Statement_of_Work_USCGC_Mellon_Galley_Cabinet_and_Drawer_Repair.pdf

PDF 16 KB Posted

Attached to
Ship Galley Cabinet and Drawers Repair
Solicitation number
70Z085-19-Q-DHL200
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
image6.jpeg JPEG file
image2.jpeg JPEG file
SCA_WD.pdf PDF
image4.jpeg JPEG file
FAR_52.212_and_HSAM_Clauses_for_SERVICES,_FAC_2005-83.pdf PDF
image3.jpeg JPEG file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

USCGC MELLON

SHIP GALLEY METAL DRAWERS & CABINET

REPAIRS

SCOPE OF WORK

USCGC MELLON is a 50 year old ship located Seattle moored to CG Base Seattle. The ship has a galley for preparing and serving food that has several metal cabinets and drawers that need repairs and/or replacements. There are few that have broken door latches, tracks, and shelves, as well as a couple warped doors. The ship is set to sail in a few short weeks and will need a contractor to effect repairs with urgency.

1.0 OBJECTIVE

1.1 Repair and/or replace metal cabinet doors and drawers in the ship’s galley within 10 business days of award.

2.0 REQUIREMENTS

Contractor will provide the labor, materials and equipment to perform the following:

2.1 Repair doors to one stand-up cabinet: 59.5” x 14.5”

2.2 Repair doors to two cabinet shelfs: 47.5”x12.5”

2.3 Repair/install inside shelf to one cabinet

2.4 Repair eight metal drawers with latch and track problems:

21.75”Lx8”Hx20.5”D

3.0 TECHNICAL POINT OF CONTACT

Primary

3.1 Casey A Bettega

Casey.A.Bettega@uscg.mil (206)-217-6290

Secondary

3.2 Steven D. Dull

Steven.D.Dull@uscg.mil (206)-217-6290 mailto:Casey.A.Bettega@uscg.mil mailto:Steven.D.Dull@uscg.mil

4.0 PLACE OF PERFORMANCE

4.1 USCG Base Seattle – Pier 36

1519 Alaskan Way S Seattle, WA 98134

5.0 SITE VISIT

5.1 Site visits are highly encouraged prior to proposal submission.

Safety Protections of Personnel and Property

01. During the execution of project, the contractor shall conform to the rules and regulations as set forth by OSHA Safety Standards, 29 CFR Part 1926- Safety and Health Regulations for Constructions and Title 8, California Administrative Code-Construction Standards. When the Standards differ, the more restrictive standard will apply.

02. Contractor will be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of this project.

03. Contractor shall take all necessary precautions for their own safety and for the safety of others.

04. Hearing protection may be required throughout the project due to aircraft operation.