USCGC OSAGE (WLR 65505)

USCG 100B BARGE (99003)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2018

Developed By: CWO James C Luck

(Rev 0, 19 December 2017)

USCGC OSAGE (WLR-65B) DOCKSIDE AVAILABILITY FY2018

ii (Rev -0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics - Tender .............................................................................................................. xii Principal Characteristics - Barge ............................................................................................................... xiii General Requirements WORK ITEM 1: Boiler Exhaust Stack Uptakes, Commercial Clean - Tender WORK ITEM 2: Boiler Exhaust Stack Uptakes, Commercial Clean - Barge WORK ITEM 3: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -

Tender WORK ITEM 4: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift -

Barge WORK ITEM 5: Spud Winches, Inspect & Service - Barge WORK ITEM 6: Capstan, Inspect and Service - Barge WORK ITEM 7: Spuds, Overhaul - Tender WORK ITEM 8: Spuds, Overhaul - Barge WORK ITEM 9: Boat Boom, Inspect and Service - Barge WORK ITEM 10: Grey Water Piping, Clean and Flush WORK ITEM 11: Sewage Piping, Clean and Flush WORK ITEM 12: Repair Locker Doors, Renew WORK ITEM 13: Grey Water Piping, Renew WORK ITEM 14: Deck Covering, Wet/ Dry, Seal WORK ITEM 15: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 16: Barge, Diesel Engine Exhaust Piping, Commercial Clean WORK ITEM 17: Head Wire Winch, Inspect & Service WORK ITEM 18: Spud Winch, Inspect & Service - Tender WORK ITEM 19: Buoy And Cargo Crane, Inspect And Service - Barge WORK ITEM 20: Sewage Holding Tank(s), Clean and Inspect - Tender WORK ITEM 21: Sea Trial Performance, Support, Provide WORK ITEM 22: Lead-Based Paint, Perform Spot Abatement WORK ITEM 23: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 24: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 25: Forward Rake Heater, Install WORK ITEM 26: Gunwale Repair Barge (Barge) WORK ITEM 27: Shaft Alley Heater, Install WORK ITEM 28: Forward Hold Thru Hull Repair WORK ITEM 29: Barge Shack Doors, Repair iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

American Welding Society (AWS): http://www.awspubs.com/index.php

ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

NFPA: http://www.nfpa.org

SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 100A-CGB 1202-01, Rev 1, Deck Railing & Stanchions for 100ft Spec Barge

Coast Guard Drawing 100B CGB 0103-001, Rev 1, Outboard Profile & Deck Arrangement

Coast Guard Drawing 100B CGB 1101-01, Rev 3, Barge Plating and Bill of Material

Coast Guard Drawing 100B CGB 2002-1, Rev 2, Small Boat Derrick

Coast Guard Drawing 100B CGB 2100-1, Rev 4, Hydraulic Piping

Coast Guard Drawing 100B CGB 2100-2, Rev -, Revisions to Hydraulic Piping Work W/ Dwg 100-B-

CGB-2100-1

Coast Guard Drawing 100B CGB 2100-3, Rev -, Hydraulic Piping Mods

Coast Guard Drawing 100B CGB 2602-001, Rev 3, Spud Well

Coast Guard Drawing 100B CGB 3801-2, Rev -, 100’ x 30’ x 7’ Barge Heating Boiler & Seven Modine Heaters

Coast Guard Drawing 100B CGB 4000-1, Rev 3, Machinery Arrangement

Coast Guard Drawing 100B CGB 4103-1, Rev 3, Engine Cooling & Exhaust Piping & Weedicide System

Coast Guard Drawing 100B CGB 4103-6, Rev -, USCGB 99008 Engine Exhaust Piping Arrangement

(USE FOR CGB 99008 ONLY)

Coast Guard Drawing 100B CGB 4901-001, Rev 1, Compressed Air Piping Arrangement and Details

