70Z08526Q0023743_SOW.pdf

PDF 242 KB Posted

Attached to
CG SFLC WTGB Officer Stateroom Materials
Solicitation number
70Z08526Q0023743
Issued by

About this file

This is a Scope of Work for U.S. Coast Guard Cutter Availabilities describing modifications required during FY26 drydock and dockside availabilities for four cutters: STURGEON BAY, BISCAYNE BAY, THUNDER BAY, and MORRO BAY.

The contractor shall provide all required materials for installing an additional berthing rack in officer staterooms to accommodate a new officer billet, using Coast Guard Drawing 140-WTGB_641-2-1 as guidance. The materials specified include: one berthing single officer's right-hand aluminum rack with 2" length and 2.5" width in federal color #35617; one sub-base berth at 4" height with stainless steel finish (part number matching guidance); and one mattress officer's rack at 3" length and 2.5" width. All required supplies must be delivered within 90 days of notice of award to four separate homeport locations: CGC Sturgeon Bay (Bayonne, NJ), CGC Biscayne Bay (St. Ignace, MI), CGC Thunder Bay (Rockland, ME), and CGC Morro Bay (Cleveland, OH). Tracking information must be supplied within 48 hours of each individual supply shipment. Technical questions regarding the scope of work should be directed to Project Manager LTJG Kevin Y. Colón at 787-914-4827 or Kevin.Y.Colon@uscg.mil.

View the file

Other files

File Type Posted
70Z08526Q0023743 PandC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

U. S. COAST GUARD CUTTER AVAILABILITIES

SECTION 1 – GENERAL INFORMATION

1.1 Purpose and Scope of Work

1.1.1 United States Coast Guard Cutters STURGEON BAY, BISCAYNE BAY, THUNDER BAY and MORRO BAY will be conducting a drydock and dockside availabilities for FY26. During this time, work item has been added to perform Officer Stateroom modification to add another berthing rack for a new officer billet.

1.1.2 Contractor shall provide all required materials that would allow proper installation of the berthing rack:

Will use Coast Guard Drawing 140-WTGB_641-2-1 as guidance.

1.2 Contact for questions:

Any questions regarding scope of work must be directed to the Project Manager: LTJG Kevin Y. Colón at 787-914- 4827, Kevin.Y.Colon@uscg.mil

1.3 Required Delivery Date and Address

Required supplies shall be delivered to the address below within 90 days or earlier of the notice of award and tracking info must be supplied within 48 hours of each individual supply being shipped.

Attn:

CGC Sturgeon Bay Homeport C/O: MCPO Thaddeous Brandt 85 Port Terminal Blvd, slip 3 Bayonne, NJ

CGC Biscayne Bay Homeport C/O: CWO Shane Witko 1075 Huron St.

St. Ignace, MI 49781-1899

(206) 815-7173

CGC Thunder Bay Homeport C/O: CWO Shawn Hansen 54 Tilson Ave.

Rockland, ME 04841

(206) 815-7131

CGC Morro Bay Homeport C/O: MCPO M. Parker 1055 E 9th St.

Cleveland, OH

File details come from the government source that posted it. Updated .