This is a combined synopsis and solicitation for commercial ship repair services. The Coast Guard is seeking quotes to perform various dockside repairs to the USCGC SANGAMON, a 65-foot river buoy tender, from July to September 2020 at its home port in East Peoria, Illinois. The requirement is set aside for small businesses. Quotes are due by March 16 with questions accepted until March 10. The solicitation will result in a firm fixed-price contract awarded under FAR Part 12 for commercial items and FAR Subpart 13.5 for simplified procedures. Repairs will be conducted per the specification in Attachment 2 of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 CGC SANGAMON.pdf | ||
| Attachment 3 Past Performance Information Form.doc | DOC document | |
| Combined Synopsis Sol dockside.doc | DOC document | |
| Request for Clarification doc.docx | DOCX document | |
| S1.1b SANGAMON (WLR 65B) DS FQ4 REO 20ER0_BLANK.xls | XLS spreadsheet | |
| OMBUDSMAN PROGRAM LETTER.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SANGAMON (WLR 65506)
USCG 100B BARGE (99005)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Robert E Ozment
(Rev-0, 14 January 2020)
USCGC SANGAMON (WLR-65B) DOCKSIDE AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics - Tender ................................................................................................................. x Principal Characteristics - Barge .................................................................................................................. xi General Requirements WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 3: Boiler Exhaust Stack Uptakes, Commercial Clean- Tender WORK ITEM 4: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -
Tender WORK ITEM 5: Hull Fittings (Mooring and Towing), Inspect and Test - Tender WORK ITEM 6: Spuds, Overhaul - Tender WORK ITEM 7: Spud Winch, Inspect & Service - Tender WORK ITEM 8: Sewage Holding Tank(s), Clean and Inspect - Tender WORK ITEM 9: Grey Water Piping, Clean And Flush WORK ITEM 10: Sewage Piping, Clean And Flush WORK ITEM 11: Boiler Exhaust Stack Uptakes, Commercial Clean- Barge WORK ITEM 12: Barge, Diesel Engine Exhaust Piping, Commercial Clean WORK ITEM 13: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -
Barge WORK ITEM 14: Spud Winches, Inspect & Service - Barge WORK ITEM 15: Hull Fittings (Mooring and Towing), Inspect and Test - Barge WORK ITEM 16: Capstan, Inspect and Service - Barge WORK ITEM 17: Head Wire Winch, Inspect & Service WORK ITEM 18: Spuds, Overhaul - Barge WORK ITEM 19: Boat Boom, Inspect and Service - Barge WORK ITEM 20: Buoy And Cargo Crane, Inspect And Service - Barge WORK ITEM 21: Potable Water Tank Sight Glass, Renewal (O) WORK ITEM 22: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 23: Watertight Hatch (External DC Deck and Below), Renew WORK ITEM 24: Windows, Repair WORK ITEM 25: Watertight Scuttle (External), Renew WORK ITEM 26: Stanchion Socket, Repair WORK ITEM 27: Capstan Wire Rope Guide Renew, Barge WORK ITEM 28: Deck Covering (Wet/Dry), Seal WORK ITEM 29: Upper Deck Bulwark Repair WORK ITEM 30: Stern Speaker Stuffing Tube, Replace (O) WORK ITEM 31: Pilothouse Top Unused Stuffing Tube, Remove (O) iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 100B CGB 103-1, Rev 1, Outboard Profile & Deck Arrangement
Coast Guard Drawing 100B CGB 2002-1, Rev 2, Small Boat Derrick
Coast Guard Drawing 100B CGB 2100-1, Rev 4, Hydraulic Piping
Coast Guard Drawing 100B CGB 2100-2, Rev -, Revisions to Hydraulic Piping Work W/ Dwg 100-B-
CGB-2100-1
Coast Guard Drawing 100B CGB 2100-3, Rev -, Hydraulic Piping Mods
Coast Guard Drawing 100B CGB 2602-001, Rev 3, Spud Well