Coast Guard Drawing 100B-CGB 103-003, Rev -, Booklet of General Plans

Coast Guard Drawing 100B-CGB 103-1, Rev 1, Outboard Profile & Deck Arrangement

Coast Guard Drawing 100B-CGB 3801-2, Rev -, 100' X 30' X 7' USCG Barge Heating Boiler and Seven Modine Heaters v (Rev-0)

Coast Guard Drawing 100B-CGB-0103-006, Rev 1, CGB-99003 Outboard Profile & Deck Arrangement

Coast Guard Drawing 100B-CGB-1901-001, Rev 1, Painting, Insulation & Lining Schedule

Coast Guard Drawing 65 WD 0700-004, Rev -, Docking Block Arrangement (“A” & “B” Class)

Coast Guard Drawing 65 WD 2901-003, Rev -, Curves of Form

Coast Guard Drawing 65B WD 0500-001, Rev -, Lines and Offsets

Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans

Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312 MDE

Coast Guard Drawing 65B WD 2602-1, Rev -, Spud & Rigging

Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit IF 1312 MDE

Coast Guard Drawing 65B WD 4808-003, Rev -, Sanitary Drain System (65505)

Coast Guard Drawing 65B WD 4810-006, Rev-, Exhaust Piping Mods to Suit IF 1312 MDE (OSAGE)

Coast Guard Drawing 65B WD-3000-2; Damage Control Locker Details and Arrangement

Coast Guard Drawing 65B-WD 103-002, Rev -, Gen Arrg Hold & DK Plans

Coast Guard Drawing 65B-WD 103-1, Rev A, Inboard & Outboard Profiles

Coast Guard Drawing 65B-WD 1101-001, Rev -, Shell Exp, Bulwk, Railing, Rub Rail, Chocks Bow Fender

Coast Guard Drawing 65B-WD 1101-002, Rev -, Hull Struct & Mn Dk Pln Bm Mods To Dk Plat

Coast Guard Drawing 65B-WD 3802-1, Rev A, Heating Sys & Boiler Diag

Coast Guard Drawing 65B-WD_4903_7, Compressed Air System

Coast Guard Fleet Drawing FL 2602-10, Rev J, Spud Arrangements and Details

Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 1797, SWBS 582, Section A, Nov 2009, Capstan

Coast Guard Technical Publication (TP) 3862, 21-FEB-07, Hatches and Doors

Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air Winch Model HU-40 Series

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740) 2014, Welding And Allied Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Preserve Ship Structures

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures vi (Rev-0)

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

TP-3364

OTHER REFERENCES

AAA/CAA - http://newsroom.aaa.com/diamond-ratings/diamond-rating-definitions/

American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)

Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment

Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting

DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems

FORBES (formerly MOBIL) Travel Guide - http://www.forbestravelguide.com/

Hotel-Motel National Master List, http://www.usfa.fema.gov/applications/hotel/

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

Public Law 101-391, 1990, Hotel and Motel Fire Safety Act

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal vii (Rev-0)

The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning viii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

5 Y Braden Gearmatic

Winch Model #

GH7-69/23029-01

NSN: 3950-01-F12-2746 / 1 ea. 6,675.00

12 N One (1) S.S. Double Door with Frame &

Hardware to fit:

Rough Opening of 62

½”x 72 ½”x 5 ½” ;

One (1) Aluminum Louver mounted at top of Non-Active door: Right Hand Active, Reverse

Bevel Two Bronze Dogs Located at top

& bottom of each door opposite hinge side, (4) dogs total

N/A 1 ea. $4500

12 N One (1) S.S. Double Door with Frame &

Hardware to fit:

Rough Opening of 62

½”x 72 ½”x 5 ½”;

One (1) Aluminum Louver mounted at top of Active door;

