PENOBSCOT_BAY_SECTION_B-SCHEDULE_OF_SUPPLIES_AND_SERVICES.pdf
PDF 80 KB Posted
- Attached to
- USCGC PENOBSCOT BAY - DRYDOCK REPAIRS
- Solicitation number
- 70Z085-19-Q-P4553700
About this file
SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PENOBSCOT_BAY_-_QUESTIONS_AND_ANSWERS_2.docx | DOCX document | |
| Amendment_0002_PENOBSCOT_BAY.docx | DOCX document | |
| PENOBSCOT_BAY_(WTGB_140)_SPECIFICATIONS.pdf | ||
| PENOBSCOT_BAY_(WTGB_140)_DD_SECTION_B.xls | XLS spreadsheet | |
| PENOBSCOT_BAY_-_QUESTIONS_AND_ANSWERS.docx | DOCX document | |
| Amendment_0001_PENOBSCOT_BAY.pdf | ||
| PENOBSCOT_BAY_-_PAST_PERFORMANCE.doc | DOC document | |
| PENOBSCOT_BAY_-_OMBUDSMAN.doc | DOC document | |
| PENOBSCOT_BAY_-_WORK_SPECIFICATION.pdf | ||
| PENOBSCOT_BAY_-Request_for_Clarification.doc | DOC document | |
| CGC_Dry_Dock_PBAYFY19_SOL_1.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE FOR:
USCGC PENOBSCOT BAY (WTGB-140) DRYDOCK AVAILABILITY FY2019
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-001 Hull Plating (U/W Body), Inspect JOB 1
D-002 Hull Plating (U/W Body), Ultrasonic Testing JOB 1
O-003 U/W Body, Preserve (100%) JOB 1
O-004 U/W Body, Preserve (Partial - Condition A) JOB 1
O-005 U/W Body, Preserve (Partial - Condition B) JOB 1
O-006 U/W Body, Preserve (Partial - Condition C) JOB 1
O-007 Hull Plating Freeboard, Preserve “100%” JOB 1
O-008 Hull and Structural Plating (General) -10.2-Pound Steel, Renew JOB 1
O-009 Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Ren JOB 1
O-010 Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Rene JOB 1
O-011 Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Rene JOB 1
O-012 Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plat JOB 1
O-013 Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Ren JOB 1
O-014 Hull And Structural Plating (General) - Cracked Steel Welds, Repairs JOB 1
O-015 Hull and Structural Plating -{Insert Plate Size (i.e. 1/2” or 5/16”, JOB 1
O-016 Hull And Structural Plating (General) - Degraded Weld (Steel), Repai JOB 1
D-017 Bubbler Channels, Inspect JOB 1
D-018 Appendages (U/W), Leak Test JOB 1
D-019 Propulsion Shaft Rope Guards, Inspect JOB 1
D-020 Appendages (U/W) - Internal, Preserve JOB 1
D-021 Chain Locker(s), Clean and Inspect JOB 1
D-022 Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect JOB 1
D-023 Voids (Non-Accessible), Leak Test JOB 1
O-024 Voids (Non-Accessible), Internal Surfaces, Preserve JOB 1
D-025 Tanks (Mp Fuel Service), Clean And Inspect JOB 1
D-026 Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renew JOB 1
D-027 Propulsion Shafting; Remove, Inspect, and Reinstall JOB 1
O-028 Propulsion Shafting, Straighten JOB 1
D-029 Propulsion Shaft Bearings (External), Check Clearances JOB 1
O-030 Stern Tube Interior Surfaces, Preserve 100% JOB 1
D-031 Propeller , Remove, Inspect, and Reinstall JOB 1
O-032 Propeller, Minor Repairs and Reconditioning, Perform JOB 1
D-033 Circuit Breakers (60 Hz), Inspect and Test JOB 1
D-034 Fathometer Transducer, Renew JOB 1
D-035 Sea Valves and Waster Pieces, Overhaul or Renew JOB 1
D-036 Sea Strainers - Simplex (All Sizes), Clean and Inspect JOB 1
(12/12/2018)
Rev-0 - Page 1 of 2
PRICING SCHEDULE FOR:
USCGC PENOBSCOT BAY (WTGB-140) DRYDOCK AVAILABILITY FY2019
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-037 Rudder Assembly, Remove, Inspect And Reinstall JOB 1
O-038 Rudder(s), Preserve (“100%”) JOB 1
O-039 Rudder Stock Bearings (Upper And Lower), Renew JOB 1
D-040 Anchor Chain(s) and Ground Tackle, Inspect and Repair JOB 1
O-041 Tanks (Sewage Holding), Preserve “100%” JOB 1
O-042 Accessible Void(s), Preserve “100%” JOB 1
O-043 Tanks (Ballast), Preserve “100%” JOB 1
O-044 Tanks (Ballast), Preserve “Partial” JOB 1
O-045 Chain Locker, Preserve 100% JOB 1
O-046 Chain Lockers, Preserve – Partial JOB 1
O-047 Tanks (Dirty Oil and Waste), Preserve “100%” JOB 1
O-048 Tanks (Dirty Oil and Waste), Preserve “Partial” JOB 1
O-049 Tanks (Grey Water Holding), Preserve “100%” JOB 1
O-050 Accessible Void(s), Preserve “Partial” JOB 1
O-051 Tanks (Potable Water), Preserve “100%” JOB 1
O-052 Tanks (Potable Water), Preserve “Partial” JOB 1
D-053 Superstructure, Preserve “Partial” JOB 1
D-054 Cathodic Protection / Zinc Anodes, Renew JOB 1
D-055 Drydock JOB 1
D-056 Temporary Services, Provide - Tender JOB 1
D-057 Sea Trial Performance, Support, Provide JOB 1
O-058 Watertight Hatches (External DC Deck and Below), Renew JOB 1
D-059 Icebreaking Floodlight Foundation, Renew JOB 1
D-060 Deck Covering (Interior Wet/Dry), Renew JOB 1
D-061 Ship Service Diesel Generators (SSDG) Fuel Oil Piping, Reconfigure JOB 1
D-062 Anchor Windlass, Inspect and Service JOB 1
D-063 Potable Water System Valves, Renewal JOB 1
D-064 Fuel Valves, Renew JOB 1
D-065 Internal Structure Repair JOB 1
D-066 Main Propulsion Diesel DC Generator, Dry Clean & Inspect JOB 1
O-00A Composite Labor Rate Hour 700
D-00B GFP Report EA 1
O-00Z Laydays Day 5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
(12/12/2018)
Rev-0 - Page 2 of 2
File details come from the government source that posted it.