JOHN_MIDGETT_UPDS_FY19_R1.pdf
PDF 1 MB Posted
- Solicitation number
- 70Z08519RP45G6200
About this file
ATTACHMENT - SPECIFICATION FOE UNPLANNED DOCKSIDE REPAIRS FOR CGC JOHN MIDGETT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_No._0002.pdf | ||
| SF_30_-A0001.pdf | ||
| ATTACHMENT_4_-_Request_for_Clarification_Form_(JMIDGETT).doc | DOC document | |
| ATTACHMENT_3_-_Continuation_of_Synopsis_Solicitation_(JMIDGETT_UPDS).doc | DOC document | |
| ATTACHMENT_2-SCHEDULE_OF_PRICES_(JMIDGETT_UPDS).docx | DOCX document | |
| Attachment_5_-_GOVERNMENT_PROPERTY_REPORT.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC JOHN MIDGETT (WHEC 726)
SPECIFICATION FOR UNPLANNED DOCKSIDE REPAIRS
FY2019
Developed By: CWO Leemelvin D Gavino
(Rev-1, 28 June 2019)
USCGC JOHN MIDGETT (WHEC 726) UNPLANNED DOCKSIDE REPAIRS FY2019
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Decks (Helicopter Operating Areas), Preserve WORK ITEM 2: Tenting, Provide WORK ITEM 3: Boiler, Inspect and Repair WORK ITEM 4: Vent Duct and Plenum Plate, Renewal WORK ITEM 5: Tank Manhole Ring, Renewal iii (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
28JUN19 01 3-5 Added new work item(s), updated references, Government-furnished Property, and Critical Inspection Items Report(s).
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 378 FRAM E 517-003, Rev -, Steam Heat Boiler Assy & Sect Coast Guard Drawing 378 FRAM E 517-004, Rev A, Auxiliary Boiler Retro-Fit Combustion System
Boiler Controls General Arrangement Coast Guard Drawing 378 FRAM E 517-005, Rev B, Auxiliary Boiler Retro-Fit Combustion System
Schematic Coast Guard Drawing 378 FRAM E 517-006, Rev A, Auxiliary Boiler Retro-Fit Combustion System
Installation Drawing Coast Guard Drawing 378 FRAM W 132-002, Rev A, 2nd & 3rd Deck Plating Aft Coast Guard Drawing 378 FRAM W 167-003, Rev D, List of Manholes Coast Guard Drawing 378 FRAM W 508-001, Rev C, Insulation Schedule Coast Guard Drawing 378 FRAM W 512-016, Rev F, HVAC A&D Frame 72-120 Above Main Deck Coast Guard Drawing 378 FRAM W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3273, Manufacturers Instruction Book, SWBS Group(s) 517-529 Coast Guard Technical Publication (TP) 4861A, Auxiliary Boiler Retro-Fit Combustion System –
Micro2000 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) D2475-01(2008), 2008, Standard Specification for Felt Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2013, Occupational Safety and Health
Standards Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health
Standards for Shipyard Employment v (Rev-1)
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment MIL-PRF-24667, May 2008, Coating system, Non-Skid, for Roll or Spray Application Naval Air Warfare Center (NAVAIR), Drawing 626310, Rev L, Visual Landing Aids Installation WHEC-
378 Class Ships NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details QPL-24667, Jul 2014, Qualified Product List of Products Qualified under Performance The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No.3, 2007, Commercial Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning vi (Rev-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
vii (Rev-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000):
Work Item Title
This section is not applicable to this package.