Right Hand Active, Reverse Bevel Two

Bronze Dogs Located at top & bottom of each door opposite hinge side,

(4) dogs total

N/A 1 ea. $4500

17 Y **Hydraulic Winch, Braden Gearmatic

NSN: 3010-01-F12-2747

PN: BG8

1 ea. $6,675.00

18 Y ** Pneumatic Winch, HU

NSN: 3950-00-368-5253

PN: HU

1 ea. $11,918.73

19 N Pin Allied PN: 28147 1 ea. $1,562.00 19 N Bushing Allied PN: 53768 NSN:

4730-01-562-0111 4 ea. $201.00 ix (Rev-0)

N Bushing Allied PN: 14199 4 ea. $250.00

N Pin Allied PN: 28150 1 ea. $180.00

N Bearing, Needle Allied PN: 10520 2 ea. $200.00

N Bearing, Inner Race Allied PN: 10521 2 ea. $53.00

N Shim Allied PN: 28593 4 ea. $70.00

N Sheave, Pin

Assembly Allied PN: 21805 2 ea. $403.00

N Pin Allied PN: 28148 4 ea. $380.00

N Pin Assembly Allied PN: 29110 1 ea. $1082.00

Y Hydraulic Pump NSN: 4320-01-F12-2758

PN: 27803

1 ea. $3,400.00

Y Sheave Allied PN: 13624 NSN:

2040-01-F12-3043 2 ea. $1022.49

Y Swing Drive PN: 23827 NSN: 3010-01-

F12-3044 2 ea. $9,584.83

Y Control Valve Allied PN: 27771 NSN:

4820-01-F12-2755 1 ea. $5,350.94

Y Swing Drive Output

Gear Allied PN: 27828 NSN:

3020-01-F12-2757 2 ea. $1,000.00

Y Luff Cylinder Allied PN: 27829 NSN:

3040-01-F12-2760 1 ea. $13,816.55

Y Jib Cylinder Allied PN: 27830 NSN:

2815-01-F12-2789 1 ea. $15,199.62

Y Allied Extension

Cylinder Allied PN: 27831 NSN:

2530-01-F12-3042 1 ea. $11,947.67

Y Winch, Hydraulic NSN: 3950-01-F12-2753

PN: CH150A

1 ea. $13,000.00

N Wire Rope, 3/4”, 175’, 6x36 RRL

IWRC XXIPS

w/poured open speltor socket on one end

NSN: 4010-01-647-1654 1 ea. $615.00

25 N MODINE Heater Model # HSB18SB06SA 1 ea. 4000.00 27 N MODINE Heater Model # HSB18SB06SA 1 ea. 4000.00 29 N SS Door Hinges P/N: CC-3000-AHG-SS 4 195.00

N Rim Lock Assembly P/N: CC-1113-SS 2 495.00

N Rim Lock Spring P/N: CC01113SS-1-12 2 2.00

N Quadrant Handle

Assembly

P/N: CC-3000-A 2 265.00

N Door Gasket P/N: CC-3027K 2 120.00 x (Rev-0)

N Handle Assembly

Spring

P/N: CC-42980CC 2 2.50

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

5 Spud Winches, Inspect & Service - Barge

6 Capstan, Inspect and Service - Barge

9 Boat Boom, Inspect And Service - Barge

12 Repair Locker Doors, Renew

15 Deck Covering (Interior Wet/Dry), Renew

17 Head Wire Winch, Inspect & Service

19 Buoy And Cargo Crane, Inspect And Service - Barge

29 Barge Shack Doors, Repair xii (Rev-0)

PRINCIPAL CHARACTERISTICS - TENDER

65’ WLR (B-CLASS), SMALL BUOY RIVER TENDER

PHYSICAL

Length overall 65' 10" Depth 7' 8" Maximum beam 21' 0" Frame spacing 1' 6" Full load draft 5' 0 7/8" LCF Draft Full load displacement 127.71 Long Tons Fresh Water

HULL

Hull material Steel

MACHINERY

Number of propellers 2 Number of blades 5 Diameter of propeller 48" Pitch 46" fixed

RPM 410

TANK CAPACITIES

Fuel tanks Fresh water tanks Lube oil xiii (Rev-0)

