Solicitation_DMS 70Z08526LREP0004_0001.pdf
PDF 683 KB Posted
- Attached to
- Defense Maritime Solutions - Wartsila Shaft & Rudder Seal Kits for Various Class Vessel's across Coast Guard
- Solicitation number
- 70Z08526LREP0004
About this file
This is a Request for Proposal (RFP) issued by the U.S. Coast Guard Surface Forces Logistics Center for Defense Maritime Solutions (DMS) Shaft & Rudder Parts. The solicitation is for a five-year requirements contract to procure various shaft and rudder seal kits for multiple classes of USCG cutter boats, with five one-year ordering periods from March 2026 to March 2031. The parts must be brand-name items manufactured exclusively by DMS or its authorized U.S. distributors to ensure compatibility and performance.
Key details include a proposal submission deadline of January 14, 2026 at 11:00 AM EST, with an anticipated contract award on or about February 27, 2026 and first delivery order anticipated for March 2, 2026. The evaluation will use a best value source selection process, with technical factors and past performance considered significantly more important than price. Offerors must submit a technical capability document, past performance references, OEM warranty, and other required documentation. The contract will be a firm-fixed-price indefinite delivery vehicle with parts to be delivered to the USCG SFLC Warehouse within 120 days of each delivery order.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION 70Z08526RLREP0004
Defense Maritime Solutions Shaft & Rudder Parts
CONTENTS
PART I – THE SCHEDULE
• SECTION A: SF 1449 Solicitation/Contract/Order for Commercial Items
• SECTION B: Supplies or services and prices/costs
• SECTION C: Description/specifications/statement of work
• SECTION D: Packaging and marking
• SECTION E: Inspection and acceptance
• SECTION F: Deliveries or performance
• SECTION G: Contract administration data
• SECTION H: Special contract requirements
• SECTION I: Contract Clauses
• SECTION J: List of Attachments
• SECTION K: Representations, certifications, and other statements of offerors or respondents
• SECTION L: Instructions, conditions, and notices to offerors or respondents
• SECTION M: Evaluation factors for award
SECTION A: SF 1449 Solicitation/Contract/Order for Commercial Items (continuation)
This is a solicitation for commercial products prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12. Acquisition of Commercial Products and Services with elements of FAR Part 15, Contracting by Negotiation and FAR 16 – Types of Contracts, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested, and a written solicitation will not be issued.
It is the Government’s intention to solicit this Requirements type contract with Firm-Fixed Price Delivery Orders.
Under this type of contract, no work shall be performed until directed by an Order. Electronic mail is an acceptable form of transmission for all orders, modifications, and correspondence issued under this contract.
No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation either before or after the opening/closing date.
The solicitation number 70Z08526RLREP0004 is issued as request for proposal (RFP).
The solicitation document and incorporated provisions and clauses are those in effect through:
- Federal Acquisition Circular 2025-06, effective 01 October 2025
- Department of Homeland Security Acquisition Regulation (HSAR) effective 15 September
- Homeland Security Acquisition Manual (HSAM) 2025-10 effective 03 November 2025
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations.
End of Section A
SECTION B: SUPPLIES OR SERVICES AND PRICES/COST
See Attachment 2_ Schedule of Supplies – DMS Seal Kits for detailed schedule of supplies. The Contractor's price is required for contract line number (CLIN). CLINs highlighted in grey are the complete kits that will be priced and not the individual items.
The proposal should include any quantity discounts offered by the offeror. All line items must be priced to be considered for award.
End of Section B
SECTION C: DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK
See Attachment 3_Statement of Work – DMS Seal Kits. The U.S. Coast Guard (USCG) Surface Forces Logistics Center (SFLC) requires the procurement of various shaft and rudder seal kits manufactured by the Original Equipment Manufacturer (OEM), Defense Maritime Solutions (DMS). These parts are essential for maintenance support of multiple classes of USCG cutter boats.
The required components will be procured exclusively through DMS, or its authorized U.S.
distributor. All parts must be brand-name items manufactured by DMS to ensure compatibility, interoperability, and performance within the shafts and rudders onboard multiple classes of USCG cutter boats. These components are designed and engineered using proprietary technical data held exclusively by the OEM.
Full details of the required components are outlined in the "Schedule of Supplies."
Under this type of contract, no work shall be performed until directed by an Order.
Electronic mail is an acceptable form of transmission for all orders, modifications, and correspondence issued under this contract.
