This amendment modifies a solicitation for the installation of propulsion control modifications on 140-foot Coast Guard cutters. The contractor will perform the installation work outlined in the specification, including oversight, installation procedures, and post-installation activities. The amendment clarifies that the contractor is responsible for installation, not just overseeing the work of others. Offerors should ensure their pricing accounts for performing the full scope of installation services as defined in Section 5.0 of the specification. The combined synopsis/solicitation remains open, with a response due date of July 30, 2019. The solicitation is seeking these installation services from the Department of Homeland Security Coast Guard.

Amendment 07, Question & Answer

View the file

Other files

File Type Posted
Amendment_10-WTGB_140_Foot_PC_Modification.doc DOC document
Attachment_4f,_Request_for_Clarification_WTGB_response.docx DOCX document
Attachment_1,_Work_Item_Price_List,_Revised,_4_Sep_2019.xlsx XLSX spreadsheet
Amendment_09-WTGB_140_Foot_PC_Modification.doc DOC document
Attachment_4d,_Request_for_Clarification_WTGB.docx DOCX document
Amendment_08-WTGB_140_Foot_PC_Modification.doc DOC document
Attachment_4c,_Request_for_Clarification_WTGB.docx DOCX document
Attachment_4f,_Request_for_Clarification_WTGB.docx DOCX document
Attachment_4b,_Request_for_Clarification_WTGB.docx DOCX document
Attachment_4e,_Request_for_Clarification_WTGB.docx DOCX document
Attachment_4a,_Request_for_Clarification_WTGB.docx DOCX document
Attachment_4_Request_for_Clarification_(1)_WTGB_2.docx DOCX document
Amendment_06-WTGB_140_Foot_PC_Modification.doc DOC document
Attachment_1,_Work_Item_Price_List,_Revised,_28_Aug_2019.xlsx XLSX spreadsheet
140-WTGB-MPCMS-Support-Upgrade-Specification,_Rev_1,_28_Aug_2019.docx DOCX document
Amendment_05-WTGB_140_Foot_PC_Modification.doc DOC document
Amendment_04-WTGB_140_Foot_PC_Modification.doc DOC document
WTGB_140'_Requests_for_Clarification,_4.docx DOCX document
Amendment_03-WTGB_140_Foot_PC_Modification.doc DOC document
APPENDIX_A,_05-02-05.pdf PDF
Amendment_02-WTGB_140_Foot_PC_Modification.doc DOC document
Amendment_01-WTGB_140_Foot_PC_Modification.doc DOC document
Attachment_1,_Work_Item_Price_List,_2.xlsx XLSX spreadsheet
S1.lov,_WTGB_140_foot_PC_Mod_FY19,_Solicitation_3.doc DOC document
S1.1c,_Attachment_2,_140-WTGB-MPCMS-Upgrade-Spec,_updated,_20190712.docx DOCX document
Attachment_3,_Past_Performance_Information_Form.doc DOC document
Attachment_4,_Request_for_Clarification.docx DOCX document
Attachment_5,_USCG_Ombudsman_Notice.doc DOC document
Attachment_1,_Work_Item_Price_List.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE
OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment 07
08/30/2019
2119859P45C6200
6. ISSUED BY
CODE
70Z085
7. ADMINISTERED BY (If other than Item 6)
CODE
70Z085

SFLC-CPD C&P2-IBCT

1301 Clay Street, Suite 800N

Oakland, CA 94612

SFLC-CPD C&P2-IBCT

1301 Clay Street, Suite 800N

Oakland, CA 94612-5249

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code)
(
9.A AMENDMENT OF SOLICITATION NO.

70Z085-19-Q-P45C6200

X
9B. DATE (SEE ITEM 11)

30 July 2019

10A. MODIFICATION OF CONTRACT/ORDER NO. ?

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

Contract Clause, H.4 Option Item; FAR 17.207©

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer the following question:

Question: Regarding the USCG’s response on Question #4 (previous amendment), there remains some confusion on pricing.

Section 5.0 of the Specification identifies the scope for “Installation Support.” The spreadsheet and CLIN listing only show Pre-Installation and Post-Installation for the Prototype; and Pre-Installation, Install Procedures, and Post-Installation. The response to Question #4 creates some ambiguity if the USCG will perform the installation. Further, USCG’s response on 4.0 D suggests that Installation support is limited to only changes to the plan and lessons learned; not the installation work itself. Specification Section 5.0 states the Contractor will oversee the installation, etc. Please clarify. If the Contractor shall perform the work in Section 5.0, request direction on which CLIN should costs be entered for the Prototype can subsequent Hulls.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Andrew Jacobs

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
BY
30 Aug 2019

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)PREVIOUS EDITION UNUSABLE

Prescribed by GSA, FAR (48 CFR) 53.243

Amendment 07 Continued:

Answer: The Government wishes the contractor to perform the installation, not just oversee the work performed. Please see the revisions made to the specification in the previous amendment.

All other terms and conditions of the combined synopsis/solicitation remain unchanged.