CGC VISE and BARGE FY24 DS - RFC questions and answers (1).pdf

PDF 89 KB Posted

Attached to
USCGC VISE (WLIC 75305) & USCG 68A BARGE (68012) FY24 Dockside (DS)
Solicitation number
70Z08524QIBCT0002
Issued by

About this file

This document contains questions and answers regarding work items in solicitation 70Z08524QIBCT0002 for dockside maintenance and repair of USCGC VISE and USCG 68A BARGE. The solicitation involves work items such as inspecting and repairing a Way Wolf boiler model H-431-5 size 2128-8C, inspecting and servicing a CG 300 Oceanmaster Marine Crane boom, and renewing standard perforated steel overhead paneling with insulation. Honeycomb paneling cannot be used. Lead abatement and dust cleaning will be covered by exercising optional work items 17 and 18 if needed for work items involving lead or asbestos. The solicitation is issued by the Department of Homeland Security US Coast Guard for dockside maintenance and repair of the specified vessels.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CGC VISE & BARGE FY24 DS

Solicitation 70Z08524QIBCT0002 Amendment 0001

Request for Clarification Questions & Answers

1. WI 032 Boiler, Inspect and Repair paragraph 3.1.2, Can you provide the boiler make and model? The specification indicates to have a Qualified Technical Representative but there are no drawings or information included in the work specification as to the brand of the unit.?

Answer: Boiler make: Way Wolf and model: H-431-5 size 2128-8C

2. WI 006 Boat Boom, Inspect and Service - Tender paragraph 3.2, Is there a tech manual available for the boat boom? Do you have any additional information regarding the make and model of this unit?

Answer: Boom is a CG 300 Oceanmaster Marine Crane. TP 1952_589_A

3. WI 028 False Overhead Paneling, Renew. paragraph 3.3 Is there a drawing that shows what the material is that will need to be replaced? The work item mentions install new overhead insulation. Is this the only material or is there a drop ceiling that needs to be replaced as well?

Answer: The overhead is the standard perforated steel with insulation behind, it is the same for the bulk heads and overhead.

4. Work Item 028 False Overhead Paneling, Renew - For this line item there aren’t any materials listed in the drawing i.e., material made of inner structure or manufacturer.

Can we use a CG approved honeycomb paneling? The panels are used on the 87s, FRC’s and the 270.

Answer: No, they are not the same material. The overhead is the standard perforated steel with insulation behind, it is the same for the bulk heads and overhead.

5. Is the contractor to include cost of Lead Abatement and Lead Dust Cleaning in price of any Work Item where contractor is warned of the presence of Lead or Asbestos

(ie…Work Item 32)? Or will these costs be covered by exercising Optional Work

Items 17 & 18?

Answer: If lead abatement is need yes we will activate Work Item 17 and 18.