronic PDF version of this form will be furnished by the COR upon request. Include the following, as applicable:

Tank structural condition.

Inaccessible areas, if any.

Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

Tank level indicator (TLI)…