No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation either before or after the opening/closing date.
The USCG currently contracts for overhauling the shafts and seals installed on multi classes of cutters. This onboard maintenance is performed by skilled technicians capable of performing shaft and seal overhauls using genuine DMS parts. All parts will have specific OEM specifications that will be utilized during the overhaul process of the engines. It is important to note that only DMS or its authorized distributors have the capability to supply the necessary parts for this project.
NOTE: NO SUBSTITUTE OR ALTERNATE PARTS WILL BE CONSIDERED. ONLY
NEW PARTS WILL BE ACCEPTED. NO DRAWINGS, SPECIFICATIONS OR
SCHEMATICS ARE AVAILABLE FROM THIS AGENCY.
End of Section C
SECTION D: PACKAGING AND MARKING: See: Attachment Statement of Work under Section J
End of Section D
SECTION E: INSPECTION AND ACCEPTANCE: See Section I “FAR 52.212-4 Terms and Conditions – Commercial Products and Commercial Services, applies to this acquisition and included the following Addenda”
End of Section E
SECTION F: DELIVERIES OR PERFORMANCE: See PART II Section I “FAR 52.212-1 Instruction to Offerors – Commercial Products and Commercial Services inserted by reference.
FAR 52.212-1 Instruction to Offerors – Commercial Products and Commercial Services (Addenda)
PLACE OF DELIVERY – DESTINATION:
Upon issuance of the delivery order, all items shall be shipped F.O.B. Destination in accordance with FAR Clause 52.247-34 F.o.b. Destination.
(a) USCG requires delivery of all items within 180 days of delivery order. All items will be delivered to:
USCG Surface Forces Logistics Center (SFLC) Receiving Room, Bldg 88 2401 Hawkins Point Road Baltimore, MD 21226-5000 **All deliveries are to be made Monday through Friday between the hours of 7:00 A.M.
and 1:00 P.M., EST. **
End of Section F
SECTION G: CONTRACT ADMINISTRATION DATA:
This Requirements type contract will be in effect from the date of the award until five years thereafter. The period of performance for the contract will consist of five (5) ordering periods with the first commencing 02 March 2026 through 01 March 2031.
Ordering Period 1 02 March 2026 – 01 March 2027 Ordering Period 2 02 March 2027 – 01 March 2028 Ordering Period 3 02 March 2028 – 01 March 2029 Ordering Period 4 02 March 2029 – 01 March 2030 Ordering Period 5 02 March 2030 – 01 March 2031
CONTRACTING OFFICER’S AUTHORITY
No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority, and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
GOVERNMENT REPRESENTATIVES
a. The Government may upon contract award or thereafter name representatives with titles such as Project Officer, Contracting Officer’s Representative (COR), Resident Inspector, and so on. Such individuals, if appointed, will be named in writing by the Contracting
Officer. The letter of appointment will indicate the individuals, titles, and stipulate rights, responsibilities, and limitations of their appointment.
b. In any event, no such named individual has the authority to issue any direction under this either technical or otherwise, which constitutes a change to the terms, conditions, price, or delivery schedule of the Contract. ONLY the Contracting Officer is authorized to alter the Contract in any manner.
c.
UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT PERSONNEL
A. The Contractor shall not accept any instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer or the Contracting Officer’s Representative acting within the limits of his/her authority. A Contracting Officer’s Representative shall be designated in writing to the Contractor and shall set forth the scope of their authority.
B. No information, other than that which may be contained in an authorized amendment to this purchase instrument duly issued by the Contracting Officer, which may be received from any person employed by the Government or otherwise will be considered as grounds for deviation from any stipulations of the purchase instruments or referenced drawings, specifications, or Statement of Work contained herein.
1.) The Contracting Officer hereby designates the following individual as the primary Contracting Officer’s Representative (COR) for this contract: Alan Randolph
2.) The COR will act as the Contracting Officer’s representative for technical matters (only), providing technical direction and discussion as necessary with respect to the performance work statement, monitoring the progress and quality of the contractor performance. The COR is not a Contracting Officer and does not have authority to take any action, either directly or indirectly, that would change pricing, quantity, quality, place of performance, delivery schedule, personal services, or any other terms and conditions of the contract, or to direct the accomplishment of effort which goes beyond the scope of the performance work statement in the contract.
