Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AMENDMENT 0001
SUBJECT RFQ NO. 70Z08521QP4517900 USCGC BERTHOLF (WMSL 750) FQ3 FY 21 DOCKSIDE REPAIRS
The purpose of this Amendment is:
1. Response to Prospective Offerors questions (see attached pages 2 through 4)
UNITED STATES COAST GUARD
SURFACE FORCE LOGISITICS CENTER
CPD2 LRE, COAST GUARD ISLAND, BLDG 55
ALAMEDA, CA 94501-5000
SAME AS BLOCK #6
70Z08521QP4517900
1 3
02/19/2021
02/04/2021
Amendment No. 0001
BLOCK 14: DESCRIPTION OF AMENDMENT
Q1: The preservation items in the specification for solicitation 70Z08521QP4517900 are using verbiage that requires the coatings contractor to be QP-1 certified and supply a 3rd party coating tech rep.
Example: Item 24 paragraph 3.1.2.1 " Accomplish applicable requirements in SFLC Std Spec 0000, Paragraphs 3.2.4.2.1 (Painting contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep).
Is it the intent to just follow the requirements of SFLC STD SPEC 0000 Paragraphs 3.2.4.2 and either be QP-1... OR in LIEU OF.....supply a Coating Tech Rep?
A1: For all preservation work items with critically coated surfaces, (WI:6,9,13,15,21,23, 24,25,31,33,34), a third party NACE CIP Lvl 3 with Marine Specialty that satisfies SFLC Std Spec 0000, Paragraph 3.2.4.2.2 (Coating Tech Rep) is required. This is IN LEIU OF a QP-1 requirement. Disregard any verbiage requiring a QP-1 certified company as outlined in SFLC Std Spec 0000, Paragraph 3.2.4.2.1 (Painting contractor certification program requirements). The CG does not object to utilizing a QP-1 company on this contract, however a QP-1 company alone will not satisfy the requirements of this contract. A 3rd party NACE CIP Lvl 3 with Marine Specialty is required regardless of the qualifications of the preservation company, prime or sub-contractor.
Q2: Item 28 general welding. 3.1.5 says locations listed in tables 1 and 2. However there is no table 1 or 2 in spec. drawings are for uptake spaces. During ship check PE discussed this work item being associated with WI 23. Please clarify.
A2: Please bid according to the specification which does not reference welding in WI 23 Decks Preserve. WI 28 General Welding, Provide para 3.1.5 Work locations Tables 1 and 2 are missing. Tables 1 and 2 are the same as WI 27 Structure (Stack Interiors), Repair and Renew Tables 1 and 2.
Amendment No. 0001
Q3: Items 7, 12, 14 and 16. Can sewage riser be used for disposal of fluids. These tanks are non fuel/oily waste.
A3: All relevant tanks will be at low suction. For bidding purposes, please reference the associated WI with tables which reference the gallons remaining when a tank is at low suction.
All residual fluids remaining in the tank shall be handled as an interference IAW paragraph 3.1.4 Interferences- Fluid contents. Fluid contents include any fluid at or below low suction in addition to fluids generated through the cleaning process. No installed pump(s), piping, or tank(s) may be used to facilitate removal of residual fluid contents. Contractor is reminded of work coordination with Tanks (grey water and lift stations) Clean and Inspect, and Sewage Shore Tie, Modify.
The time and date set for receipt of proposal is extended to 25 February 2021 at 1:00 p.m. Pacific Time.