Coast Guard Drawing 100B CGB 3801-2, Rev -, 100’ x 30’ x 7’ Barge Heating Boiler & Seven Modine
Heaters
Coast Guard Drawing 100B CGB 4000-1, Rev 3, Machinery Arrangement
Coast Guard Drawing 100B CGB 4103-1, Rev 3, Engine Cooling & Exhaust Piping & Weedicide System
Coast Guard Drawing 100B CGB 4103-6, Rev -, USCGB 99008 Engine Exhaust Piping Arrangement
(USE FOR CGB 99008 ONLY)
Coast Guard Drawing 100B CGB 4901-001, Rev 1, Compressed Air Piping Arrangement and Details
Coast Guard Drawing 100B-CGB 103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 100B-CGB 1101-1, Rev 3, Barge Plating & Bill of Material
Coast Guard Drawing 100B-CGB 1604-1, Rev A, Ladders, Rails, & Misc. Fittings
Coast Guard Drawing 130-CGB 581-1, Rev -, Warping Capstan Wire Rope Guide Installation
Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312 MDE
Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit IF 1312 MDE
Coast Guard Drawing 65B WD 4808-005, Rev -, Sanitary Drainage System (65506)
Coast Guard Drawing 65B WD 4810-005, Rev B, Exhaust Piping Mods to Suit IF 1312 MDE
Coast Guard Drawing 65B-WD 4804-1, Rev B, Fresh Water Sys
Coast Guard Drawing 65B-WD 4809-1, Rev -, Vents & Sounding Tubes
Coast Guard Drawing 65B-WD 103-002, Rev -, Gen Arrg Hold & DK Plans
Coast Guard Drawing 65B-WD 103-07, Rev C, Booklet of General Plans
Coast Guard Drawing 65B-WD 1101-02, Rev -, Hull Struct & Mn Dk Pln Bm Mods To Dk Plat
Coast Guard Drawing 65B-WD 1107-1, Rev -, Main Deckhouse & Upper Deck Plating
Coast Guard Drawing 65B-WD 1901-1, Rev -, Painting Insul Sheath and Deck Covering Sched v (Rev-0)
Coast Guard Drawing 65B-WD 4903-007, Rev B, Compressed Air System
Coast Guard Drawing 65B-WD-0103-1, Rev A, Class B, Inboard and Outboard Profile.
Coast Guard Drawing 65B-WD-0103-7, Rev D, Booklet of Plans
Coast Guard Drawing 65B-WD-1107-1, Rev , Main Deckhouse & Upper Deck Plating
Coast Guard Drawing 65B-WD-6502-2, Rev_, 65 FT. Towboat, I.C. Circuits Schematics.
Coast Guard Drawing 65-WD-1101-1, Rev 4, Hull Structural Details
Coast Guard Drawing 65B WD 4808-005, Rev -, Sanitary Drainage System (65506)
Coast Guard Drawing 65B WD 1201-1, Rev -, Bitts and Chocks
Coast Guard Drawing 65B WD 1201-3, Rev -, Barge and Tow Boat Integration System
Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details
Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual
Coast Guard Technical Publication (TP) 1505, SWBS 582, Section A, Capstan
Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air Winch
Model HU-40 Series
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install New
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard
Electrical Cable Test.
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation.
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
TP-3364
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2013, Drinking Water System
Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets vi (Rev-0)
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59588, 2005, Rubber Silicone
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-D-3134, Sep 1989, Deck Covering Materials
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning vii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
23 N 36” x 60” Flush
Watertight Hatch, Steel, Eight Dog, Long side
Hinge with 21” Flush
QAWT Scuttle
NSN:
PN:805-1624099
1 ea. $15,000
25 N 25 IN Diameter Quick-
Acting Watertight Flush
Scuttle, Steel, 3-Dog, (including associated coaming)
NSN:2040-00-554-6910
PN:805-1623057
1 ea.
$2,500.00
7 N Wire Rope 1/2-inch 6 x
37 x 100 Ft. EIPS-IWRC
RRL, w/poured open spelter socket on one end.
NSN 4010-01-644-9664 1 ea. $349.00
14 N Wire Rope 1/2-inch 6 x
36 x 75 Ft EIPS-IWRC
RRL Wire Rope, w/thimble eye socket on one end.
