This document is an Amendment (No. 0002) to a solicitation for repairs and maintenance of the CGC ALEX HALEY (WMEC 39), issued by the U.S. Coast Guard Surface Forces Logistics Command. The amendment addresses four key contractor questions, with notable changes including the deletion of Work Item 03 (Sewage Piping Renewal) from the original requirements. For Work Item 01 (Emergency Eductor Repair), the Coast Guard agreed with the contractor's recommendation to inspect, template, and fabricate a new eductor discharge spool, with the requirement that the contractor submit a CFR (Corrective/Findings Report) after initial inspection.

The solicitation provides additional logistical details, confirming that the vessel will be located at Pier 37 with available shoreties for sewage, potable water, and electrical power. Contractors are explicitly advised to use the revised Attachment 1 – Schedule of Items – Prices during offer submission, with a warning that failure to do so will result in the offer being considered non-responsive. The amendment emphasizes that all other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z085

SOLICITATION NO. 70Z08525QLREP020334, REPAIRS & MAINTENANCE OF CGC ALEX HALEY (WMEC 39)

USCG, SURFACE FORCES LOGISTICS COMMAND

CPD2-LREPL, BLDG. 55, 2ND FLOOR

COAST GUARD ALAMEDA BASE, ALAMEDA, CA 94501

SAME AS BLOCK 6

52000PR2500P020334

70Z08525QLREP020334

1 2

08/14/2025

08/05/2025

SOLICITATION NO. 70Z08525QLREP020334

REPAIRS & MAINTENANCE OF CGC ALEX HALEY (WMEC 39)

AMENDMENT NO. 0002

The purpose of this amendment is as follows:

a. The responses to the following Request for Clarifications are as follows:

QUESTION NO. 1: Work Item No. 3, Sewage Piping Renewal, paragraph 3.4 – Will the contractor be required to clean the VCHT system (Holding Tank and associated piping) prior to any hotwork, or can the repair work be physically isolated via blanking flanges?; and

QUESTION NO. 2: paragraph 3.3 and 3.4 – Will the Contractor be required to provide temporary facilities (portable restrooms and hand washing stations) during grey water and sewage piping repairs.

ANSWER TO BOTH QUESTIONS: Work Item 03, Sewage Piping Renew, is deleted from this requirement. Attachment 1 – Schedule of items – Prices has been revised as shown as an attachment to this amendment. Offerors are advised to utilize the Revised Attachment 1 – Schedule of Items – Prices during submission of their offer to this requirement. Failure to utilize the revised Attachment 1 will result for your offer to be considered non-responsive to the solicitation.

QUESTION NO. 3 - Which berth will Alex Haley be tied, will electrical power and potable water be available for contractor use. Will the sewage shore tie be connected to the ship?

ANSWER: Contractor needs to refer to SFLC Standard Specification 0000. The cutter has priority to shoreties and will be using sewage, PW, and electrical shoreties.

Sewage shoretie will be in use. Alex Haley will be along Pier 37 where shoreties will be available upon cutter usage. (NOTE: Due to the deletion of WI 03, the answer for this question applies only to WI 01 & WI 02 of this requirement.)

QUESTION NO. 4: Work Item No. 01, Emergency Eductor, Repair, paragraph 2, 3.3 and 4 - Contractor noted that based upon the photograph provided in section 4, the Eductor Discharge Spool is deteriorated beyond repair (thin-wall condition, heat-damaged base metal and areas of substandard welding. Contractor advises that pinhole repairs, if successful would not hold up serving as a pressure boundary for this equipment. Research (excerpts attached) indicates strong likelihood that the eductor jet is part of the three-way inlet valve. The specific model of the eductor is not identified in the references provided. The eductor discharge Chamber is a short flange x flanges conical section of piping. Section is removable. Contractor recommends inspection, templating and shop fabrication per sample (with NDT and strength and porosity testing).

SOLICITATION NO. 70Z08525QLREP020334

REPAIRS & MAINTENANCE OF CGC ALEX HALEY (WMEC 39)

AMENDMENT NO. 0002

ANSWER: CG agrees with the contractor’s recommendation of inspection, templating, and fabrication of new eductor discharge spool. Upon initial inspection, the contractor must submit a CFR with findings and recommendations for the fabrication of the new eductor discharge spool.

B. All other terms and conditions of the original solicitation will remain unchanged.

SF 30 - A0002 70Z08Q5LREP020334