BISCAYNE_BAY_(WTGB_140)_DS_FQ3_SCP_18Rev0_BLANK.xls

XLS spreadsheet 31 KB Posted

Attached to
DOCKSIDE REPAIRS FOR CGC BISCAYNE BAY
Solicitation number
70Z085-18-Q-P4521200
Issued by

About this file

Attachment#2- Schedule B-Bidder's Worksheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC BISCAYNE_BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks (Potable Water), Clean and InspectJOB1$0.00
D-002Tanks (Ballast), Clean and InspectJOB1$0.00
D-003Main Diesel Engine (MDE) Exhaust Piping, Commercial CleanJOB1$0.00
D-004Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial CleanJOB1$0.00
D-005Boiler Exhaust Stack Uptakes, Commercial CleanJOB1$0.00
D-006Vent Ducts (Engine And Motor Room All), Commercial CleaningJOB1$0.00
D-007Vent Ducts (Galley and Pantry Room All), Commercial CleaningJOB1$0.00
D-008Vent Ducts (Laundry Exhaust), Commercial CleaningJOB1$0.00
D-009Vent Ducts (All Other), Commercial CleaningJOB1$0.00
D-010Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and LiftJOB1$0.00
D-011Anchor Windlass, Inspect and ServiceJOB1$0.00
D-012Vertical Capstan, Inspect and ServiceJOB1$0.00
D-013Tanks (Grey Water Holding), Preserve “Partial”JOB1$0.00
D-014Tanks (Potable Water), Preserve “Partial”JOB1$0.00
D-015Watertight Hatches (External DC Deck and Below), RenewJOB1$0.00
D-016Deck Covering, Electrical Matting, RenewJOB1$0.00
D-017Watertight Doors and Scuttles (Internal, DC Deck and Below), RenewJOB1$0.00
D-018Grey Water Holding Tank(s), Clean and InspectJOB1$0.00
O-00AComposite Labor RateHour2500
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB$0.00
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(8/21/2017) Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
162Baltimore, MD
152Biloxi, MS
156Boston, MA
150Charleston, SC
160Corpus Christi, TX
151Hampton Roads
164Honolulu, HI
155Houston, TX
156Los Angeles, CA
155Median Rate
149Miami
150Narragansett Bay, RI
155New London, CN
Tanks (Potable Water), Preserve “Partial”145New Orleans
Watertight Hatches (External DC Deck and Below), Renew162NYNY
149Panama City, FL
160Philadelphia, PA
Grey Water Holding Tank(s), Clean and Inspect151Portland, ME
Composite Labor Rate25057Portland, OR
GFP Report55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it.