70Z08523RLREP0285 Attach (1) Price Schedule REV1.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Solicitation Notice : USCGC STRATTON Fiscal Year (FY) 2024 Dockside (DS)
Solicitation number
70Z08523RLREP0285
Issued by

About this file

This document contains a solicitation notice and pricing sheet for repair work on the USCGC STRATTON. The United States Coast Guard Surface Forces Logistics Center is seeking proposals for accomplishing dockside repairs to the USCGC STRATTON during Fiscal Year 2024 at a facility in Alameda, California. The procurement is set aside for certified HUBZone small businesses. The pricing sheet includes 19 contract line items for tasks such as inspecting and testing tanks, circuit breakers, fire prevention equipment, and various repair and preservation work. An additional contract line item is provided for miscellaneous work to be ordered via change requests using composite labor and material/subcontractor markup rates. The total estimated contract value is $350,118.96. The period of performance for the first task order is expected to be from April 26, 2024 to July 9, 2024. Proposals are due by January 24, 2024 and it is anticipated that award will be made on or around March 25, 2024.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Pricing Sheet

70Z08523RLREP0285 Attachment 1, Price Schedule REV1
Contract Line Item Number (CLIN)CLIN DescriptionEstimated QuantityUNIT*
UNIT PRICEAMOUNT
001Tanks (MP Fuel Service), Clean and Inspect1JB$ - 0$ - 0
002Circuit Breakers (Draw Out), Inspect and Test1JB$ - 0$ - 0
003Fire Prevention, Provide1JB$ - 0$ - 0
004Cargo Handling Elevator, Annual Inspection and Test, Perform1JB$ - 0$ - 0
005Gas Turbine Uptake Spaces, Preserve (Full)1JB
006Structure (Stack Interiors), Inspect and Repair1JB$ - 0$ - 0
007Stack Interiors, Preserve (Full)1JB$ - 0$ - 0
008Gas Turbine Exhaust Supports, Overhaul1JB$ - 0$ - 0
009Decks, Preserve (Full)1JB$ - 0$ - 0
010Tenting, Provide1JB$ - 0$ - 0
011Deck Covering (Slip-Resistant), Renew1JB$ - 0$ - 0
012Line Shaft Bearing Lip-Seal, Renew1JB$ - 0$ - 0
013Emergency Boat Retrieval Padeye, Install1JB$ - 0$ - 0
014Scullery Garbage Grinder Overboard Discharge, Modify1JB$ - 0$ - 0
015Helo Hangar Door, Inspect, Repair and Test1JB$ - 0$ - 0
016Helo Hangar Door Curtain Assembly, Preserve (100%)1JB$ - 0$ - 0
017Sea Water Piping (Folding Boom Cranes), Modify1JB$ - 0$ - 0
018Deck Covering (Slip-Resistant), Flight Deck Repair1JB$ - 0$ - 0
019Additional Work - Composite Labor Rate Unit Price: $___________

All inclusive mark-up/loading rate for materials and subcontractors: _____ %.

The lump sum amount entered for this item is an estimated amount. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.1LS$ 350,118.96
Estimated Total Contract Amount$ 350,118.96
*Unit Terms are as follows; JB = Job, LS = Lump Sum

70Z08522RP4500500 &"Times New Roman,Regular"Attachment 1, Price Schedule &"Times New Roman,Regular"Page 1 of &N

Sheet1

File details come from the government source that posted it. Updated .