This is a Statement of Work (SOW) for the fabrication and delivery of exhaust expansion joints for the USCGC POLAR STAR Main Propulsion Generator exhaust system. The contractor must fabricate, test, and deliver two 22-inch multi-ply flex assemblies with liner, including all required labor, supervision, materials, equipment, and tools. The assemblies must operate at normal operating temperature of 900°F with a system design temperature of 1200°F and must be fabricated in strict accordance with Government-furnished drawings, ASTM F1120 standards, and Expansion Joint Manufacturers Association standards. All materials must be new, and any deviations from specifications require written Government approval.
Quality control requirements include liquid penetrant examination of bellows pressure welds, with pneumatic leak testing permitted as an alternative to hydrostatic testing to protect internal insulation. The contractor must install permanent metallic data plates, directional flow arrows, and highly visible shipping bars locked at the 20-inch face-to-face dimension. Each assembly must be delivered with a Certificate of Conformance, properly packaged to prevent damage and corrosion per ASTM F1120. The required delivery date is July 31, 2026, to USCGC Polar Star at 1519 Alaskan Way S, Seattle, WA 98134, Attention: LCDR Joshua Herring (206-758-7682). The solicitation number is 70Z08526Q026573, issued by the Department of Homeland Security US Coast Guard.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S26_031_23000_MLA_0726_10
S26_032_23000_MLA_0726_10
Statement of Work (SOW) -Fabrication and delivery of Exhaust Expansion Joints
1.0 Purpose
The purpose of this requirement is to procure the replacement exhaust expansion joint assemblies for the USCGC POLAR STAR Main Propulsion Generator exhaust system. This requirement is for fabrication and shipping only.
2.0 Scope
The contractor must furnish all labor, supervision, materials, equipment, tools, and incidentals necessary to fabricate and test the expansion joint assemblies identified in this SOW and in the referenced materials.
3.0 Required Quantities
The contractor must fabricate, test and deliver the following:
· Quantity 2 - 22-inch expansion joints
4.0 Applicable Documents
· CG Drawing - 22-inch Expansion Joint Drawing
· STM F1120 (latest) – Standard Specification for Circular metallic Bellows Type Expansion Joints for Piping Applications
· Standards of the Expansion Joint Manufacturers Association
5.0 Operating Conditions
· Normal Operating Temp: 900° F
· System Design Temp: 1200° F
6.0 General Requirements
The Contractor must fabricate the required flex assemblies in strict accordance with the applicable Government-furnished drawings and standards referenced. Any deviation must get written Government approval.
The Contractor must provide new materials only.
The Contractor must fabricate the assemblies in accordance with applicable Expansion Joint Manufacturers Association standards.
The Contractors’ quality control must conform to ASTM F1120. Bellows pressure welds shall undergo Liquid Penetrant (PT) Examination. Per the manufacturer's option allowed in ASTM F1120, a Pneumatic Leak Test may be substituted in lieu of the hydrostatic test to protect the dry internal insulation pack.
The Contractor must install a permanent metallic data plate, and a permanent directional flow arrow must be visible on the outside of the expansion joint per ASTM F1120 requirements.
The Contractor must install shipping bars to lock the assembly rigidly at the 20" face-to-face dimension during transport. Bars shall be painted a highly visible color (e.g., safety yellow) and clearly marked for their removal after installation is complete.
7.0 Technical Requirements for 22-Inch Expansion Joint
For the two 22-inch assemblies, the contractor must fabricate the assemblies in accordance with the referenced drawing package and referenced standards.
8.0 Packaging and Preservation
The contractor shall package each fabricated assembly to prevent damage, distortion, contamination, and corrosion during handling and shipment per ASTM F1120.
9.0 Deliverables
The contractor shall deliver the following:
· Quantity 2 of 22-inch multi-ply flex assemblies with liner
· Certificate of Conformance for each item
10.0 Delivery
Required delivery date: 31JUL26 Delivery address:
USCGC Polar Star 1519 Alaskan Way S Seattle, WA 98134 Attention: LCDR Joshua Herring Phone: 206-758-7682
11.0 Clarifications
If there is any discrepancy between this Statement of Work and the applicable drawing package, the contractor shall notify the Government and obtain clarification before proceeding.