175-WLM_TM4000.0.pdf
PDF 1 MB Posted
- Attached to
- USCGC JOSHUA APPLEBY DRY DOCK
- Solicitation number
- 70Z085-20-Q-P4503400
About this file
This is a combined synopsis and solicitation for dry dock repairs to the USCGC JOSHUA APPLEBY, a Coast Guard buoy tender. The contractor shall provide all necessary facilities, labor, materials, services, and equipment to perform various dry dock repairs to the cutter in accordance with the attached specifications. The scope of services includes ship repair and associated support work, and may include additional items not currently listed as definite. The contract type is firm fixed price. The period of performance is approximately February 18 to April 28, 2019 at the contractor's proposed dry dock facility. The cutter's homeport is Petersburg, FL. Questions regarding the solicitation are due by October 28, 2019 and quotations are due by October 31, 2019.
TCTO TM4000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| 3628_-_-.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003_CGC_JOSHUA_APPLEBY.pdf | ||
| Combined_Synopsis_Solicitation_amended_0003_JOSHUA_APPLEBY.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Combined_Synopsis_Solicitation_amended_0002_JOSHUA_APPLEBY.docx | DOCX document | |
| Amendment_0001.pdf | ||
| Combined_Synopsis_Solicitation_amended_0001_JOSHUA_APPLEBY.docx | DOCX document | |
| S1.1c_JOSHUA_APPLEBY_(WLM_175)_DS_FQ2_JCR_19R0_Rev0.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| Request_for_Clarification_doc.docx | DOCX document | |
| S1.1b_JOSHUA_APPLEBY_(WLM_175)_DD_FQ2_JCR_19ER0_BLANK_(002).xls | XLS spreadsheet | |
| J&A_redacted.pdf | ||
| Combined_Synopsis_Solicitation_JOSHUA_APPLEBY.docx | DOCX document | |
| OMBUDSMAN_PROGRAM_LETTER.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. COAST GUARD
COMPUTERIZED MAINTENANCE SYSTEM
WLM-175
TM4000.0
REV'D 01/15/19
ASSET NUMBER OPERATING ACTIVITY MAINTENANCE ACCOMPLISHED MAINTENANCE DUE
DATE ASSET HOURS DATE ASSET HOURS
MO DAY YEAR MO DAY YEAR
ZULU DATE ZULU HOURS
MO DAY YEAR
ITEM 1
DUE
CMS CODE ACTION DESCRIPTION CEINUM
TM4000 MODIFY THRUSTER QUICK DISCONNECTS L8-B000-001
X SCHEDULED X UNSCHEDULED
MAN HOURS: MK___.___DC___.___EM___.___ET___.___GM___.___BM___.___FN___.___SN___.___ME___.___ IT___.___OTHER___.___
REMARKS:
TECHNICIAN'S TECHNICIAN'S
SIGNATURE ID
* ASTERISK INDICATES QA REQUIRED * QA (1)
IMMEDIATE ATTENTION REQUIRED
TIME COMPLIANCE TECHNICAL ORDER
TCTO WLM-175-TM4000
THIS TECHNICAL ORDER IS APPLICABLE TO ALL COAST GUARD
COASTAL BOUY TENDERS WLM-175 CLASS CUTTER HULLS 551
THROUGH 564.
THIS TECHNICALORDERDIRECTSANDAUTHORIZES THEADDITIONOF
QUICK DISCONNECTS TO THE THRUSTER SAMPLING LINE AND THE
HEAD TANK TO FACILITATE FILTRATION OF THE LUBRICATION OIL IN
THE THRUSTER SYSTEM.
PRIVACY ACT STATEMENT
Authority: 44 U.S.C. 3101; 44 U.S.C. 3534; 5 U.S.C. §552a (e)(3); and Executive Order 9397.
Purpose: To account for scheduled and unscheduled maintenance performed on CG aircraft and surface assets.
Routine Uses: Authorized CG personnel will use this information to document scheduled and unscheduled maintenance, man-hours expended, and the technician responsible for tasks performed on CG aircraft and surface assets. Any external disclosures of data within this record will be made in accordance with DHS/ALL-004, General Information Technology Access Account Records, 77 Federal Register 70792, November 27, 2012.
Disclosure: Furnishing your Tech ID is voluntary; however, the inability to collect this information could result in untimely or incomplete Asset Computerized Maintenance System reports or the inability for the CG to make informed decisions regarding manpower analysis.
Distribution Statement D: Distribution authorized to the DHS/CG/DoD and their contractors Administrative/Operational use, 01/15/19. Other requests shall be referred to .