3.) It is emphasized that only a Contracting Officer has the authority to modify the terms of the contract, therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other
4.) person effective or binding on the Government. When/if, in the opinion of the contractor, an effort outside the existing scope of the contract is requested, the contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the contractor (under such direction) unless the Contracting Officer has issued a contractual change or otherwise resolved the issue.
FAR 52.204-91 CONTRACTOR IDENTIFICATION. (NOV 2025)
As prescribed in 4.208(c)(2), insert the following clause:
Contractor Identification (Deviation Date)
Definitions. As used in this clause—
Commercial and Government Entity code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location (referred to as “CAGE code”); or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA CAGE Branch records and maintains in the CAGE master file (referred to as “NCAGE code”).
Unique entity identifier means an identifier used to identify a specific commercial, nonprofit, or Government entity.
(b) Unique entity identifier (UEI). The Contractor shall ensure that its UEI is maintained throughout the life of the contract.
(c) Commercial and Government Entity (CAGE) code. The Contractor shall ensure that the CAGE code is maintained throughout the life of the contract. The Contractor shall request changes to a CAGE code as indicated in the following table.
If the Contractor is… Then…
Registered in the System for Award Management (SAM) Initiate the change by updating its SAM registration
Located in the United States or its outlying areas and is not registered in SAM Submit a change request to the DLA CAGE Branch via https://cage.dla.mil
Located outside the United States and its outlying areas and is not registered in SAM
Request a change by contacting the appropriate National Codification Bureau ( https://www.nato.int/structur/ac/135/about/contacts) or NSPA ( https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx) https://cage.dla.mil/ https://www.nato.int/structur/ac/135/about/contacts https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx
(d) Communicating changes. The Contractor shall communicate any change to its UEI or CAGE code to the Contracting Officer within 30 days after the change, so a modification can be issued to update the UEI or CAGE code on this contract. A change in the UEI does not necessarily require a novation.
(End of clause)
52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEPT 2019)
(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract. OPAP@uscg.mil and the Contracting Officer at mark.cap@uscg.mil
(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).
(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.
(End of clause)
FAR 52.235-25 PROMPT PAYMENT (JAN 217)
Notwithstanding any other payment clause in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer (EFT). Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(4) of this clause concerning payments due on Saturdays, Sundays, and legal holidays.)
(a) Invoice payments-
(1) Due date.
(i) Except as indicated in paragraphs (a)(2) and (c) of this clause, the due date for making invoice payments by the designated payment office is the later of the following two events:
(A) The 30th day after the designated billing office receives a proper invoice from the Contractor (except as provided in paragraph (a)(1)(ii) of this clause).
mailto:mark.cap@uscg.mil https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/32.001#FAR_32_001 https://www.acquisition.gov/far/32.902#FAR_32_902
(B) The 30th day after Government acceptance of supplies delivered or services performed. For a final invoice, when the payment amount is subject to contract settlement actions, acceptance is deemed to occur on the effective date of the contract settlement.
(ii) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor’s invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(2) Certain food products and other payments.
(i) Due dates on Contractor invoices for meat, meat food products, or fish; perishable agricultural commodities; and dairy products, edible fats or oils, and food products prepared from edible fats or oils are-
(A) For meat or meat food products, as defined in section 2(a)(3) of the Packers and Stockyard Act of1921 ( 7 U.S.C. 182(3)), and as further defined in Pub.L.98-181, including any edible fresh or frozen poultry meat, any perishable poultry meat food product, fresh eggs, and any perishable egg product, as close as possible to, but not later than, the 7th day after product delivery.
(B) For fresh or frozen fish, as defined in section 204(3) of the Fish and Seafood Promotion Act of1986 ( 16 U.S.C. 4003(3)), as close as possible to, but not later than, the 7th day after product delivery.
(C) For perishable agricultural commodities, as defined in section 1(4) of the Perishable Agricultural Commodities Act of1930 ( 7 U.S.C. 499a(4)), as close as possible to, but not later than, the 10th day after product delivery, unless another date is specified in the contract.
(D) For dairy products, as defined in section 111(e) of the Dairy Production Stabilization Act of1983 ( 7 U.S.C. 4502(e)), edible fats or oils, and food products prepared from edible fats or oils, as close as possible to, but not later than, the 10th day after the date on which a proper invoice has been received. Liquid milk, cheese, certain processed cheese products, butter, yogurt, ice cream, mayonnaise, salad dressings, and other similar products, fall within this classification.
