ATTACHMENT 4. Cutter Work Hours.pdf
PDF 73 KB Posted
- Attached to
- Dock-Side (DS): USCGC WAESCHE FY24, FQ4
- Solicitation number
- 70Z08524QLREP0010
About this file
This document is an attachment to a federal contract opportunity, specifically related to work hours for a cutter (ship) repair contract. The attachment outlines the designated work hours for various types of work, including general work, hot work, fuel/oil/water transfers, and operation of major machinery. The work hours are specified as Monday-Saturday, with some variations for federal holidays. The contractor may request to work outside of the designated days/hours with advance notice to the Contracting Officer's Representative (COR).
The related federal contract opportunity is for dockside repairs to the United States Coast Guard Cutter (USCGC) WAESCHE (WMSL-751). The scope of work includes all ship maintenance, repair, and associated support work, to be specified via task order. The first task order's period of performance will be from 20 August 2024 through 07 November 2024, with the place of performance at the cutter's home port in Alameda, California. The solicitation number is 70Z08524QLREP0010, and the contract opportunity is being issued by the Department of Homeland Security's U.S. Coast Guard.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cutter Work Hours
Cutter work hours are as follows:
General work: Monday-Saturday, 0700-1500 Hot work: Monday-Saturday, 0800-1530 Transfers of fuel, oil, and/or water: Monday-Friday, 0700-1500 Operation of major machinery: Monday-Friday, 0700-1700 Federal holidays: 0700-1700
The Contractor may request to work outside of the above designated days/hours with advance notice to the COR.
File details come from the government source that posted it. Updated .