WARNING: This document contains technical data whose export is restricted by the Arms Export-Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5200.22-M, National Industrial Security Program Operating Manual, Section 5-705 or DoD 5200.1-R, Information Security Program Regulation, Chapter VI, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
REVIEWED LOG YN DATA WEIGHT AND BALANCE OFFICER'S UNIT DOCUMENT
BY ENTRY SIGNATURE NUMBER
COMPLETED
U.S. COAST GUARD
COMPUTERIZED MAINTENANCE SYSTEM
WLM-175
TM4000.0
REV'D 01/15/19
PROTOTYPE WAS CONDUCTED ON THE USCGC FRANK DREW (WLM-
557) AT PORTSMOUTH, VA, IN MAY 2017 AND WILL REMAIN INSTALLED.
Distribution Statement D: Distribution authorized to the DHS/CG/DoD and their contractors Administrative/Operational use, 01/15/19. Other requests shall be referred to .
WARNING: This document contains technical data whose export is restricted by the Arms Export-Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5200.22-M, National Industrial Security Program Operating Manual, Section 5-705 or DoD 5200.1-R, Information Security Program Regulation, Chapter VI, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
REVIEWED LOG YN DATA WEIGHT AND BALANCE OFFICER'S UNIT DOCUMENT
BY ENTRY SIGNATURE NUMBER
COMPLETED
TCTO WLM-175 TM4000
1. APPLICATION
This technical order is applicable to all Coast Guard Coastal Buoy Tenders (WLM-175) Class Cutter hulls 551 through 564.
2. PURPOSE
This Engineering Change (EC) provides instructions to add quick disconnects to thruster piping to facilitate filtration of lubrication oil in thruster system.
3. EC COORDINATOR
Technical questions or comments associated with this EC shall be directed to:
EC Coordinator:
Primary POC: CWO James Conley, SFLC IBCTPL AM Telephone: (443) 865-2686 E-mail: James.W.Conley@uscg.mil Additional contact information can be found on the appropriate Product Line’s webpage on SFLC’s CG Portal Site at https://cg.portal.uscg.mil/units/sflc/SitePages/Home.aspx.
4. WHEN TO BE ACCOMPLISHED
This EC shall be accomplished within 60 months after receipt of this EC.
5. BY WHOM TO BE ACCOMPLISHED
This EC shall be accomplished by the Coast Guard Yard, an Industrial Service Activity or other commercial contractor. The IBCT PL Planned Depot Maintenance (PDM) Section shall coordinate the scheduling and execution of this EC for each asset.
6. WHAT IS REQUIRED
a. SUPPLY SUPPORT
(1) Kits/Parts/Materials Required The following parts, kits, and/or materials are required to accomplish this EC and will be acquired through the supply sources discussed herein:
The following table contains the NON-GFE parts required to comply with this EC and are not contained in a kit. These parts shall be provided by the Installing Activity.
Table 6-1. NON-GFE INDIVIDUAL PARTS
QTY NSN/ACN PART
NUMBER
NOMENCLATURE SOURCE
2 ea 4730-21-920-8709 10642320-1 Coupling Assembly, Quick Disconnect
CAGE: 56161
2 ea 4730-01-584-3431 4464K276 Bushing, Pipe CAGE: 39428
2 ea N/A 1120T47 Standard-Wall Steel Unthreaded Pipe Nipple
CAGE: 39428
(2) Action Required on Items in Stock Not applicable.
(3) Disposition of Removed and Replaced Parts/Materials and Initial Seed of New Parts/Materials SFLC will be responsible for action on Inventory Control Point (ICP) Items.
Not applicable.
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
mailto:James.W.Conley@uscg.mil https://cg.portal.uscg.mil/units/sflc/SitePages/Home.aspx
b. MANPOWER AND PERSONNEL
WORK PHASE SKILLS LABOR-HOURS
Installation Machinery
Technician 6.0
Installation Fire Watch 4.0 Installation Certified Welder 4.0 Installation Outside
Machinist/Pipefitter 4.0
Inspection Outside Machinist/Pipefitter
2.0
Test QA 1.0
TOTAL 21.0
c. SUPPORT AND TEST EQUIPMENT
(1) Special Tools
None.
(2) Special Test Equipment None.
(3) Software None.
d. TECHNICAL DOCUMENTS The tables listed below are used to identify the documents that have been affected by and/or are required to accomplish this configuration change. The source codes listed below each table are used to identify the intended reason for inclusion in this EC; multiple codes may be applicable to each document:
(1) Drawings – Below are the drawing revisions that have been affected, created, or will be referenced while completing the changes called for in this EC. Consult CG-LIMS STIP, “http://cgweb.netims.uscg.mil:7002/NETIMS” for the most current drawing revision when making the installations.