PRINCIPAL CHARACTERISTICS - BARGE

100' CGB (A & B CLASS), BARGE

PHYSICAL

Length overall 100' 0" Depth 7' 0" Maximum beam 30' 0" Full load draft 4' 0" Full load displacement 287.39 Long Tons SW Shore tie voltage requirements 230 Volts

1 (Rev-0)

00000_0917_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

3 (Rev-0)

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

4 (Rev-0)

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2:

International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine

979. Column 3: Various.

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph

3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME

BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

11 (Rev-0)

25903_0617_FLT

REC_25903_FLT_65' WLR 'B' Class (CGC OSAGE) (0416)

WORK ITEM 1: Boiler Exhaust Stack Uptakes, Commercial Clean - Tender

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 65B WD 1107-003, Rev B, Stack Modifications to Suit IF 1312

MDE

Coast Guard Drawing 65B WD 4000-004, Rev B, Machinery Arrangement Mods to Suit

IF 1312 MDE

Coast Guard Drawing 65B WD 4810-006, Rev-, Exhaust Piping Mods to Suit IF 1312

MDE (OSAGE)

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

12 (Rev-0)

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Access covers.

Exhaust stack.

Boiler.

Exhaust pipe expansion joints.

Exhaust insulation blankets.

3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.

3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) 65B WD 1107-003, 65B WD 4000-004, and 65B WD 4810- 006, to a condition free from soot, tar, and any other foreign matter as follows:

3.3.1 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.3.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.

Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.3.3 Upon completion of cleaning, do the following:

3.3.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.3.3.2 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.

3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:

Exhaust stack access hatches, including all associated studs and nuts.

13 (Rev-0)

All cleaned exhaust stack surfaces.

All exhaust expansion joints, including associated bolts.

3.4.1 Following cleaning of the interior of each uptake, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of uptake has been satisfactorily cleaned according to the work plan.

3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

3.6 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the Coast Guard Inspector, thoroughly test and prove of the exhaust stack system to be satisfactory operating condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

4. NOTES

This section is not applicable to this work item.

14 (Rev-0)

25903_0617_FLT

REC_25903_FLT_100’Barge (ALL) (0414)

WORK ITEM 2: Boiler Exhaust Stack Uptakes, Commercial Clean - Barge

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 100B CGB 3801-2, Rev -, 100’ x 30’ x 7’ Barge Heating Boiler & Seven Modine Heaters

Coast Guard Drawing 100B CGB 4000-1, Rev 3, Machinery Arrangement

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

15 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Access covers.

Exhaust stack.

Boiler.

Exhaust pipe expansion joints.

Exhaust insulation blankets.

3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.

3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) Coast Guard Drawings 100B CGB 3801-2 and 100B CGB 4000-1, to a condition free from soot, tar, and any other foreign matter as follows:

3.3.1 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.3.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.

Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.3.3 Upon completion of cleaning, do the following:

3.3.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.3.3.2 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.

3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:

Exhaust stack access hatches, including all associated studs and nuts.

All cleaned exhaust stack surfaces.

16 (Rev-0)

All exhaust expansion joints, including associated bolts.

3.4.1 Following cleaning of the interior of each uptake, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of uptake has been satisfactorily cleaned according to the work plan.

3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

3.6 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the Coast Guard Inspector, thoroughly test and prove of the exhaust stack system to be satisfactory operating condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

17 (Rev-0)

55100_0617_FLT

REC_55100_FLT_65 WLR ‘B’ Class (ALL) (0709)

WORK ITEM 3: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift - Tender

1. SCOPE

1.1 Intent. The work item describes the requirements for the Contractor to clean, inspect, lift test and hydrostatically test the below designated air receivers and system valves:

SERVICE DESIGNATION LOCATION QTY OPERATING

PRESSURE

(psi)

Starting Air Receiver Shaft Alley 2 150 PSI

TYPE SIZE DESIGNATION QTY SET PRESSURE (psi)

Relief Valve 3/4 Shaft Alley 1 1 225

Relief Valve 3/4 Shaft Alley 2 1 225

Relief Valve 3/4 Aft Engine Room 1 150

Pressure Reducing Valve

1 1/2 Aft Engine Room 1 150

1.2 Government-furnished property.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 65B-WD_4903_7, Compressed Air System

18 (Rev-0)

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End

American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Piping system.

