REQUEST FOR PROPOSAL
SOLICITATION NO. 70Z08518RP4501600
Dockside Repairs of CGC HAMILTON (WMSL 753)
ATTACHMENT 4 – SCHEDULE OF ITEMS (Rev-1)
SCHEDULE OF ITEMS – PRICES
Provide all labor, materials, and equipment, except as specified, to perform DOCKSIDE REPAIR OF CGC HAMILTON (WMSL 753) during the period of 28 February 2018 through 05 May 2018. All work will be performed at the cutter’s home moorage facility in North Charleston, SC.
CLIN 0001 - DEFINITE ITEMS: These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| Work-Item |
| Description |
| Qty |
| Unit |
| Amount |
| 1 |
| General Welding, Provide-Optional |
| 1 |
| JOB |
| $ |
| 2 |
| Tanks (MP Fuel Service), Clean and Inspect |
| 1 |
| JOB |
| $ |
| 3 |
| Galley Grease Fire Extinguishing System, Inspect And Test |
| 1 |
| JOB |
| $ |
| 4 |
| Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test |
| 1 |
| JOB |
| $ |
| 5 |
| Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test |
| 1 |
| JOB |
| $ |
| 6 |
| Water Mist Fire Extinguishing System, Inspect and Test |
| 1 |
| JOB |
| $ |
| 7 |
| Cargo Handling Elevator Biannual, Inspect and Repair |
| 1 |
| JOB |
| $ |
| 8 |
| Forward and Aft Capstans, Annual Maintenance, Perform |
| 1 |
| JOB |
| $ |
| 9 |
| Oily Water Separator (OWS) System, Inspect and Groom |
| 1 |
| JOB |
| $ |
| 10 |
| Portable Brow Storage, Relocate |
| 1 |
| JOB |
| $ |
| 11 |
| Tanks (Water Mist), Preserve “100%”-Optional |
| 1 |
| JOB |
| $ |
| 12 |
| Tanks (Water Mist), Preserve “Partial” |
| 1 |
| JOB |
| $ |
| 13 |
| Temporary Services, Dockside, Home Pier |
| 1 |
| JOB |
| $ |
| 14 |
| Flex Hose Assemblies, Renew |
| 1 |
| JOB |
| $ |
| 15 |
| Surfaces, Preserve |
| 1 |
| JOB |
| $ |
| 16 |
| Grey and Black Water Vent Piping, Modify |
| 1 |
| JOB |
| $ |
| 17 |
| QAATDR/QAWTDR, Replace (NSC3&F) |
| 1 |
| JOB |
| $ |
| 18 |
| QAWTDR, Modify |
| 1 |
| JOB |
| $ |
| 19 |
| Vacuum Collection Holding Tank, Clean and Inspect |
| 1 |
| JOB |
| $ |
| 20 |
| Vacuum Collection Holding Tank, Preserve “Partial”-Optional |
| 1 |
| JOB |
| $ |
| 21 |
| Vacuum Collection Holding Tanks, Preserve “100%”-Optional |
| 1 |
| JOB |
| $ |
| 22 |
| Life Raft Installation |
| 1 |
| JOB |
| $ |
| 23 |
| Aircraft Securing Fittings, Install |
| 1 |
| JOB |
| $ |
| 24 |
| Deck Covering (Polymeric), Seal |
| 1 |
| JOB |
| $ |
| 25 |
| Deck Covering (Polymeric); Renew |
| 1 |
| JOB |
| $ |
| Total Amount of Definite Items |
| $ |
CLIN 0002 - COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (16) entitled “COMPOSITE LABOR HOUR RATE.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY** |
| EXTENDED AMOUNT* |
| $__________ |
| per hour |
| 485 hours |
| $________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.
ATTACHMENT 4