Attachment_1_-_GEORGE_COBB_DD_FY19_SSOS_Price_Sheet.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- USCGC GEORGE COBB FY20 Dry Dock Repairs
- Solicitation number
- 70Z085-20-Q-P4501900
About this file
Attachment 1 - SSOS Price-Bid Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_Request_for_Clarification_Form.docx | DOCX document | |
| Attachment_5_-_USCG_Ombudsman_Notice.pdf | ||
| Attachment_3_-_Past_Performance_Information_Form.docx | DOCX document | |
| GEORGE_COBB_DD_FY20_RFQ-70Z08520QP4501900_Final09Aug19.pdf | ||
| Attachment_2_-_GEORGE_COBB_SPEC_REV0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | COMPANY NAME: |
| USCGC GEORGE COBB (WLM 564) DRYDOCK AVAILABILITY FY2020 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-002 | U/W Body, Preserve (100%) | $ - 0 | JOB | 1 | $ - 0 |
| D-003 | Appendages (U/W), Leak Test | $ - 0 | JOB | 1 | $ - 0 |
| O-004 | Appendages (U/W) - Internal, Preserve | $ - 0 | JOB | 1 | $ - 0 |
| D-005 | Chain Locker(s), Clean and Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-006 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-007 | Tanks (Mp Fuel Service), Clean And Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-008 | Tanks (Ballast), Clean and Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-009 | Tanks (Dirty Oil and Waste), Clean and Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-010 | Z-Drive Propulsion Units, Overhaul | $ - 0 | JOB | 1 | $ - 0 |
| D-011 | Fathometer Transducer, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-012 | Sea Valves and Waster Pieces, Overhaul or Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-013 | Sea Bay, Clean and Inspect | $ - 0 | JOB | 1 | $ - 0 |
| O-014 | Sea Bay, Preserve 100% | $ - 0 | JOB | 1 | $ - 0 |
| D-015 | Thruster Unit (General), Overhaul | $ - 0 | JOB | 1 | $ - 0 |
| D-016 | Anchor Windlass, Inspect And Service | $ - 0 | JOB | 1 | $ - 0 |
| D-017 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | JOB | 1 | $ - 0 |
| D-018 | Sewage Holding Tank(s), Clean and Inspect | $ - 0 | JOB | 1 | $ - 0 |
| D-019 | Sewage Piping, Clean And Flush | $ - 0 | JOB | 1 | $ - 0 |
| O-020 | Tanks (Sewage Holding), Preserve “100%” | $ - 0 | JOB | 1 | $ - 0 |
| O-021 | Tanks (Sewage Holding), Preserve “Partial” | $ - 0 | JOB | 1 | $ - 0 |
| O-022 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $ - 0 | JOB | 1 | $ - 0 |
| D-023 | Cathodic Protection / Zinc Anodes, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-024 | Drydock | $ - 0 | JOB | 1 | $ - 0 |
| D-025 | Temporary Services, Provide - Cutter | $ - 0 | JOB | 1 | $ - 0 |
| D-026 | Sea Trial Performance, Support, Provide | $ - 0 | JOB | 1 | $ - 0 |
| D-027 | Bilges, Preserve | $ - 0 | JOB | 1 | $ - 0 |
| D-028 | Compartment Insulation (General), Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-029 | Deck Covering (Interior Wet/Dry), Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-030 | Handrails and Stanchions, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-031 | Piping Insulation, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-032 | Heat Pumps, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-033 | Shower Pan Inspection and Repair | $ - 0 | JOB | 1 | $ - 0 |
| D-034 | Goose Neck Vent Pipe, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-035 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | $ - 0 | JOB | 1 | $ - 0 |
| D-036 | Hull Plating (Side Scan), Ultrasonic Testing | $ - 0 | JOB | 1 | $ - 0 |
| D-037 | Towing Bitts, Chocks, and Fairleads, Inspect and Test | $ - 0 | JOB | 1 | $ - 0 |
| O-038 | Chain Lockers, Preserve – Partial | $ - 0 | JOB | 1 | $ - 0 |
| D-039 | Slip Resistant Sheets, Exterior Decks, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-040 | Auxiliary Seawater (ASW) System Piping, Renew | $ - 0 | JOB | 1 | $ - 0 |
| D-041 | Galley Sink Drain, Modify | $ - 0 | JOB | 1 | $ - 0 |
| O-042 | Hull Plating Freeboard, Preserve – Partial | $ - 0 | JOB | 1 | $ - 0 |
| O-043 | Hull Plating Freeboard, Preserve “100%” | $ - 0 | JOB | 1 | $ - 0 |
| O-044 | Hull and Structural Plating (General) -10.2-Pound Steel, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-045 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-046 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-047 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-048 | Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-049 | Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew | $ - 0 | JOB | 1 | $ - 0 |
| O-050 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | $ - 0 | JOB | 1 | $ - 0 |
| O-00A | Composite Labor Rate | $ - 0 | Hour | 1410 | $ - 0 |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | $ - 0 | DAY | 5 | $ - 0 |
| M-00A | Contractor Markup Rate for Growth Work = G&A + Profit (In Percent) | % | |||
| Total Price of Definite Items: | $ - 0 | ||||
| Total Price of Option Items: | $ - 0 | ||||
| TOTAL PRICE (Of DEFINITE & OPTION ITEMS): | $ - 0 | ||||
| *** Please CHECK & VERIFY all price submittals for completeness & accuracy. *** | |||||
| Pricing must include any and all Travel and Related Expenses. |