DRAFT Schedule of Supplies_IPP Bridge Contract_Rev 1.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Intent to Sole Source for Integrated Power Plant Support Services for the CGC Healy
Solicitation number
70Z08522RP4505200
Issued by

About this file

This document provides a draft performance work statement, schedule of supplies/services, and notice of intent to sole source for integrated power plant support services on the Coast Guard Cutter Healy. The United States Coast Guard intends to solicit on a sole source basis from GE Energy Power Conversion USA Inc. for maintenance and support of integrated propulsion plant systems and equipment on the CGC Healy. GEPC is identified as the original equipment manufacturer of the integrated propulsion plant and holds proprietary data rights to provide required repair and support. The previous contract was awarded sole source to GEPC. Responses to the notice of intent are due within 10 days and must include documentation demonstrating technical capability to meet requirements, provide OEM-certified representatives, and access proprietary data. Failure to submit such documentation will result in a non-competitive sole source award to GEPC. The draft performance work statement and schedule of supplies/services are attached for reference.

View the file

Other files

File Type Posted
DRAFT PWS_IPP Bridge Contract_R1.docx DOCX document
Intent to Sole Source Healy.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Pricing Sheet

ITEM NO.SCHEDULE OF SUPPLIES/SERVICESEstimated QuantityUNIT*
UNIT PRICEAMOUNT
001Technical Support (PWS 5.1)12MO$ - 0
002Conditional Technical Support & Future Obsolescence Updates (PWS 5.2) - Estimated
1LS$ 1,200,000.00
003Shipboard GroomNSP
003AShipboard Pre-Groom Report (PWS 5.3.1)1JB$ - 0
003BShipboard Equipment Groom (PWS 5.3.2)1JB$ - 0
003CShipboard Groom - Network Workstation Service (5.3.2.1.10)1JB$ - 0
004Shoreside Groom (PWS 5.3.3)1JB$ - 0
005Storage of Equipment at Contractor's Facility (PWS 5.3.4)12MO$ - 0
006Configuration Management (PWS 5.4)12MO$ - 0
007Maintenance Procedure Cards (MPCs) Validation (PWS 5.6)1JB$ - 0
008Training (PWS 5.5)NSP
008AEngineering Diagnostic Workstation (EDW) Op & Maint1JB$ - 0
008BMachinery Plant Control & Monitoring System (MPCMS) Op & Maint, Part I1JB$ - 0
008CMachinery Plant Control & Monitoring System (MPCMS) Op & Maint, Part II1JB$ - 0
008DScience Winch Drives Op & Maint, Part I1JB$ - 0
008EScience Winch Drives Op & Maint, Part II1JB$ - 0
008FDynamic Positioning System (DPS) Equipment Op & Maint1JB$ - 0
008GMain Propulsion Cycloconverter Op & Maint, Part I1JB$ - 0
008HMain Propulsion Cycloconverter Op & Maint, Part II1JB$ - 0
008IContinuous Test and Evaluation System (CTES) Op & Maint1JB$ - 0
008JTravel Day Labor - GE Instructor12DA$ - 0
008KNon-training day - GE Instructor (PWS 5.5.5)52DA$ - 0
008LCentral Power Plant Operations**1JB$ - 0
008MPower Generation and Distribution System Fault Analysis**1JB$ - 0
008NCentral Power Plant Maintenance **1JB$ - 0
008OHigh Voltage Safety**1JB$ - 0
009Travel- All travel required by the Government outside the local commuting area(s) (50 miles) of Contractor Personnel Primary Work Place will be reimbursed to the Contractor in accordance with FAR 31.205-46. Permission shall be obtained from the KO if lodging rate exceeds maximum per diem. Travel authorized at individual task order level. Estimated. No to Exceed (NTE) per order.1LS$ 400,000.00
010Project Management (PWS 1.2.1.1)12MO$ - 0
Estimated Total Amount$ 1,600,000.00
*Unit Terms are as follows; JB = Job, LS = Lump Sum, DA = Day, MO= Month, NSP = Not Separately Priced ** All inclusive pricing that includes, but is not limited to, course, travel and non-training days.

&"Times New Roman,Regular"70Z08522RP4505200 &"Times New Roman,Regular"SCHEDULE OF SUPPLIES/SERVICES &"Times New Roman,Regular"Page 1 of &N

DRAFT

CLIN 002

Conditional Technical Support (PWS 5.2) (CLIN 002)Total Contract Estimated Hours 2022Hourly Rate for Contract 2022Total Contract Estimated Hours 2023Hourly Rate for Contract 2023
Loaded Wrap Rates (contains profit)
1Field Management/Senior Systems Specialist
2Systems Specialist Straight Time
3Systems Specialist Overtime
4Field Services and Commissioning Engr
5Drawing and Technical Support
6Manufacturing, Test and Repair
Mark-upsPercentage Rate for Contract
7Materials
8Subcontracts for Supplies and Incidental Services
9Profit
Program management and contracts management functions shall not be included as part of any contractors proposals under this IDIQ-Requirement.

&"Times New Roman,Regular" 70Z08522RP4505200 &"Times New Roman,Regular"SCHEDULE OF SUPPLIES/SERVICES &"Times New Roman,Regular"Page 1 of &N

DRAFT