viii (Rev-1)
PRINCIPAL CHARACTERISTICS
378 WHEC (W-CLASS: MIDGETT)
PHYSICAL
Length overall 378' 3" Length between perpendiculars 350' 0" Maximum beam (@ 13' 6" dwl) 42' 0" Beam @ main deck 42' 0" Depth 26' 3/8" Main deck camber 6" in 21' 0" Minimum berth depth 30' 0" Height of highest projection 116' Draft, fwd @ full load 14.78' Draft, aft @ full load 15.61' Draft, fwd @ minimum operating 14.63' Draft, aft @ minimum operating 15.33' Full load displacement 3313 long tons Minimum operating displacement 2762 long tons Light ship displacement 2433 long tons
HULL
Frame spacing 1' 0" Material Deckhouse, fwd of frame 96 HY-100 Steel Main deck frames 183 to 242-1/2 and fwd of FR 96
HY-80 Steel
01 level frames 183 to 316 HY-80 Steel Lower hull around bow thruster, port and starboard strakes A-3 and A-4, frames 56 to 96
HY-80 Steel
Masts and superstructure above the 01 deck
Type 3456 Aluminum
Remaining ASTM A-131
MACHINERY
Type of propulsion CODOG Two diesel engines Fairbanks More 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total Two gas turbines Pratt and Whitney FT4A-2; 36,000 SHP total Two controllable pitch propellers Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines Two reduction gears Western Gear Electrical characteristics Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room) One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators ix (Rev-1)
TANK CAPACITIES
Diesel oil 192,858 gal. (95%) Fresh water 17,695 gal. (100%) JP-5 fuel 27, 603 gal. (95%)
1 (Rev-1)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-1)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. Coast Guard Base Seattle is a Large Quantity Generator of Hazardous Waste and holds a WA State Department of Ecology permit.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
3 (Rev-1)
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor shall provide a boom, at no additional expense to the Government, when on/off-loading liquids to pier.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3 (QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical
4 (Rev-1) drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-1)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
8 (Rev-1)
TIME
9 (Rev-1)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Rev-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-1)
12 (Rev-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
13 (Rev-1)
63120_DksHeloOps_0718_FLT REC_63120_DksHeloOps_FLT_378' WHEC 'W' Class (ALL) (0609)
WORK ITEM 1: Decks (Helicopter Operating Areas), Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the Helicopter Operating (HELO Ops) areas /Flight Deck (see 4.1 (Definition of HELO Ops Areas)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378 FRAM W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
MIL-PRF-24667, May 2008, Coating system, Non-Skid, for Roll or Spray Application Naval Air Warfare Center (NAVAIR), Drawing 626310, Rev L, Visual Landing Aids Installation
WHEC-378 Class Ships QPL-24667, Jul 2014, Qualified Product List of Products Qualified under Performance The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP
11), 2012, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
14 (Rev-1)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 As per SFLC Standard Specification 6310 para 3.1.5, when the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in SFLC Std Spec 6310 para
3.1.4 (Ambient condition parameters), cannot be met, provide the following suitable tenting, at no additional cost to the Government.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
• Flight deck safety net assemblies.
• Talon grid cover.
3.1.5 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.3 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
• Achieving greater productivity.
• Achieving the required surface profile.
NOTES AND CAUTION!
1. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
2. Initial removal of the coating system around deck edges, fittings, and deck coaming may be by power tool cleaning in accordance with SSPC-SP-11.
3. Flight Deck surfaces are constructed of HY-80 steel and may NOT be heated to remove the existing covering.
4. During pier side surface preparation, suitable means to contain generated dust, waste water, paint chips, spent abrasives, and overspray must be provided or employed, as applicable. Plywood or net/canvas barriers are typically used to surround the area being blasted to contain stray steel shot.
When net barriers are used, the mesh size of the netting material must be small enough to ensure that the steel shot will be contained. In addition, net barriers, when used, must be overlapped where attached to stanchions, and anchored at the bottom for the entire net’s length between stanchions, to limit the clean–up and localize the blast medium. Steel shot on a deck is a foreign object damage (FOD) hazard and extreme care must be taken to prevent slipping when walking over contaminated areas.
15 (Rev-1)
3.1.6 Visual Landing Aid (VLA) and safety marking sketch. Prior to commencing surface preparation tasks, the Contractor shall develop and submit, to the COR, a sketch of all existing Flight Deck VLA and safety markings and their measured locations on the Flight Deck, using NAVAIR Drawing 626310 as guidance. Obtain Coast Guard Inspector approval of the sketch, prior to applying new marking paint (see
3.3.2 (VLA and safety markings)).
3.1.7 Substrate inspection. After completion surface preparation and before application of primer coat, the Contractor shall perform a visual inspection and conduct 200 UT shots of the prepared substrate as designated by the Coast Guard Inspector; submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Preservation requirements. The Contractor shall prepare and coat the deck surfaces designated in paragraph 1.1 (Intent), using the system specified for “Flight Deck, Option I”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Painting System)”. Ensure that the system is qualified as “UV/LSA”, as specified in QPL-24667, and is epoxy-based.
3.3.1 Top coating color. The Contractor shall accomplish the following tasks:
3.3.1.1 Non-skid/non-slip surfaces. Select Grey (36076) as the top/finish coat color.
3.3.1.2 Non-slip-exempted areas. Apply a dark grey color (36076) top/finish coating, in lieu of non-slip top-coating over the following non-slip-exempted areas:
• Deck fittings, including, but not limited to: pad eyes, label plates, net supports/foundation, helicopter tie-down fittings, and lifting handles for aircraft fuel filling station.
• Areas within two inches of deck fittings, welds, and protrusions.