CG-DWG REV TITLE ACTION(s)
TAKEN*
175-WLM-262-001 J Lube Oil System Diagram Q
175-WLM-262-005 G Lube Oil System A&D - Hull Blocks 930, 940, & 970 Q
175-WLM-568-002 M Bow Thruster Assembly R, Q
* ACTION TAKEN CODES (more than one code may be used) R – Revised as a result of EC Q – Required to complete EC A – Added as a result of EC D – Deleted (upon completion of EC)
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
http://cgweb.netims.uscg.mil:7002/NETIMS
(2) Technical Publications (TP) – Below are the TP revisions that have been affected, created, or will be referenced while completing the changes called for in this EC. Consult CG-LIMS STIP, “http://cgweb.netims.uscg.mil:7002/NETIMS” for the most current TP revision when making the installations.
TP
NUMBER
TITLE DATE ACTION(s)
TAKEN*
3602A Engineers Operating Manual (EOM) 05 January 2017 R
3628 Manufacturer’s Instruction Book –SWBS Group(s) 556-568 (Bow Thruster SWBS 568 Section A)
31 March 2017 R
* ACTION TAKEN CODES (more than one code may be used) R – Revised as a result of EC Q – Required to complete EC A – Added as a result of EC D – Deleted (upon completion of EC)
(3) Maintenance Procedure Cards (MPC) - Below are the MPC revisions that have been affected, created, or will be referenced while completing the changes called for in this EC. Consult CG-LIMS STIP, “http://cgweb.netims.uscg.mil:7002/NETIMS” for the most recent version.
MPC
NUMBER
DESCRIPTION ACTION REV DATE ACTION(s)
TAKEN*
A-C-14025 Hydraulic Filter Cart Water And Oil Filters
REPLACE 31 March 2017 A
A-C-14600 Bow Thruster Hydraulic Oil SERVICE 31 May 2018 A
* ACTION TAKEN CODES (more than one code may be used) R – Revised as a result of EC Q – Required to complete EC A – Added as a result of EC D – Deleted (upon completion of EC)
(4) Other - Below are all other documents that are required to complete this EC.
DOCUMENT
TYPE
TITLE DOCUMENT
NUMBER
REV DATE ACTION(s)
TAKEN*
Enclosure 1 Work Item 1: Thruster Quick Disconnects (QDs) Install
TCTO_TM4000_
26200_JBK_0718_
WLM
July 2018 Q, A
COMDTINST
Manual
Equipment Tag Out Procedure
9077.1 (series) 21 December 1995 Q
SFLC
Standard Specification
General Requirements 0000 2014 Q
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
DOCUMENT
TYPE
TITLE DOCUMENT
NUMBER
REV DATE ACTION(s)
TAKEN*
SFLC
Standard Specification
Welding and Allied Processes
0740 2014 Q
SFLC
Standard Specification
Requirements for Preservation of Ship Structures
6310 2014 Q
ASTM
International
(ASTM)
Standard Specification for Seamless Carbon Steel Pipe, for High-Temperature Service
A106 1 May 2018 Q
ASTM
International
(ASTM)
Standard Specification for Valve Label Plates
F992 01 May 2017 Q
Manufacturers Standardization Society of the Valve and Fittings Industry
Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
SP-58 Sept 2018 Q
* ACTION TAKEN CODES (more than one code may be used) R – Revised as a result of EC Q – Required to complete EC A – Added as a result of EC D – Deleted (upon completion of EC)
7. HOW WORK IS ACCOMPLISHED
a. INSTALL EQUIPMENT
(1) Install thruster quick disconnects to the head tank and to the thruster sampling line, (Refer to Enclosure 1).
** Q.A. (1) REQUIRED AT THIS POINT **
8. SUPPLEMENTAL INFORMATION
a. DESIGN INTERFACE
This EC will allow the ships force to filter the thruster lubrication fluid. With the addition of quick disconnect fittings on the thruster sample piping and head tank the vessel will have the ability to filter the lubrication fluid in a much more timely manner.
b. WEIGHT AND MOMENT INFORMATION This EC presents no effect in weight and Center-of-Gravity.
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
c. TRAINING AND TRAINING SUPPORT At a minimum, personnel shall familiarize themselves with the applicable Tech Pubs.
d. COMPUTER RESOURCES SUPPORT None.
e. PACKAGING, HANDLING, STORAGE AND TRANSPORTATION None.
f. FACILITIES None.
