STURGEON_BAY_(WTGB_140)_DS_FQ2_MJW_19ER1_BLANK_FY20.xls
XLS spreadsheet 48 KB Posted
- Attached to
- ENGINE OVERHAUL CGC STURGEON BAY
- Solicitation number
- 70Z085-20-Q-P4501400
About this file
SOS/SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002_STURGEON_BAY_ENGINE_OVERHAUL.pdf | ||
| Solicitation_Amended_STURGEON_BAY_ENGNE_OVERHAUL.docx | DOCX document | |
| Amendment_0001_STURGEON_BAY_ENGINE_OVERHAUL.pdf | ||
| Attachment_5_-_USCG_Ombudsman_Notice.pdf | ||
| STURGEON_BAY_DS_BSSDG_CSO_REV0_FY20.docx | DOCX document | |
| Attachment_3_-_Past_Performance_Information_Form.docx | DOCX document | |
| Redacted_STURGEON_BAY_BSSDG_SIGNED_JA__Level_Above.pdf | ||
| Solicitation_STURGEON_BAY_ENGNE_OVERHAUL.docx | DOCX document | |
| Attachment_4_-_Request_for_Clarification_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC STURGEON BAY (WTGB-109) DOCKSIDE AVAILABILITY FY-20 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | #1 Ship Service Diesel Generator, Overhaul | JOB | 1 | ||
| D-001 | #2 Ship Service Diesel Generator, Overhaul | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 100 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | ||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(5/14/2019) Rev-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it.