1/2-inch 6 x 36 EIPS-IWRC
RRL Wire Rope, 75 Feet w/thimble eye socket on one end.
1 ea. $400.00
17 N Wire Rope 1/2-inch 6 x
37 x 190 Ft EIPS-IWRC
RRL, w/poured open spelter socket on one end
NSN 4010-01-644-9928 1 ea. $455.00
19 N Wire Rope 5/16" 6 x 37 x
80 Ft.
w/ Crosby buttons ea.
End
Wire Rope 5/16" 6 x 37 x 80 Ft.
w/ Crosby buttons ea. End
2 ea. $351.20
20 N Wire Rope 3/4-inch 6 x
37 x 250 Ft EIPS-IWRC
RRL,
End-1: Poured open spelter socket
End-2: Double Seized
NSN:4010-01-647-1654 1 ea. $899.00
20 N Jib/ Main Boom Pin PN:28147 1 ea. $2,046.82
20 N Jib/ Main Boom Bushing PN:14199 2 ea. $1,205.88
20 N Jib Lift Cyl to Jib
Weldment Pin
PN:28148 3 ea. $1,594.71
20 N Sheave NSN:2040-01-F12-3043
PN:13624
2 ea.
20 N Sheave Bearing NSN:3110-01-269-9956
PN:10520
2 ea. $472.14
20 N Sheave Bearing Inner
Race
NSN:5365-01-269-9957
PN:10521
2 ea. $202.36
20 N Sheave Pin Assy PN:21805 2 ea. $1,137.04
20 N Pin Anti-2-Block SS PN:29110 1 ea. $1,535.32
20 N Rope Socket Pin PN:28150 1 ea. $283.42 viii (Rev-0)
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter ix (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
14 Spud Winches, Inspect & Service - Barge
16 Capstan, Inspect and Service - Barge
19 Boat Boom, Inspect and Service - Barge
20 Buoy And Cargo Crane, Inspect And Service - Barge
22 Deck Covering (Interior Wet/Dry), Renew x (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
65’ WLR (B-CLASS), SMALL BUOY RIVER TENDER
PHYSICAL
Length overall 65' 10"
Depth 7' 8"
Maximum beam 21' 0"
Frame spacing 1' 6"
Full load draft 5' 0 7/8" LCF Draft
Full load displacement 127.71 Long Tons Fresh Water
HULL
Hull material Steel
MACHINERY
Number of propellers 2
Number of blades 4
Diameter of propeller 48"
Pitch 40" fixed
RPM 410
Electrical Power 230VAC
TANK CAPACITIES
Fuel tanks 2010 Gals
Fresh water tanks 3,355 Gals
Lube oil 55 Gal xi (Rev-0)
PRINCIPAL CHARACTERISTICS - BARGE
100' CGB (A & B CLASS), BARGE
PHYSICAL
Length overall 100' 0"
Depth 7' 0"
Maximum beam 30' 0"
Full load draft 4' 0"
Full load displacement 287.39 Long Tons SW
Shore tie voltage requirements 230 Volts
1 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Conditionally
Exempt Small Quantity Generator EPA ID# IL5990307991.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
3 (Rev-0)
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
25901_0617_FLT
REC_25901_FLT_65' WLR 'B' Class (CGC SANGAMON) (0416)
WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine
(MDE) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312 MDE
Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit IF 1312
MDE
Coast Guard Drawing 65B WD 4810-005, Rev B, Exhaust Piping Mods to Suit IF 1312 MDE
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
12 (Rev-0)
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Access covers
Exhaust stack
MDE
Piping
Pipe insulation
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
3.2 Staging or scaffolding, netting. The Contractor shall erect suitable staging or scaffolding in accordance with 29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.