Nothing in the Act limits this classification to refrigerated products. When questions arise regarding the proper classification of a specific product, prevailing industry practices will be followed in specifying a contract payment due date. The burden of proof that a classification of a specific product is, in fact, prevailing industry practice is upon the Contractor making the representation.
(ii) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the due date will be as specified in the contract.
(3) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(3)(i) through (a)(3)(x) of this clause. If the invoice does not comply with these http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section182(3)&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section4003(3)&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section499a&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section4502(e)&num=0&edition=prelim requirements, the designated billing office will return it within 7 days after receipt (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, dairy products, edible fats or oils, and food products prepared from edible fats or oils), with the reasons why it is not a proper invoice. The Government will consider untimely notification when computing any interest penalty owed the Contractor.
(i) Name and address of the Contractor.
(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of the mailing or transmission.)
(iii) Contract number or other authorization for supplies delivered or services performed (including order number and line-item number).
(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered, or services performed.
(v) Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.
(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).
(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.
(viii) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(ix) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(x) Any other information or documentation required by the contract (e.g., evidence of shipment).
https://www.acquisition.gov/far/52.232-38#FAR_52_232_38 https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34
(4) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(4)(i) through (a)(4)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.
(i) The designated billing office received a proper invoice.
(ii) The Government processed a receiving report or other Government documentation authorizing payment, and there was no disagreement over quantity, quality, or Contractor compliance with any contract term or condition.
(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR Part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7 thday (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The prompt payment regulations at 5 CFR1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.
(6) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5 CFR Part 1315.
(7) Additional interest penalty.
https://www.acquisition.gov/far/52.233-1#FAR_52_233_1
(i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at 5 CFR Part 1315 in addition to the interest penalty amount only if-
(A) The Government owes an interest penalty of $1 or more;
(B) The designated payment office does not pay the interest penalty within 10 days after the date the invoice amount is paid; and
(C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph (a)(7)(ii) of this clause, postmarked not later than 40 days after the invoice amount is paid.
(ii)
(A) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not request any additional data. The Contractor shall-
(1) Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment interest penalty and such additional penalty as may be required;
(2) Attach a copy of the invoice on which the unpaid late payment interest is due; and
(3) State that payment of the principal has been received, including the date of receipt.
(B) If there is no postmark or the postmark is illegible-
(1) The designated payment office that receives the demand will annotate it with the date of receipt, provided the demand is received on or before the 40th day after payment was made; or
(2) If the designated payment office fails to make the required annotation, the Government will determine the demand’s validity based on the date the Contractor has placed on the demand, provided such date is no later than the 40th day after payment was made.
(iii) The additional penalty does not apply to payments regulated by other Government regulations (e.g., payments under utility contracts subject to tariffs and regulation).
(b) Contract financing payment. If this contract provides for contract financing, the Government will make contract financing payments in accordance with the applicable contract financing clause.
(c) Fast payment procedure due dates. If this contract contains the clause at 52.213-1, Fast Payment Procedure, payments will be made within 15 days after the date of receipt of the invoice.
https://www.acquisition.gov/far/52.213-1#FAR_52_213_1
(d) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(1) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(i) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(ii) Affected contract number and delivery order number if applicable;
(iii) Affected line item or subline item, if applicable; and
(iv) Contractor point of contact.
(2) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(End of clause)
End of Section G SECTION H: SPECIAL CONTRACT REQUIREMENTS(Not Applicable)
End of Section H End of Part I
PART II-CONTRACT CLAUSES.
SECTION I: CONTRACT CLAUSES
Clauses incorporated by reference
52.209-7 Information Regarding Responsibility Matters (NOV 2025)
52.225-18 Place of Manufacture (AUG 2018)
FAR 52.202-1 DEFINITIONS (JUN 2020)
FAR 52.203-3 GRATUITIES (APR 1984)
FAR 52.203-6 Alt 1 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (JUN 2020) ALTERNATE I (NOV 2021)
FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (JUN 2020)
FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2025) (DEVIATION 25-27)
FAR 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)
FAR 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES
(NOV 2025) (DEVIATION 26-10)
FAR 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND
EQUIPMENT. (NOV 2025) DEVIATION 26-10
FAR 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (MAY 2024)
FAR 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
FAR 52.232-1 PAYMENTS (APR 1984)
FAR 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
FAR 52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE (AUG 1996)
FAR 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
FAR 52.247-34 F.O.B DESTINATION (NOV 1991)
FAR 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
HSAR 3052.242-72 CONTRACTING OFFICER’S RESENTATIVE (DEC 20013)
FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (APRIL 2024)
(DHS-USCG DEVIATION 14-01, REVISION 1)
(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies established at 10 U.S.C. 4701 and Homeland Security Acquisition Regulation (HSAR) 3.900 (DEVIATION) through 3.905 (DEVIATION).
