Attach 1 - Blank Pricing Sheet.xls
XLS spreadsheet 90 KB Posted
- Attached to
- USCGC GREENBRIER DRYDOCK REPAIRS FY27
- Solicitation number
- 70Z08526QIBCT0066
About this file
This is a blank pricing sheet template for drydock repairs on the USCGC GREENBRIER (WLR-75F) and associated USCG barge during FY2027. The template contains 60 line items organized into definite and optional work categories, with separate pricing sections for tender and barge maintenance activities. Required work includes hull plating inspection and ultrasonic testing, structural steel plate renewal in various weights (7.65 to 20.4 lbs.), propulsion system maintenance (shaft removal/inspection, seal overhaul, bearing renewal, propeller service), keel cooler cleaning and hydro testing, rudder assembly service, cathodic protection anode renewal, preservation and painting of underwater body, freeboard, decks, superstructure, and tank cleaning/inspection for fuel and potable water systems. Additional items include spud overhaul, drydock services, temporary services, sea trial support, and miscellaneous hardware inspection and testing.
The pricing sheet requires contractors to input unit prices for each line item, with quantities set at one job per item and extended prices calculated automatically. A separate cost estimate breakdown section provides labor rate guidance across multiple geographic shipyard locations (ranging from $45 to $67 per hour median rates), with fields for direct labor categorization by trade (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, and general labor), material and subcontractor costs, and assumed G&A (15%) and profit (10%) factors. The template establishes a composite labor rate structure and allows for area-specific work item identification and file loading data linked to specific shipyard locations including Baltimore, Charleston, Houston, San Diego, and other major maritime repair facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC GREENBRIER (WLR-75F) DRYDOCK AVAILABILITY FY2027 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements - Drydock | NSP | JOB | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect - Tender | JOB | 1 | $0.00 | |
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| O-004 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Tender | JOB | 1 | $0.00 | |
| O-005 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-006 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-007 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-008 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-009 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Tender | JOB | 1 | $0.00 | |
| D-010 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| D-012 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-013 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal | JOB | 1 | $0.00 | |
| D-014 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | $0.00 | |
| D-015 | Propeller s, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-016 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-017 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-018 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-019 | Rudders, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-020 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-021 | Cathodic Protection, Magnesium Anodes, Renew, - Tender | JOB | 1 | $0.00 | |
| D-022 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-023 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-024 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-025 | Hull Plating, U/W Body, Inspect - Barge | JOB | 1 | $0.00 | |
| D-026 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| O-027 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Barge | JOB | 1 | $0.00 | |
| O-028 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-029 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-030 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-031 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-032 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Barge | JOB | 1 | $0.00 | |
| D-033 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-034 | Fathometer Transducer, General Maintenance - Barge | JOB | 1 | $0.00 | |
| D-035 | Cathodic Protection, Magnesium Anodes, Renew - Barge | JOB | 1 | $0.00 | |
| D-036 | Temporary Services, Provide - Barge Barge | JOB | 1 | $0.00 | |
| D-037 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-038 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-039 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-040 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | ||
| D-041 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | ||
| D-042 | Decks-Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | ||
| D-043 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | JOB | 1 | ||
| D-044 | Tanks, MP Fuel Service, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-045 | Tanks, Potable Water, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| O-046 | Propellers (Port and Starboard), Minor Repairs and Reconditioning, Perform | JOB | 1 | $0.00 | |
| D-047 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| O-048 | Tanks, Potable Water, Preserve, Partial, - Tender | JOB | 1 | $0.00 | |
| D-049 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| D-050 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | $0.00 | |
| D-051 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-052 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | 1 | $0.00 | |
| D-053 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Tender | JOB | 1 | ||
| D-054 | Superstructure , Preserve, 100 Percent | JOB | 1 | ||
| D-055 | Superstructure , Preserve, 100 Percent - Barge | JOB | 1 | ||
| D-056 | Shower Pan and Deck Covering, Renew | JOB | 1 | ||
| D-057 | General Deck Covering (Interior), Renew | JOB | 1 | ||
| D-058 | Boat Davit Winch, Shrink Wrap | JOB | 1 | ||
| D-059 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | ||
| D-060 | Baot Deck Preservation - Barge | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 550 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(5/27/2026)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .