ANVIL_(WLIC_75A)_DD_FQ2_JCR_19ER0_BLANK_(15Nov18).xls

XLS spreadsheet 54 KB Posted

Attached to
USCGC ANVIL AND BARGE DRY DOCK
Solicitation number
70Z085-19-Q-P4537100
Issued by

About this file

Attachment 1 SOS/Section B CGC ANVIL and barge

View the file

Other files

File Type Posted
Amendment_0005_CGC_OAK_DD.pdf PDF
FL_1702_11_1_-_-.pdf PDF
225-WLB_424_7_1_-_-.pdf PDF
225B-WLB_201_2_1_-_C.pdf PDF
MWC10TB_Tech_Manual.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Question__18_70Z085-19-Q-P4537100_Response_(19Dec18).pdf PDF
Amendment_A0004.pdf PDF
75B-WAGL_1604_2_1_-_2.pdf PDF
75B-WAGL_1604_3_1_-_1.pdf PDF
75-WLIC_512_1_1_-_A.pdf PDF
75D-WAGL_3801_3_1_-_-.pdf PDF
Amendment_0003_CGC_ANVIL.pdf PDF
75B-WAGL_3801_1_1_-_A.pdf PDF
75-WAGL_3801_2_1_-_-.pdf PDF
Amendment_0002.pdf PDF
Amendment_00001_CGC_ANVIL_AND_BARGE.pdf PDF
OMBUDSMAN_PROGRAM_LETTER.docx DOCX document
ANVIL_(WLIC_75A)_DD_FQ2_JCR_19R0.pdf PDF
Request_for_Clarification_doc.docx DOCX document
Solicitation_CGC_Dry_Dock_ANVIL.doc DOC document
Past_Performance_Questionnaire.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ANVIL (WLIC-75A) DRY DOCK AVAILABILITY FY2019
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (U/W Body), Inspect - TenderJOB1$0.00
D-002Hull Plating (U/W Body), Ultrasonic Testing - TenderJOB1$0.00
O-003U/W Body, Preserve (100%) - TenderJOB1$0.00
O-004Hull Plating Freeboard, Preserve “100%” - TenderJOB1$0.00
D-005Tanks (Mp Fuel Service), Clean And Inspect - TenderJOB1$0.00
D-006Propulsion Shaft Rope Guards, InspectJOB1$0.00
D-007Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) - TenderJOB1$0.00
D-008Tanks (Mp Fuel Service), Clean And Inspect - BargeJOB1$0.00
O-009Voids (Non-Accessible), Leak Test - TenderJOB1$0.00
O-010Voids (Non-Accessible), Internal Surfaces, Preserve - TenderJOB1$0.00
D-011Propulsion Shafting; Remove, Inspect, and ReinstallJOB1$0.00
O-012Propulsion Shafting, StraightenJOB1$0.00
D-013Hull Fittings (Mooring and Towing), Inspect and Test - BargeJOB1$0.00
D-014Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul and RenewJOB1$0.00
D-015Propulsion Shaft Bearings (External), RenewJOB1$0.00
O-016Shaft Strut Barrel, RenewJOB1$0.00
D-017Stern Tube Interior Surfaces, Preserve 100%JOB1$0.00
D-018Propellers, Remove, Inspect, and ReinstallJOB1$0.00
D-019Keel Coolers, Clean, Inspect and HydroJOB1$0.00
D-020Fathometer Transducer, Renew – TenderJOB1$0.00
D-021Vent Ducts (Galley and Pantry Room All), Commercial CleaningJOB1$0.00
D-022Chilled and Heated Water System, General MaintenanceJOB1$0.00
D-023Sea Valves, Renew - TenderJOB1$0.00
D-024Rudder Assembly; Remove, Inspect and ReinstallJOB1$0.00
D-025Rudder Stock Bearings Clearances, CheckJOB1$0.00
D-026Hull Fittings (Mooring and Towing), Inspect and Test - TenderJOB1$0.00
D-027Grey Water Piping, Clean and FlushJOB1$0.00
D-028Sewage Piping and Vent Piping, Clean and Flush – TenderJOB1