9. RECORDS
a. ACTION REQUIRED ON MAINTENANCE RECORDS
(1) TCTO Sign-Off Sheet Submission Upon completion of this EC, the unit shall complete the applicable portion of the EC sign-off sheet: Asset Number, Operating Facility (OPFAC), Technician’s Signature, and Technician’s ID blocks, and any desired remarks. Additional remarks may be made on the reverse side of the EC sign-off sheet. The unit shall then forward the completed and signed EC sign-off sheet to the EC Coordinator at:
USCG Surface Forces Logistics Center Attn: Mr. Tim Monroe, Logistics Manager
IBCT PL (ENG-AMS)
Bldg 31, Mail Stop 26 2401 Hawkins Point Road Baltimore, MD 21226-5000
(2) Maintenance Standards in FLS Maintenance Standards/Maintenance Items (MI) have been created in Fleet Logistics System (FLS) to schedule and track completion of this EC aboard each asset and shall be marked as “Completed” for each asset as the EC is accomplished. The configuration tree within FLS will automatically be updated upon moving the MI status to “Completed”.
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
b. ACTION REQUIRED ON SUPPLY RECORDS
(3) APL(s) Affected
Upon completion of this EC, perform the appropriate action to the APL(s) listed in Table 9-1.
Table 9-1. MODIFICATION TO APL(S)
APL NO ACTION QTY HSC FUNCTIONAL DESCRIPTION
83073090B8 M 2 31100 Bow Thruster Assembly
Actions are identified by the following:
A – Add D – Delete M – Modify
(4) Personal Property Records None.
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
TCTO_TM4000_26200_JBK_0718_WLI
WORK ITEM 1: Thruster Quick Disconnects (QDs), Install
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to install Quick Disconnect
(QD) fittings associated with TCTO TM4000 permitting Cutter’s portable filter cart to access and filter thruster system lube oil.
1.2 Government-furnished property.
None
2. REFERENCES
APM: If editing a WI's References, change the same reference in the Spec's
Consolidated List of References and send feedback to the WI's Developer.
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 262-001, Rev H, Lube Oil System Diagram
Coast Guard Drawing 175 WLM 262-005, Rev G, Lube Oil System A/D – Hull Blocks 910, 930, 940, & 970
Coast Guard Drawing 175 WLM 568-2, Rev M, Bow Thruster Assembly (Model 125 Fixed
Pitch)
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3628, SWBS 568, Section A, Jun 2009, Bow Thruster –
(Bird-Johnson Company)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) A106, 2015, Standard Specification for Seamless Carbon Steel
Pipe, for High-Temperature Service
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and
Installation
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Foundations
Piping
Tank
Lube oil
3.2 Fluid handling. The Contractor shall remove and dispose of removed fluids from the affected piping system modification, in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.
3.3 Piping installation particulars. The Contractor shall accomplish the following tasks, using Coast Guard Drawings 175 WLM 262-001, 175 WLM 262-005, 175 WLM 568-2, Coast Guard Technical
Publication 3628, SWBS 568, Section A, SFLC Std Spec 0740 (when applicable) and Figures1 through 4 for guidance:
Install contractor-supplied pipe nipples as needed to facilitate coupling of filter cart female quick disconnect (QD) fitting on hose assembly to Thruster piping. Pipe nipples and piping fittings, when needed, shall be of same material and size of that adjacent piping specified on Coast Guard Drawing 175 WLM 262-005 and 175 WLM 568-2. When necessary, welding of pipe nipples and piping shall be in accordance with SFLC Std Spec 0740.
NOTE
Length of pipe nipple shall be no less than 6”. However, length can be extended, as needed, to permit coupling of filter cart hose to thruster piping.
Install Contractor furnished bushings in four places (two places each thruster, i.e., bow & stern thrusters), as needed, to facilitate QD installation. Refer to Table 1.
Install Contractor furnished QDs in four places (two places each –bow thruster & stern thruster). Refer to Table 1.
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
NOTE
Shipboard requirements of SFLC Std Spec 0740 to gas free affected shipboard spaces, maybe avoided by removing portable shipboard piping to shore side in fabrication shop for preforming hot work.
3.3.1 Pipe hangers. Contractor shall furnish, fit, and install new pipe hangers for newly installed piping in accordance with MSS SP-58, as needed to satisfy CG drawings 175 WLM 262-001 & 175 WLM 262- 005 pipe support requirements.
3.3.2 Pipe labeling.
3.3.2.1 The Contractor shall stencil the following onto the pipe surfaces:
Name of the piping system service.
