Attatchment2-BlankSectionBSOSS revised.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- 70Z08526QIBCT0002
About this file
This file is an Independent Government Estimate (IGE) for the USCGC MALLET (WLIC-75B) Drydock Availability in FY2026, prepared by the US Coast Guard. The detailed estimate includes 50 specific work items ranging from fire prevention requirements and hull plating inspections to mechanical overhauls, preservation tasks, and various repairs. Work items are categorized into definite and optional tasks, covering underwater body inspections, propulsion system maintenance, tank cleaning, sea trials, and structural repairs for both tender and barge components. The document includes a comprehensive breakdown of potential labor rates across multiple geographic regions, though the total price for definite and optional items is currently listed as $0.00, suggesting this is a preliminary estimate template for the drydock availability project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 70Z08526QIBCT0002A0002.pdf | ||
| Clarifications for Solicitation 70Z08526QIBCT0002.docx | DOCX document | |
| Amendment 70Z08526QIBCT0002A0001.pdf | ||
| Attatchment 2 MALLET Blank Section B SOSS revised.xlsx | XLSX spreadsheet | |
| Attachment 3 - Past Performance Information Form MALLET.docx | DOCX document | |
| Attatchment 1- Specs.pdf | ||
| 70Z08526QIBCT0002_Final.pdf | ||
| Attachment 4 - Request for Clarification Form.docx | DOCX document | |
| Attatchment 2- Blank Section B SOSS.xlsx | XLSX spreadsheet | |
| Attatchment 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| GOVERNMENT ESTIMATE FOR: |
| USCGC MALLET (WLIC-75B) DRYDOCK AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | 1 | ||
| D-002 | Hull Plating, U/W Body, Inspect - Tender | JOB | 1 | ||
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | JOB | 1 | ||
| D-004 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | ||
| D-005 | Appendages, U/W, Leak Test - Tender | JOB | 1 | ||
| D-006 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | ||
| D-007 | Voids (Accessible, Weather Deck Exposed), Inspect - Tender | JOB | 1 | ||
| D-008 | Voids, Non-Accessible, Leak Test - Tender | JOB | 1 | ||
| O-009 | Voids, Non-Accessible, Internal Surfaces, Preserve | JOB | 1 | ||
| D-010 | Tanks, MP Fuel Service, Clean and Inspect - Tender | JOB | 1 | ||
| O-011 | Propulsion Shaft Seals, Mechanical Clean and Inspect | JOB | 1 | ||
| D-012 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | ||
| D-013 | Propulsion Shaft Bearings, External, Check Clearances | JOB | 1 | ||
| O-014 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | ||
| D-015 | Propeller s, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-016 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | ||
| D-017 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift - Tender | JOB | 1 | ||
| O-018 | Rudders, Preserve, 100 Percent | JOB | 1 | ||
| D-019 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | ||
| D-020 | Boat Boom, Inspect and Service - Tender | JOB | 1 | ||
| D-021 | Sewage Holding Tanks, Clean and Inspect - Tender | JOB | 1 | ||
| D-022 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-023 | Tanks, Potable Water Preserve, 100 Percent - Tender | JOB | 1 | ||
| D-024 | Drydock - Tender | JOB | 1 | ||
| D-025 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-026 | Hull Plating, Side Scan, Ultrasonic Testing, Barge - Barge | JOB | 1 | ||
| D-027 | Hull Plating, Freeboard, Ultrasonic Testing - Barge | JOB | 1 | ||
