BISCAYNE_BAY_(WTGB_140)_DS_FQ3_SCP_18Rev0_BLANK.xls
XLS spreadsheet 31 KB Posted
- Attached to
- DOCKSIDE REPAIRS FOR CGC BISCAYNE BAY
- Solicitation number
- 70Z085-18-Q-P4521200
About this file
Attachment#2- Schedule B-Bidder's Worksheet
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BISCAYNE_BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2018 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks (Ballast), Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-004 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-005 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | 1 | $0.00 | |
| D-006 | Vent Ducts (Engine And Motor Room All), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-007 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-008 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-009 | Vent Ducts (All Other), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-010 | Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | JOB | 1 | $0.00 | |
| D-011 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-012 | Vertical Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-013 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | $0.00 | |
| D-014 | Tanks (Potable Water), Preserve “Partial” | JOB | 1 | $0.00 | |
| D-015 | Watertight Hatches (External DC Deck and Below), Renew | JOB | 1 | $0.00 | |
| D-016 | Deck Covering, Electrical Matting, Renew | JOB | 1 | $0.00 | |
| D-017 | Watertight Doors and Scuttles (Internal, DC Deck and Below), Renew | JOB | 1 | $0.00 | |
| D-018 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 250 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(8/21/2017) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 1 | 62 | Baltimore, MD | ||||||||||||||||||||||
| 1 | 52 | Biloxi, MS | ||||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| 1 | 50 | Charleston, SC | ||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | ||||||||||||||||||||||
| 1 | 51 | Hampton Roads | ||||||||||||||||||||||
| 1 | 64 | Honolulu, HI | ||||||||||||||||||||||
| 1 | 55 | Houston, TX | ||||||||||||||||||||||
| 1 | 56 | Los Angeles, CA | ||||||||||||||||||||||
| 1 | 55 | Median Rate | ||||||||||||||||||||||
| 1 | 49 | Miami | ||||||||||||||||||||||
| 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| 1 | 55 | New London, CN | ||||||||||||||||||||||
| Tanks (Potable Water), Preserve “Partial” | 1 | 45 | New Orleans | |||||||||||||||||||||
| Watertight Hatches (External DC Deck and Below), Renew | 1 | 62 | NYNY | |||||||||||||||||||||
| 1 | 49 | Panama City, FL | ||||||||||||||||||||||
| 1 | 60 | Philadelphia, PA | ||||||||||||||||||||||
| Grey Water Holding Tank(s), Clean and Inspect | 1 | 51 | Portland, ME | |||||||||||||||||||||
| Composite Labor Rate | 250 | 57 | Portland, OR | |||||||||||||||||||||
| GFP Report | 55 | San Diego, CA | ||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it.