TECHNICAL SERVICES FOR REFRIGERANT INSPECTION AND REPAIR
1. Background. Ship’s Crew cannot identify refrigerant leak in A/C system; leak is known to be present due to constant and expedited loss of refrigerant. Crew is recharging the reefer units on a weekly basis. #1 Reefer unit short-cycled and self-secured due to loss of refrigerant on 16APR18. Upon finding condition, SF drew down system refrigerant so that both #1 and #2 Reefer units each with 60 lbs. SF then restarted #1 Reefer. On 20APR, #1 reefer short cycled and self-secured again with no refrigerant. SF started #2 Reefer unit and discovered 80 lbs of refrigerant in the system. SF troubleshooting indicates possible failed cross-connect valve, which may be allowing refrigerant to migrate between #1 and #2 reefer units. 40 lbs of refrigerant was lost from the system in 4 days. Troubleshooting discovered an oil leak on the equalizing stop valve indicating a possible refrigerant leak.
2. Scope. The scope of this work is on the USCGC BETHOLF and consists of the following:
2.1: Investigating and troubleshooting cause/source of refrigerant leak and submitting Report/CFR for further repairs.
2.2 Repair back to Manufacturer’s Original Working Condition
3. Objective. The objective of this requirement is to have A/Cs remain fully functional with no abnormal loss of refrigerant.
4. Tasks.
Under direction of ships assigned personnel, the contractor shall inspect the cause of the leak on both #1 and #2 reefer systems.
The contractor shall make repairs on leaks.
The contractor shall refill system with approved refrigerant and optest with ships personnel for approval of satisfactory test.
5. Government furnished property.
None.
6. Drawings: 750-WMSL_516_1_1_-_E
7. Place of performance- Cutter's home pier, Alameda, CA
8. Period of performance- 21 May – 07 June 2018
* Please note that the 28th (Memorial Day) will be not be a working day.
8.1. Due to cutter schedule, POP has no room to extend.