(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 10 U.S.C. 4701, as described in HSAR 3.900 (DEVIATION) through 3.905 (DEVIATION).
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts.
(End of clause)
FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS. (AUG 2025) (DEVIATION 25-19) (effective November 28, 2025)
(a) Definitions. As used in this clause:
Executive means officers, managing partners, or any other employees in management positions.
First-tier subcontract means a subcontract awarded directly by the Contractor to acquire supplies or services (including construction) for performing a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a contractor's general and administrative expenses or indirect costs.
Month of award means the month in which the Contracting Officer signs a contract or the month in which the Contractor signs a first-tier subcontract.
Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the information described at 17 CFR 229.402(c)(2).
(b) Requirement. Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public; therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.
Nothing in this clause requires disclosing classified information.
(c) Reporting. Unless otherwise directed by the Contracting Officer, or as provided in paragraph
(f) of this clause, the Contractor shall report the following in the System for Award Management at https://www.sam.gov as follows:
(1) Executive compensation of the prime contractor. The Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—
(i) In the Contractor's preceding fiscal year, the Contractor received—
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see http://www.sam.gov/ the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).
(2) First-tier subcontract information. The Contractor shall report the following information by the end of the month following the month of award of each first-tier subcontract award:
(i) Unique entity identifier for the subcontractor receiving the award and for the subcontractor's ultimate parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(iii) Amount of the subcontract award.
(iv) Date of the subcontract award.
(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract
(vi) The subcontract number assigned by the Prime Contractor
(vii) Subcontractor's physical address.
(viii) Subcontractor's primary performance location.
(ix) The prime contract number, and order number if applicable.
(x) Awarding agency name and code.
(xi) Funding agency name and code.
(xii) Government contracting office code.
(xiii) The applicable North American Industry Classification System code.
(3) Executive compensation of the first-tier subcontractor. The Contractor shall report by the end of the month following the month of award of a first-tier subcontract award and annually thereafter (calculated from the prime contract award date) the names and total compensation of each of the five most highly compensated executives for that subcontractor in the subcontractor's preceding completed fiscal year, if—
(i) In the subcontractor's preceding fiscal year, the subcontractor received-
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements;
and other forms of Federal financial assistance; and
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986 (see http://www.sec.gov/answers/execomp.htm).
(d) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of http://www.sec.gov/answers/execomp.htm.)
http://www.sec.gov/answers/execomp.htm)
1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986 (see http://www.sec.gov/answers/execomp.htm).
(e) Duration. Continued reporting on first-tier subcontracts is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after a first-tier subcontract expires.
(f) Exceptions.
(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.
(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.
(g) Prepopulated data. The Subcontract Reports in SAM will prepopulate with some information from SAM and the Federal Procurement Data System (FPDS). If the FPDS information is incorrect, the Contractor should notify the Contracting Officer. If the SAM information is incorrect, the Contractor is responsible for correcting this information
(End of clause)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (AUG 2025)
(DEVIATION 25-19) (effective November 28, 2025)
(a) Definitions. As used in this clause—
Commercial and Government Entity code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location (referred to as "CAGE code"); or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency to entities located outside the United States and its outlying areas that the DLA CAGE Branch records and maintains in the CAGE master file (referred to as "NCAGE code").
Unique Entity Identifier (UEI)means an identifier used to identify a specific commercial, nonprofit, or Government entity.
(b) Active registration.
(1) The Contractor shall maintain an active Federal Government contracts registration in the System for Award Management (SAM) at https://www.sam.gov during contract performance and through final payment under this contract. To maintain an active registration in SAM, the Contractor shall review at least http://www.sec.gov/answers/execomp.htm) http://www.sam.gov/ annually its registration in SAM and validate that the information is current, accurate, and complete.
(2) The Contractor is responsible for the currency, accuracy, and completeness of the information provided within SAM, and for any liability resulting from the Government's reliance on inaccurate or incomplete information. Updating SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(c) Novation and change-of-name agreements.