O-029Hull Plating Freeboard, Preserve – Partial - TenderJOB1
D-030Cathodic Protection / Zinc Anodes, Renew - TenderJOB1
D-031Drydock - TenderJOB1
D-032Temporary Services, Provide - TenderJOB1
D-033Sea Trial Performance, Support, ProvideJOB1
D-034Hull Plating (U/W Body), Inspect - BargeJOB1
D-035Hull Plating (U/W Body), Ultrasonic Testing - BargeJOB1
O-036U/W Body, Preserve (100%) - BargeJOB1
O-037U/W Body, Preserve (Partial - Condition A) – BargeJOB1
O-038Hull Plating Freeboard, Preserve – Partial - BargeJOB1
D-039Buoy and Cargo Handling Crane, Shrink WrapJOB1
O-040Hull Plating Freeboard, Preserve “100%” - BargeJOB0
O-041Lead-Based Paint and Asbestos-Containing Material, Perform Spot AbatementJOB1
O-042Voids (Non-Accessible), Leak Test - BargeJOB1
O-043Voids (Non-Accessible), Internal Surfaces, Preserve - BargeJOB1
O-044Lead Dust, CleanJOB1
D-045Barge, Diesel Engine Exhaust Piping, Commercial CleanJOB1
D-046Fathometer Transducer, Renew – BargeJOB1
D-047Sea Valves, Renew - BargeJOB1
D-048Spud Wells, Preserve - BargeJOB1
D-049Spud Winches, Renew - BargeJOB1
D-050Spud Wells, Inspect - BargeJOB1
O-051U/W Body, Preserve (Partial - Condition A) - TenderJOB1
O-052U/W Body, Preserve (Partial - Condition B) - TenderJOB1
O-053U/W Body, Preserve (Partial - Condition C) - TenderJOB1
D-054Cathodic Protection / Zinc Anodes, Renew - BargeJOB1
D-055Drydock - BargeJOB1
D-056Temporary Services, Provide - BargeJOB1
O-057Spud Well, Repair – BargeJOB1
D-058Handrail Stanchion Sockets, Inspect and Renew – BargeJOB1
D-059Pumps, Overhaul or Renew – TenderJOB1
D-060Service Air Piping, Renew – TenderJOB1
D-061Closed Chock, Repair or Renew – TenderJOB1
D-062Sea Chest Port, Repair or Renew – BargeJOB1
D-063Gaylord Hood System Clean, Overhaul, and Complete InstallationJOB1
D-064Mast Base, Inspect and Repair – TenderJOB1
O-065Deck Covering, Renew – TenderJOB1
D-066Air Conditioning Plant System Overhaul, Repair and Air Handler ReplaceJOB1
D-067Hull Plate Renew - TenderJOB1
D-068Hull Plating, Renew - BargeJOB1
D-069Hydraulic Steering System, Renew and OverhaulJOB1
D-070Fuel Oil Tank Vent, Renew - BargeJOB1
O-071Lead-Based Paint and Asbestos-Containing Material, 100% Abatement, Perform - BargeJOB1
D-072Fire Main Bleed Piping, RenewJOB1
O-073U/W Body, Preserve (Partial - Condition B) - BargeJOB1
O-074U/W Body, Preserve (Partial - Condition C) - BargeJOB1
O-075Lead-Based Paint, Perform Spot AbatementJOB1
D-076Handrail Stanchion Sockets, Inspect and Renew – TenderJOB1
D-077Remote Cutoff Valve & Deck Box, RepairJOB1
D-078Sea Strainers (All Sizes), Renew - TenderJOB1
D-079Sea Strainers - Duplex (All Sizes), Overhaul - BargeJOB1
D-080Anti-Ventilation Underwater Hull Strakes, InstallationJOB1
O-00AComposite Labor Rate$0.00Hour12000
D-00BGFP ReportNSPEANSP
O-00ZLaydays$0.00Day5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(7/16/2018) Draft-1 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it.