STURGEON_BAY_(WTGB_140)_DS_FQ4_SCP_18ER0_BLANK.xls
XLS spreadsheet 38 KB Posted
- Attached to
- USCGC STURGEON BAY DOCKSIDE
- Solicitation number
- 70Z085-18-Q-P4592500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_CGC_STURGEON_BAY.doc | DOC document | |
| Request_for_Clarification_doc.docx | DOCX document | |
| OMBUDSMAN_PROGRAM_LETTER.docx | DOCX document | |
| STURGEON_BAY_(WTGB_140)_DS_FQ4_SCP_18R0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC STURGEON BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2018 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-002 | Vertical Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-003 | Flex Hose Assemblies, Renew | JOB | 1 | $0.00 | |
| D-004 | Firemain Valves, Overhaul or Renew | JOB | 1 | $0.00 | |
| D-005 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-006 | AFFF System Check Valves, Install | JOB | 1 | $0.00 | |
| D-007 | Galley Grease Trap, Renew | JOB | 1 | $0.00 | |
| D-008 | Ship Service Diesel Generator, Overhaul | JOB | 1 | $0.00 | |
| D-009 | Water Tight Hatches (Internal DC Deck and Below), Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 180 | ||
| D-00B | GFP Report | EA | 1 | ||
| D-00C | Travel and Perdiem | JOB | 1 | ||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(02/02/2018)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| D-001 | 1 | 62 | Baltimore, MD | |||||||||||||||||||||
| D-002 | 1 | 52 | Biloxi, MS | |||||||||||||||||||||
| D-003 | 1 | 56 | Boston, MA | |||||||||||||||||||||
| D-004 | 1 | 50 | Charleston, SC | |||||||||||||||||||||
| D-005 | 1 | 60 | Corpus Christi, TX | |||||||||||||||||||||
| D-006 | 1 | 51 | Hampton Roads | |||||||||||||||||||||
| D-007 | 1 | 64 | Honolulu, HI | |||||||||||||||||||||
| D-008 | 1 | 55 | Houston, TX | |||||||||||||||||||||
| D-009 | 1 | 56 | Los Angeles, CA | |||||||||||||||||||||
| 180 | 55 | Median Rate | ||||||||||||||||||||||
| 1 | 49 | Miami | ||||||||||||||||||||||
| 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(02/02/2018)
Rev-0 - Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it.