(1) If the Contractor has legally changed its business name or "doing business as" name (whichever is shown on the contract), or has transferred the assets used to perform the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in part 42 of the Federal Acquisition Regulation (FAR), the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to —
(i) Change the legal business name in SAM;
(ii) Comply with the requirements of FAR part 42; and
(iii) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with its written notification sufficient documentation to support the legally changed name.
(2) If the Contractor fails to comply with the requirements of paragraph (c)(1) of this clause, or fails to perform the agreement at paragraph (c)(1)(iii) of this clause, and, in the absence of a properly executed novation or change-of- name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(d) Assignees.
(1) The Contractor shall not change the legal business name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR part 32). Assignees shall be separately registered in SAM.
(2) Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be incorrect information within the meaning of the "Suspension of Payment" paragraph of the EFT clause of this contract.
(e) Unique entity identifier (UEI). The Contractor shall ensure that its UEI is maintained throughout the life of the contract.
(f) Commercial and Government Entity (CAGE) code. The Contractor shall ensure that the CAGE code is maintained throughout the life of the contract. To update a CAGE code, the Contractor shall initiate the change by updating its SAM registration.
(g) Communicating changes. The Contractor shall communicate any change to its UEI or CAGE code to the Contracting Officer within 30 days after the change, so a modification can be issued to update the UEI or CAGE code on this contract. A change in the UEI does not necessarily require a novation.
(End of clause)
FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
End of clause
FAR 52.212-4 TERMS AND CONDITIONS – COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (AUG 2025) (DEVIATION 25-21, REV 1 – effective NOV 28, 2025) APPLIES TO THIS ACQUISITION.
Electronic Submission of Payment Requests (NESSS Awards):
(a) Definitions. As used in these instructions –
(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.
(b) The contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). The contractor will submit payment requests using the blank form in IPP.
(c) Information regarding IPP, including IPP Customer Support contact information, is available at https://www.ipp.gov or any successor site.
(d) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/ UEI number is the primary identifier in System for Award Management (SAM), formally known as Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2018)). Contractors are located and identified in SAM by their UEI number. Therefore, to facilitate payment, the UEI number shall be recorded on every invoice submitted to the U.S. Coast Guard.
All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.
Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.
Responsible Official(S) Who Can Receive Notification Of An Improper Invoice:
For use in the event your firm receives a contract as a result of this Solicitation, designate below the responsible official(s) who can receive notification of an improper invoice and answer any questions regarding the invoice.
NAME: ___________________________________________________
TITLE: ______________________________________________________
TELEPHONE: ________________________________________________
EMAIL: _____________________________________________________
Contract Administration USCG SFLC CPD2, 2401 Hawkins Point Rd., Baltimore, MD 21226-5000 will perform all contract administration.
Communications pertaining to contractual administrative matters shall be addressed to the Contracting Officer (KO) or Contract Specialist (KS) listed below. Changes in, or deviations from, the specification or terms and conditions of the contract shall not be changed without written modification to the contract as executed by a USCG SFLC CPD Contracting Officer.
Contracting Officer’s Representative (COR) A Government employee designated in writing by the Contracting Officer to act as a technical advisor for the Contracting Officer for services/items within the scope of the contract. The COR performs functions such as review and/or inspection and acceptance of supplies and services and of a technical nature. A designation letter will set forth the name of the COR and the authorities and limitations of the COR under the contract. This person does not have a warrant that provides conditions of a contract. Contracting Officer’s Representative: Alan K Randolph, email:
Alan.K.Randloph@uscg.mil .
(End of clause)
FAR 52.216-18 ORDERING (Aug 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such mailto:Alan.K.Randloph@uscg.mil orders may be issued from date of award through 60 months; thereafter providing all options are exercised.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $18.99, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess $620,000.00
(2) Any order for a combination of items in excess of $8,468,353.00 or
(3) A series of orders from the same ordering office within 30 calendar days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216- 21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 calendar days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-21 Requirements (NOV 2025) (Deviation 26-04) (effective November 28, 2025)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s ordering period; provided, that the Contractor shall not be required to make any deliveries under this contract after March 2, 2031.
(End of clause)
FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2025) (Deviation 26-03) (effective November 28, 2025)
(a) Definitions. As used in this contract—
HUBZone small business concern means a small business concern that meets the requirements described in 13 CFR 126.200, certified by the Small Business Administration (SBA) and designated by SBA as a HUBZone small business concern in the Small Business Search (SBS) and the System for Award Management (SAM).
Service-disabled veteran-owned small business (SDVOSB)…