Destination, where feasible.
Direction of flow, indicated by an arrow three inches long pointing away from the lettering
(for reversible flow, point an arrow away from each end of the lettering – Applicable to all
QD piping.).
3.3.2.2 The Contractor shall ensure all lettering and arrow(s) are as follows:
In general, black color except white for dark-colored piping.
Applied in conspicuous locations and preferably near control valves.
3.3.3 Valve labeling. The Contractor shall renew all missing and damaged valve label plates, and install new valve label plates on new valves, in accordance with ASTM F992.
3.3.4 System flushing. Upon completion of piping fabrication, Contractor shall accomplish the following tasks:
3.3.4.1 Flush all new and disturbed piping with clean fresh water for five minutes. Direct flushing fluid to move scale and foreign debris away from installed machinery.
3.3.4.2 Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations.
3.3.4.3 Dry all water from thruster piping with warm dry, low-pressure air.
WARNING
Do not drain ANY Fluids (including fresh water) into any space, bilge, or exterior location.
3.4 Testing. Following fabrication and installation, Contractor shall, in the presence of the Coast Guard Inspector, accomplish the following tasks and submit a CFR:
3.4.1 Hydrostatic test. Contractor shall hydrostatically test all new and disturbed piping and components of the effected system in accordance with SFLC Std Spec 0740, Appendix C, “Hydrostatic Test”. No leakage or permanent deformation of pressure-containing parts permitted. Repair all leaks and discrepancies found. Submit CFR.
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
3.4.2 Leak test. Contractor shall after reassembling all disturbed mechanical joints (i.e. threaded, bolted, etc.), tightness test joints with system fluid at normal operating pressure. Ensure zero visible leakage.
Repair all leaks. Submit a CFR.
3.4.3 NDE. If applicable, Contractor shall perform NDE of all of watertight deck and/or bulkhead penetration sleeve welds in accordance with SFLC Std Spec 0740, Appendix C.
3.4.4 Post-repair operational test. Contractor shall thoroughly test and prove the piping system to be in satisfactory operating condition.
3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std
Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).
4. NOTES
This section is not applicable to this work item.
ITEM DESCRIPTION PART NUMBER/NSN QTY
Coupling Assembly, Quick
Disconnect (QD)*
P/N 10642320-1, Cage 56161 2 ea.
Bushing , Pipe* P/N 4464K276 Cage 39428 2 ea.
TABLE 1. CONTRACTOR FURNISHED FITTINGS (MIN NUMBER OF KNOWN FITTINGS)
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
FIGURE 1. EXCERPT FROM CG DWG 175 WLI 262-001, SHT 2
FIGURE 2. EXCERPT FROM CG DWG 175 WLI 262-005, SHT 63A (BOW THRUSTER)
Install new pipe nipple/bushing/ QD assembly here.
Install new pipe nipple/bushing/QD assembly here
Install new pipe nipple/bushing/QD assembly here Thruster Assembly
Sample Valve
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
FIGURE 3. PHOTO - TYPICAL HEAD TANK DRAIN VALVE
Install new pipe nipple/bushing/QD assembly here.
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
FIGURE 4. PHOTO - TYPICAL SAMPLE VALVE
Install new pipe nipple/bushing/QD assembly here.
Enclosure 1 TCTO WLM-175 TM4000
DESTRUCTION NOTICE- Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
| 175-WLM_TM4000.0 |
| 175-WLM_TM4000.0_Encl1 |
| ASSET NUMBER: |
| OPERATING ACTIVITY: |
| MONTH: |
| DAY: |
| YEAR: |
| ASSET HOURS: |
| MONTH2: |
| DAY2: |
| YEAR2: |
| ASSET HOURS2: |
| MONTH3: |
| DAY3: |
| YEAR3: |
| ZULU HOURS: |
| Check Box15: Off |
| mh11: |
| mh12: |
| mh13: |
| mh14: |
| mh15: |
| mh16: |
| mh17: |
| mh18: |
| mh19: |
| mh10: |
| mh111: |
| mh122: |
| mh133: |
| mh144: |
| mh155: |
| mh166: |
| mh177: |
| mh188: |
| mh199: |
| mh100: |
| Text7: |
| Text8: |
| REMARKS 1: |
| REMARKS 2: |
| ID: |
| LOG YN: |
| DATA ENTRY COMPLETED: |
| WEIGHT AND BALANCE: |
| UNIT DOC NUMBER: |
| logyn: |
| dec: |
| wabos: |
| udn: |
File details come from the government source that posted it. Updated .