70Z08523RLREP0002 Attach (1) Price Schedule of Supplies.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
FY23FQ4 Dockside Repairs of USCGC HAMILTON (WMSL 753)
Solicitation number
70Z08523RLREP0002
Issued by

View the file

Other files

File Type Posted
70Z08523RLREP0002A0003.pdf PDF
Justification and Approval_HAMILTON DS FQ4 FY23 Rev1_Redacted.pdf PDF
70Z08523RLREP0002A0002.pdf PDF
70Z08523RLREP0002 Attach (2) Specifications (Rev-1).pdf PDF
70Z08523RLREP0002 Attach (3) Consolidated List of References_A0001.pdf PDF
70Z08523RLREP0002 Attach (2) Specifications (Rev-2).pdf PDF
70Z08523RLREP0002 Solicitation.pdf PDF
70Z08523RLREP0002A0001_Solicitation.pdf PDF
70Z08523RLREP0002 Attach (3) Consolidated List of References.pdf PDF
USCGC Hamilton RFC 002.pdf PDF
70Z08523RLREP0002 Attach (3) Consolidated List of References_A0001.pdf PDF
70Z08523RLREP0002A0001 SF 30.pdf PDF
USCGC Hamilton RFC 001.pdf PDF
70Z08523RLREP0002 Attach (2) Specifications (Rev-2).pdf PDF
70Z08523RLREP0002A0001_Solicitation .pdf PDF
70Z08523RLREP0002 Solicitation.pdf PDF
70Z08523RLREP0002 Attach (6) Government Property Report.pdf PDF
70Z08523RLREP0002 Attach (4) Past Performance Information Form.docx DOCX document
Justification and Approval Redacted_Redacted.pdf PDF
70Z08523RLREP0002 Attach (8) FLETC Base Access and Pier Lay Down.pdf PDF
70Z08523RLREP0002 Attach (9) Pier_PAPA_Load_Restriction_Clarification.pdf PDF
70Z08523RLREP0002 Attach (5) Request for Clarification.docx DOCX document
70Z08523RLREP0002 Attach (2) Specifications (Rev-1).pdf PDF
70Z08523RLREP0002 Attach (3) Consolidated List of References.pdf PDF
70Z08523RLREP0002 Attach (7) DHS Form 11000-6 Non-Disclosure Agreement.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Pricing Sheet

Contract Line Item Number (CLIN)CLIN DescriptionEstimated QuantityUNIT*
UNIT PRICEAMOUNT
001Fire Prevention, Provide1JB$ - 0$ - 0
002Tanks (Aviation Fuel Service), Clean and Inspect1JB$ - 0$ - 0
003Tanks (Aviation Fuel Service), Preserve (Partial)
003A3-68-6-J1JB$ - 0$ - 0
003B3-68-8-J1JB$ - 0$ - 0
004Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect1JB$ - 0$ - 0
005Tanks (Aviation Fuel Stowage and Overflow), Preserve (Partial)
005A4-70-2-J1JB$ - 0$ - 0
005B4-67-2-J1JB$ - 0$ - 0
005C5-70-0-J1JB$ - 0$ - 0
006Tanks (MP Fuel Storage and Overflow), Clean and Inspect1JB$ - 0$ - 0
007Tanks (MP Fuel Overflow), Preserve (Partial)
007A5-32-1-F1JB$ - 0$ - 0
007B5-32-2-F1JB$ - 0$ - 0
007C3-50-2-F1JB$ - 0$ - 0
008Tanks (Ballast), Clean and Inspect1JB$ - 0$ - 0
009Air Conditioning Plants, Groom1JB$ - 0$ - 0
0010Refrigeration Plant, System Groom1JB$ - 0$ - 0
0011Refrigeration Plant Flexible Hoses, Renew1JB$ - 0$ - 0
0012Compressed Air Receivers, Clean, Inspect and Test1JB$ - 0$ - 0
0013Cargo Handling Elevator, Inspect and Repair1JB$ - 0$ - 0
0014Anchor Windlass Flexible Hoses, Renew1JB$ - 0$ - 0
0015Anchor Windlass Level 2, Inspect and Repair1JB$ - 0$ - 0
0016Forward and Aft Capstans, Level 2 Overhaul1JB$ - 0$ - 0
0017Dual Point Davit ,Biennial Maintenance, Perform1JB$ - 0$ - 0
0018Deck Covering (Polymeric), Repair and Seal1JB$ - 0$ - 0
0019Bulkhead and/or Overhead Insulation, Renew1JB$ - 0$ - 0
0020RQAWTS 12 D (1-93-1 and 1-93-2), Renew1JB$ - 0$ - 0
0021Ventilation Ducting, Renew1JB$ - 0$ - 0
0022Decks, Preserve (Full)1JB$ - 0$ - 0
0023Fantail Kick Pipes and Stuffing Tubes, Renew1JB$ - 0$ - 0
0024Vertical Ladder (Navigation Light Pole), Renew1JB$ - 0$ - 0
0025Chilled Water System Insulation, Renew1JB$ - 0$ - 0
0026Temporary Services, Provide1JB$ - 0$ - 0
027Additional Work - Composite Labor Rate Unit Price: $______ ; Quantity: 2,000; Unit of Issue: Hour; Extended Price: [2,000 X hourly rate quoted] $____________ .

All inclusive mark-up/loading rate for materials and subcontractors: _____ %. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Extended Price: [$100,000.00 X ( 1 + percentage quoted)]: $___________ .

The lump sum amount to be entered for this item is the combined extended prices for composite labor and percentage markup for materials and subcontractors. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.1LS$ - 0$ - 0
Estimated Total Contract Amount$ - 0
*Unit Terms are as follows; JB = Job, LS = Lump Sum

70Z08522RP4500500 &"Times New Roman,Regular"Attachment 1, Price Schedule &"Times New Roman,Regular"Page 1 of &N

Sheet1