3.2.1 Rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.3 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving
Coast Guard approval of the plan.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
13 (Rev-0)
3.5 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 65B WD 1107-003, 65B WD 4000-004, and 65B WD 4810-
005, to a condition free from soot, tar, and any other foreign matter as follows:
3.5.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.5.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.5.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.5.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.6 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.6.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.7 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR
4. NOTES
14 (Rev-0)
25902_0617_FLT
REC_25902_FLT_65' WLR 'B' Class (CGC SANGAMON) (0416)
WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the port and starboard ship service ship service diesel generator (SSDG) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312 MDE
Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit IF 1312
MDE
Coast Guard Drawing 65B WD 4810-005, Rev B, Exhaust Piping Mods to Suit IF 1312 MDE
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
15 (Rev-0)
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Access covers
Exhaust stack
SSDG
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
3.2 Staging or scaffolding. The Contractor shall erect suitable staging or scaffolding in accordance with
29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.
3.3 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.3.1 Temporary safety railing. To promote safety, the Contractor shall limit existing safety railing removals to an area where new safety railing can be installed during the same workday. During periods when not actively working on new safety railing, secure any gaps between existing safety railing with a substantial temporary lifeline arrangement similar to that currently installed on the vessel. Remove and dispose of all temporary lifelines upon completion of work.
3.4 Work plan. The Contractor shall develop and submit to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the SSDG. The Contractor shall perform this work upon receiving
Coast Guard approval of the plan.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the exhaust piping system, to demonstrate existing operational condition. Submit a CFR.
16 (Rev-0)
3.6 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the SSDG, shown on Coast Guard Drawing(s) 65B WD 1107-003, 65B WD 4000-004, and 65B WD
4810-005, to a condition free from soot, tar, and any other foreign matter as follows:
3.6.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.6.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.6.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.6.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.7 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.7.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.8 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust piping system to be in satisfactory operating condition. Submit a CFR
This section is not applicable to this work item.
17 (Rev-0)
25903_0617_FLT
REC_25903_FLT_65' WLR 'B' Class (CGC SANGAMON) (0416)
WORK ITEM 3: Boiler Exhaust Stack Uptakes, Commercial Clean- Tender
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312 MDE
Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit IF 1312
MDE
Coast Guard Drawing 65B WD 4810-005, Rev B, Exhaust Piping Mods to Suit IF 1312 MDE
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
18 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Access covers.
Exhaust stack.
Boiler.
Exhaust pipe expansion joints.
Exhaust insulation blankets.
3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard
Personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) 65B WD 1107-003, 65B WD 4000-004, and 65B WD 4810-005, to a condition free from soot, tar, and any other foreign matter as follows:
3.3.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.3.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.3.3 Upon completion of cleaning, do the following:
3.3.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.
Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.3.3.2 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components;
submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
19 (Rev-0)
3.4.1 Following cleaning of the interior of each uptake, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of uptake has been satisfactorily cleaned according to the work plan.
3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std
Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.6 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the
Coast Guard Inspector, thoroughly test and prove of the exhaust stack system to be satisfactory operating condition. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
20 (Rev-0)
55100_0617_FLT
REC_55100_FLT_65 WLR ‘B’ Class (ALL) (0319)
WORK ITEM 4: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift - Tender
1. SCOPE
1.1 Intent. The work item describes the requirements for the Contractor to clean, inspect, lift test and hydrostatically test the below designated air receivers and system valves:
SERVICE DESIGNATION LOCATION QTY OPERATING
PRESSURE (psi)
Starting Air Starting Air 2-30-1 2 200
TYPE SIZE DESIGNATION QTY SET PRESSURE (psi)
Relief Valve ¾ inch RV 2 265
Relief Valve ¾ inch RV 2 265
Reducing Valve, B68G-
8AK-MR3-RLG
1 inch Reducing Valve 2 125
1.2 Government-furnished property.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65B-WD 4903-007, Rev B, Compressed Air System
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
21 (Rev-0)
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard
Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013
Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011
Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010
Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013
Edition, Bronze Gate, Globe, Angle and Check Valves
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Piping system.
Coast Guard personnel will operate all shipboard machinery and equipment.
22 (Rev-0)
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the compressed air system, to demonstrate existing operational condition. Submit a CFR.
3.2 Air receiver cleaning and inspection. The Contractor shall clean and inspect each designated air receiver in paragraph 1.1 (Intent) as follows.
3.2.1 Blowdown the air receivers and collect the blowdown (condensate) into a separate container for inspection.
3.2.2 Visually inspect…