• Areas within six inches of adjacent bulkheads, deck coaming, and deck edges.
• Waterways.
3.3.2 VLA and safety markings. The Contractor shall accomplish the following tasks:
3.3.2.1 Remove Flight Deck landing lights in way of work. Visually inspect light assemblies and submit CFR. Prepare and preserve light assemblies to match existing in accordance with SFLC Std Spec 6310.
Reinstall light assemblies to original configuration.
3.3.2.2 Stripe the Flight Deck with the same pattern sketched prior to surface preparation.
3.3.2.3 Paint new VLA and safety markings with a White color (37875) finish coating.
3.4 Low temperature cure system. If a Change Request has been authorized and released, the Contractor shall apply a low temperature cure system, conforming to MIL-PRF-24667, Type VIII, Composition G.
Ensure that the white color top coating is a silicone alkyd enamel product, recommended by the nonskid coating system manufacturer, in lieu of the polyurethane-based (Interthane 990) coating listed on QPL- 24667.
16 (Rev-1)
3.5 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
NOTES AND WARNING
1. The flight deck coating system must be procured as a kit containing the following – all conforming to MIL-PRF-24667:
a. Anti-corrosive/primer coating.
b. Dark grey color (36076) non-slip top coating.
c. Dark grey color (36076) finish coating, for non-slip exempted areas.
d. White finish color (37875) coating, for VLA and safety markings.
2. The low temperature system is only authorized for application at temperatures between 35-45 degrees F.
3. Polyurethane-based non-skid systems are not authorized on Coast Guard vessels.
4. Surfaces being preserved are considered “critical-coated surfaces”.
3.6 Non-skid surface appearance and texture. The Contractor shall ensure the non-skid surface shall show a pattern of peaks and ridges. The ridge profile shall be continuous and reasonably uniform. Peaks and ridges shall be generally in the same direction (fore and aft), approximately 1/2 to 1 inch apart, and approximately 1/16 to 3/32 inches high. Aggregate shall present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles. All weld seams shall be cross-rolled from a minimum of 3 inches on either side of the weld.
3.7 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 Definition of “HELO Ops Areas”. “HELO Ops Areas” are defined as 01 Level deck surfaces, Frame 232 aft, port and starboard, excluded deck surfaces inside of the retracted HELO Hangar, shown on Coast Guard Drawing 378 FRAM W 801-001 and attached Figure I, including helicopter tie-down fittings, 01 Deck perimeter coaming, talon grid cover, raised “mushroom” type tie-down fittings, line-up light fixtures, flight deck net supports/foundations, and up to six inches on all adjacent vertical surfaces, where applicable.
4.2 Certification hot line action desk. The Naval Air Warfare Center Aircraft Division Lakehurst has the responsibility for inspection and certification of all air capable aviation ships which support and operate with helicopters. A Shipboard Aviation Facility hot line action desk has been established at the Naval Air Warfare Center Aircraft Division Lakehurst, to provide a central point of contact for obtaining all information pertinent inspection and certification issues, including VLA and safety markings. The hot line action desk is in operation 24 hours a day and can be reached by contacting:
17 (Rev-1)
NAVAIRWARCENACDIVLKE
Lakehurst, N.J 08733-5000 Hot Line Action Desk (4.8.2.5) Phone: (732) 323-2592
4.3 Unit’s responsibilities. The ship's force will be responsible for the following:
• Removing and reinstalling all deck drain gratings.
• Plugging deck drains.
• Preliminary freshwater wash down of flight deck surfaces, in addition to adjacent bulkhead surfaces, prior to the commencement of contracted work, in order to remove sea salt.
• Ensuring there is no engine operation and no stack emissions at any time during flight deck resurfacing.
• Restricting access to the Flight Deck work area to only authorized personnel.
• Contacting NAVAIR for inspection and certification of flight deck markings following work.
18 (Rev-1)
FIGURE 1 - SCOPE OF PRESERVATION FOR 378 WHEC (EXCLUDING HANGAR DECK)
19 (Rev-1)
13000_TntngPrvd_0619_FLT
WORK ITEM 2: Tenting, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide suitable working condition and protect environment from project materials and processes by tenting work areas as listed in Table 1.
TABLE 1. TENTING LOCATION
AREA LOCATION
Flight Deck (Outside Helo Hangar) 01 Level Deck, Fr. 232 to 317
Hangar Door (External) 01 Level Deck, Fr. 248
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378 FRAM W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2013, Occupational Safety and Health
Standards Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health
Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
3. REQUIREMENTS
3.1 General.
20 (Rev-1)
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove and dispose of all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Work coordination. The Contractor shall coordinate the accomplishment of this work item with the following work items:
• Decks – Helicopter Operating Area, Preserve
3.2 Environmental protection. The Contractor shall abide by all requirements for environmental protection specified in SFLC Std Spec 0000, Appendix A (Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities), and Appendix B (Requirements for Environmental Protection at USCG Facilities).