19 (Rev-0)

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the compressed air system, to demonstrate existing operational condition. Submit a CFR.

3.2 Air receiver cleaning and inspection. The Contractor shall clean and inspect each designated air receiver in paragraph 1.1 (Intent) as follows.

3.2.1 Blowdown the air receivers and collect the blowdown (condensate) into a separate container for inspection.

3.2.2 Visually inspect the blowdown (condensate) under a bright white light for oil or particulate contamination. Clean and visually inspect the internal and external surfaces of the air receiver for signs of corrosion, pitting, and other damage. Submit a CFR.

3.3 NDE. The Contractor shall perform NDE of the designated air receiver(s) in accordance with SFLC Std Spec 0740, Appendix C. If selected NDE method requires coating removal, perform subsequent touch-up preservation in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs). Refer to Coast Guard Drawing 65B-WD_4903_7 for guidance. Submit a CFR.

NOTE

Common NDE methods not requiring coating removal include, but are not limited to the following:

a. Radiographic Testing (RT).

b. Ultrasonic Testing (UT).

c. Eddy Current Testing (ET).

3.3.1 Test by ultrasonic (UT), magnetic particle (MT), or hydrostatic testing. The Contractor may select either method to satisfy testing requirements.

3.3.2 To hydrostatic test, isolate the air receiver by disconnecting all piping, relief valves, and pressure switches. Install pipe plugs/caps, to prevent backflow into compressors and other system components.

3.3.2.1 After all authorized repairs, hydrostatically test the air receiver using clean fresh water in accordance with SFLC Std Spec 0740, Appendix C and manufacturer’s recommended procedures. In the event a test pressure is not listed on the applicable drawing, test to 1½-times the nominal operating system pressure and hold for five minutes. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.

3.3.2.2 Instruments and equipment that might be damaged by clean fresh water shall be excluded from hydrostatic pressure test.

20 (Rev-0)

3.3.2.3 After testing, drain and thoroughly dry the air receivers with warm air. Dispose of testing fluids in accordance with all applicable Federal, state, and local regulations. Reconnect all disconnected piping and restore system. Renew any disturbed gaskets. Do not drain any fluids, including fresh water, into any space, bilge, or exterior location.

3.4 Contractor’s option for valve renewal. The Contractor may, at no additional cost to the Government, opt to renew valves designated for inspection and testing if preferable for the Contractor. If the Contractor elects to renew valves, the Contractor shall ensure the following:

New valves are commercial-standard type valves, conforming to the applicable standard listed in Table 1(Valve Standards).

New valves shall be equivalent (including identical material) to the valve being renewed.

TABLE 1 - VALVE STANDARDS

VALVE TYPE INDUSTRY STANDARD

Steel Valves MSS SP-61

Butterfly Valve MSS SP-67 Ball Valves, Flanged or Butt-Welded Ends MSS SP-72

Bronze Gate, Globe, Angle and Check Valves MSS SP-80 Angle Style. Pressure Relief Valves ASTM F1508

All others ASME B16.34

3.4.1 Visually inspect the piping and mounting arrangements; and submit a CFR detailing any required modifications to accommodate the new valve(s).

3.4.2 Provide original documentation to the COR certifying each valve has been satisfactorily shop-tested. Documentation shall include the set pressure, date of inspection / test, and testing facility.

3.5 Valve inspection and testing. The Contractor shall inspect and test each designated air system valve as follows.

This is the start of the file's text. The full file is on GovTribe.