| O-028 | Appendages, U/W, Internal, Preserve - Barge | JOB | 1 | ||
| O-029 | Voids, Non-Accessible, Internal Surfaces, Preserve - Barge | JOB | 1 | ||
| D-030 | Fathometer Transducer, General Maintenance - Barge | JOB | 1 | ||
| D-031 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | ||
| O-032 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | ||
| D-033 | Cathodic Protection, Zinc Anodes, Renew - Barge | JOB | 1 | ||
| D-034 | Drydock - Barge | JOB | 1 | ||
| D-035 | Superstructure Plating Repair | JOB | 1 | ||
| D-036 | Fwd Rake Repair Barge | JOB | 1 | ||
| D-037 | Crew's Head Deck Plating, Repair | JOB | 1 | ||
| D-038 | Boom Rest Repair | JOB | 1 | ||
| D-039 | Sewage Shore Tie Riser, Renew | JOB | 1 | ||
| D-040 | Barge Quick Acting Watertight Scuttle, Renew | JOB | 1 | ||
| D-041 | External Deck Drains, Renew | JOB | 1 | ||
| D-042 | Tender Air Compressors, Renew | JOB | 1 | ||
| D-043 | Drop Ceiling, Renew and Abate | JOB | 1 | ||
| D-044 | Weathertight Doors and Frames, Renew | JOB | 1 | ||
| D-045 | Crew Racks, Renew | JOB | 1 | ||
| D-046 | Mechanical Chain Stoppers, Inspect and Service | JOB | 1 | ||
| D-047 | Temporary Services, Provide - Tender | JOB | 1 | ||
| D-048 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | ||
| D-049 | Deck Covering, Interior, Wet and Dry, Renew | JOB | 1 | ||
| D-050 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | |||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| This independent government estimate (IGE) was created using past pricing on similar projects using historical data from Contract Workbook Database. These estimates have compensated for inflation and price trends in the geographical region. |
CostEstimateBreakdowns
| Composite Labor Rate | ||||||||||||||||||||||
| Assumed G&A Factor | ||||||||||||||||||||||
| Assumed Profit Factor | Direct Labor | Direct Material/Subs Cost | ||||||||||||||||||||
| ITEM | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | WorkItemID | WIFileID | LoadData |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
| Composite Labor Rate | |||||||||||||||||
| Assumed G&A Factor | |||||||||||||||||
| Assumed Profit Factor | Direct Labor | Direct Material/Subs Cost | |||||||||||||||
| Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | |||||
| DESCRIPTION | UNIT PRICE | Lab Rate | Area | ||||||||||||||
| $0 | 0 | $0 | 62 | Baltimore, MD | |||||||||||||
| $0 | 0 | $0 | 52 | Biloxi, MS | |||||||||||||
| $0 | 0 | $0 | 56 | Boston, MA | |||||||||||||
| $0 | 0 | $0 | 50 | Charleston, SC | |||||||||||||
| $0 | 0 | $0 | 60 | Corpus Christi, TX | |||||||||||||
| $0 | 0 | $0 | 64 | Honolulu, HI | |||||||||||||
| $0 | 0 | $0 | 55 | Houston, TX | |||||||||||||
| $0 | 0 | $0 | 56 | Los Angeles, CA | |||||||||||||
| $0 | 0 | $0 | 55 | Median Rate | |||||||||||||
| $0 | 0 | $0 | 55 | Median Rate | |||||||||||||
| $0 | 0 | $0 | 50 | Narragansett Bay, RI | |||||||||||||
| 55 | New London, CN | ||||||||||||||||
| 45 | New Orleans | ||||||||||||||||
| 62 | NYNY | ||||||||||||||||
| 49 | Panama City, FL | ||||||||||||||||
| 60 | Philadelphia, PA | ||||||||||||||||
| 51 | Portland, ME | ||||||||||||||||
| 57 | Portland, OR | ||||||||||||||||
| 55 | San Diego, CA | ||||||||||||||||
| 67 | San Francisco, CA | ||||||||||||||||
| 55 | Santa Barbara, CA | ||||||||||||||||
| 55 | SE North Carolina | ||||||||||||||||
| 65 | Seattle, WA | ||||||||||||||||
| 48 | Tampa-St. Petersburg | ||||||||||||||||
| 60 | Wilmington, DE |
File details come from the government source that posted it. Updated .