3.3 Safety and protection. The Contractor shall comply with all required and applicable safety and protection specified in SFLC Std Spec 0000, paragraph 3.3.1 (Personnel safety and property protection -general), and all OSHA safety and health regulations, and any other applicable federal, state, and local laws, and regulations, for the protection of both personnel and property.
• Suitable Scaffolding and/or lifelines are required for working above five feet (29 CFR 1910 and 1915)
• Temporary lines or rails shall be installed in place of all removed lifelines or liferails, and be retained until replacement tasks have been completed.
• Adequate illumination is required in walkways, work areas, and access to provide a safe work environment (29 CFR 1915.92(a))
3.4 Tenting. The Contractor shall tent the designated areas as listed in the Table 1 (during blasting and preservation operations) in accordance with SFLC Std Spec 6310, paragraph 3.1.5 (Tenting and ambient condition control). Tenting features shall be as follows:
• Tenting shall be set up in a way that it will not interfere with the blasting, preservation, or machinery removal and reinstallation operations.
• Tenting shall be constructed to prevent precipitation from affecting normal repair operations, and be able to withstand severe inclement weather conditions.
• Tenting shall be outfitted with a re-sealable opening that will permit loading and unloading of equipment and supplies.
• Tenting shall be used to protect the environment from possible contamination due to preservation work.
21 (Rev-1)
• Temporary tenting shall be included to protect exterior surfaces from inclement weather, while undergoing preservation.
• Temporary enclosures may be rigged and left overnight as long as they do not block egress routes or ventilation.
3.5 Ambient condition control. The Contractor shall control environmental conditions necessary for required works in accordance with SFLC Std Spec 6310, paragraph 3.1.4 (Ambient condition parameters).
3.5.1 Control equipment. To maintain ambient conditions recommended by coating system manufacturers, and accomplish surface preparation and coating application, the Contractor shall provide suitable ambient condition control equipment including, but not limited to:
• Lighting : Lights and light fixtures
• Temperature : HVAC systems (e.g. heaters, air-conditioners)
• Humidity : Humidifiers, or dehumidifiers
• Air circulation : Blowers, and ventilators
3.5.2 Control plan. The Contractor shall submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process.
3.6 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).
4. NOTES
This section is not applicable to this work item.
22 (Rev-1)
S19_040_51700_TAB_0619_726
WORK ITEM 3: Boiler, Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspect and repair of auxiliary boilers listed on table #1.
TABLE 1 – LIST OF BOILERS
FIRE TUBE
AUXILIARY
BOILER
MANUFACTURE /
MODEL
NUMBER OF
TUBES TO BE
RENEWED
LOCATION
Stbd Boiler (No.1) Johnston Boiler /
509S-4PC
10% or 6 Boiler Flat 3-192-0-E
Port Boiler (No.2) Johnston Boiler /
509S-4PC
10% or 6 Boiler Flat 3-192-0-E
1.2 Government-furnished property.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378 FRAM E 517-003, Rev -, Steam Heat Boiler Assy & Sect Coast Guard Drawing 378 FRAM E 517-004, Rev A, Auxiliary Boiler Retro-Fit Combustion
System Boiler Controls General Arrangement Coast Guard Drawing 378 FRAM E 517-005, Rev B, Auxiliary Boiler Retro-Fit Combustion
System Schematic Coast Guard Drawing 378 FRAM E 517-006, Rev A, Auxiliary Boiler Retro-Fit Combustion
System Installation Drawing Coast Guard Drawing 378 FRAM W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3273, Manufacturers Instruction Book, SWBS Group(s)
517-529 Coast Guard Technical Publication (TP) 4861A, Auxiliary Boiler Retro-Fit Combustion System –
Micro2000
23 (Rev-1)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall refer to following additional Coast Guard Drawings for guidance:
• Coast Guard Drawing 378 FRAM E 517-003, Steam Heat Boiler Assy & Sect
• Coast Guard Drawing 378 FRAM W 801-001, Booklet of General Plans
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide the services of qualified Tech Rep, who is familiar with the boilers, to accomplish the following tasks – on site:
• Conduct internal and external inspections of the boilers.
• Verify proper operation of the automatic boiler control system.
