Attachment K- Clarification Requests Answers 01 May.pdf
PDF 123 KB Posted
- Attached to
- Dock-Side (DS): USCGC STONE FY24
- Solicitation number
- 70Z08524QLREP0009
About this file
This document contains questions and answers related to a federal contract opportunity for dockside repairs to the United States Coast Guard Cutter (USCGC) STONE (WMSL-758). The contract will be awarded through Solicitation 70Z08524QLREP0009 and has an ordering period from the date of award through October 22, 2024. The scope of work includes all ship maintenance, repair, and associated support work as required to repair the USCGC STONE, to be specified via task order. The place of performance will be at the cutter's home port in North Charleston, South Carolina. Relevant details include: work hours may be extended with proper notification, ballast water cannot be pumped overboard, American Welding Society (AWS) CuNi welders are accepted, and the contractor is responsible for procuring any materials not provided as government-furnished equipment. The document also provides clarification on the required surface preparation methods and the number of seal coats for certain work items.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification Requests
CGC STONE FY24 Dockside Repair
70Z08524QLREP00009
Specification Paragraph Reference: GENERIC
Question: Can work hours be extended with 24-48hrs prior notification, 48hrs notice on hotwork on weekends to ensure personnel are mobilized onboard
Coast Guard Response: Yes, work hours may be extended if proper notification is provided IAW with procedures outlined in the specification and agreed to at the arrival conference.
Question: Confirm that base power is reliable and accepted, no additional services are required for power for the vessel
Coast Guard Response: Please see SFLC Standard Specification 0000 paragraph 3.2.7 and SFLC Standard Specification 0450.
Question: Would it be possible for non-CPARs references to also have no page limit as is the case with C-PARs.
Coast Guard Response: Yes. If vendors want to submit non-CPARS, send the PPQ form to the customer that your company performed work for. Have that customer fill the PPQ form out and email it to Lavon Lewis and Mark Cap. Ensure that the customer annotates in their email that the PPQ is for your company for the Stone DS FY24 solicitation. This documentation needs to be received by NLT than 10 May 2024 at 1700 EST.
Question: Confirm index/contents page is not included in 10-page count
Coast Guard Response: An index or table of contents page will not count against the 10-page limit of the technical capability document submitted for Part 1 Volume 1 of the proposal.
Question:
If the closing date for solicitation is 5/10/24 at 1700 and the Ship check for solicitation is 5/16/24.
What is the last day to ship check this vessel since the date on the solicitation for the site visit is after the closing date?
Coast Guard Response:
The last day to ship check this vessel will be 5/3/24 by 1600 EST. This is reflected in solicitation Amendment 2.
Specification Paragraph Reference: WORK ITEM 1 – Sub Section 3.4
Question: Would it be acceptable to pump ballast water overboard or does it require external pump out?
Coast Guard Response: Ballast water cannot be pumped overboard at the pier. Per specification paragraph 3.4 of Work Item 1, “The Contractor must dispose of residual tank contents listed in Table 1 and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations.”
Specification Paragraph Reference: WORK ITEM 10
Question: Confirm if American Welding Society (AWS) CuNi welders are accepted
Coast Guard Response: Please see SFLC Standard Spec 0740 along with SLFC Standard Spec 0000 for Dockside Repairs.
Specification Paragraph Reference: Items 13 and 14
Question: Items 13 and 14 specify Federal Equipment Services is the Tech Rep. I just spoke with them, and they do not provide that service. Can you please let me know the contact information for the appropriate Tech Rep?
Coast Guard Response: Federal Equipment Co. (partner of Fairbanks Morse Defense) is the OEM for the capstan (model 4A0100) and the hangar door (model HH3000). Federal Equipment Co. has provided tech rep services in the past for these same work items. It is the vendor’s responsibility to coordinate services with the appropriate tech reps as designated per the specification.
Specification Paragraph Reference: WORK ITEM 17
Question: In terms of the SqFt, using table 1, 1-16-01-L Passageway as an example, is 10SqFt requiring repair and sealing? The note states resealing deck outside of Armory door; would this be a greater area for resealing?
Or is the 10SqFt the area for total re-sealing? 3.2 states 5% will require repairs will be on the 10SqFt so 0.5SqFt of repairs required?
Coast Guard Response: The areas listed in the column of Table 1 of Work Item 17 titled “Total Compartment SQ FT” are the areas that require resealing in each compartment. Per paragraph
3.1.9 of WI 17, the contractor must identify areas of the deck requiring repairs and document via CFR. For bidding purposes, the contractor should estimate that 5% of the total area in each compartment requires repair. Using 1-16-01-L PASSAGEWAY as an example, the total compartment area (10SqFt) requires resealing and .5 SqFt of that 10SqFt will require repairs.
Specification Paragraph Reference: WORK ITEM 18
Question: As not flight deck, can you confirm if steel shot can be used?
Coast Guard Response: Acceptable surface preparation methods are listed in SFLC Standard Specification 6310 Appendix A for Weather Decks (Weather Deck Non-Skid, MIL-SPEC Coating for Steel).
Specification Paragraph Reference: WORK ITEM 20
Question: Please can you confirm as per Std Spec 6341; manufactures recommendation of 2 seal coat is required
Coast Guard Response: Confirm that 2 seal coats are required as per manufacturer’s recommendation.
Specification Paragraph Reference: WORK ITEM 22
Question: Please can you confirm all required material for project is GFP, and no material has been missed off apart from pipe
Coast Guard Response: Not all of the needed materials are included in GFE table, only the items that were available through CG inventory or had significantly long lead times. Materials such as pipe and other consumables such as gas and welding rods are not included. It is the contractor’s responsibility to ensure that all materials necessary for the completion of work that are not provided as GFE are procured in accordance with the specification and drawings.