3.1.2.1 The Contractor shall ensure that the Tech Rep is a certified boiler inspector.
3.1.2.2 The Contractor shall submit the name of the Tech Rep to the COR at the Arrival Conference.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Piping
• Water
• Lagging
3.1.5 Hotwork. The Contractor shall conduct all Hotwork and welding inspections in accordance with SFLC Std Spec 0740. All welds shall be continuous, 100% efficient welds.
3.1.6 Acceptance testing. The Contractor shall perform all acceptance tests in the presence of the Coast Guard Inspector.
24 (Rev-1)
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the equipment listed on Table 1 to demonstrate existing operational condition. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 The Contractor shall disassemble boilers as required to make tube sheets and the waterside open to access in accordance with Coast Guard Drawing 378-FRAM-E 517-3 and TP 3273. Submit a CFR indicating condition prior to cleaning.
3.4 Waterside Clean and Inspection. Mechanically and/or chemically clean the waterside of each boiler shell, tubes and tube sheets as much as can be accessed, to include all soft scale, deposits, sediment, sludge, and loose debris. Remove all debris and dispose of in accordance with local, state, and federal regulations.
3.4.1 Preparation For Boiler Inspection. The Contractor shall drain water from each boiler. Dispose of the boiler water in accordance with all related local, state, and federal regulations. It is anticipated that approximately 250 gallons of treated water will be drained from each boiler.
3.4.2 Wash the waterside interior of each boiler with clean, fresh water. Collect the wash water and properly dispose of it in accordance with all federal, state, and local regulations.
NOTE
Prevent debris from clogging the piping by blanking off bottom blow (drain) and water inlet.
3.4.3 The Contractor with Tech Rep support shall perform an inspection of the waterside including boiler safety valves. Submit CFR.
3.5 Stbd side Boiler #1. The Contractor shall perform the following repairs and adjustments:
• Install missing oil line check valve on burner drawer.
• Move the pilot assemble to mount at 12:00 on the burner drawer with the oil lines positions swapped.
• Reset burner combustion parameters with new modifications.
• Verify calibration on all meters and control devices
• Calibrate stack O2 sensor
• Install a visual water gauge with the existing provisions
3.6 Port side Boiler #2. The Contractor shall perform the following repairs and adjustments:
• Adjust controls and settings for automatic operation
• Install missing oil line check valve on burner drawer
• Move the pilot assemble to mount at 12:00 on the burner drawer with the oil lines positions swapped
• Reset burner combustion parameters with new modifications
25 (Rev-1)
• Verify calibration on all meters and control devices
• Calibrate Stack O2 sensor
• Install a visual water gauge with the existing provisions
3.8 Low water Cutoff. The Contractor shall clean and inspect the low water cutoff.
3.9 Boiler tube repairs. For estimating purposes the Contractor shall estimate the following repairs will be necessary:
• Renew up to 10% or 6 tubes from each boiler.
3.9.1 The Contractor shall furnish and install the new boiler tubes. Tubes shall be supplied over long and cut to fit on site.
3.10 Boiler hydrostatic testing. Gag boiler safety valves to allow hydrostatic testing of boiler. Using fresh heated water, conduct a hydrostatic test of the boilers at 125% (188psi) of designed operating pressure to verify the integrity of the vessel. If no major leaks are found then lower pressure to 100% designed operating pressure (150psi) and hold this pressure for a minimum of 15 mins. Conduct the hydrostatic test in the presence of the boiler inspector.
NOTES
1. The hydrostatic test pump used shall be supplied with a calibrated pressure gage suitable for the pressure being tested
2. The contractor to supply heated water (between 70 and 120 deg. F) to conduct hydrostatic testing of the boilers
3.10.1 Visually inspect the boilers and boiler tubes for any indication of leakage during the 100% hydrostatic test of each boiler. Tubes that leak are to be repaired and the boiler must be retested.
3.10.2 If the boiler requires a second hydrostatic test, the second test and any additional tests shall be conducted at 125% of boiler’s design pressure. If no major leaks are found then lower pressure to 100% designed operating pressure (150psi) and hold this pressure for a minimum of 15 mins.
3.10.3 After satisfactory completion of hydrostatic testing, drain and flush the boiler with feed quality water to remove any chlorides introduced during hydrostatic testing.
3.10.4 Catch and dispose of all hydrostatic testing and flushing water. Do not drain to ship’s bilges.
3.10.5 Upon completion of boiler hydrostatic testing remove the gags on the boiler safety valves. Verify removal of safety valve gags with ship’s engineer officer.
3.10.6 Reassemble the boilers. Reinstall any removed components using new gaskets.
WARNING