This is a Statement of Work (SOW) for the U.S. Coast Guard PAC-3DSF Dive Force Management procurement of Combat Rubber Raiding Craft (CRRC) and ancillary equipment. The contract requires delivery of six (6) complete inflatable CRRC boats, six (6) multi-fuel outboard motors, and associated support kits. Each inflatable craft must be 5.8 meters in overall length, black in color, constructed of CSM (Chlorosulfonated Polyethylene/Hypalon)/Neoprene fabric with cold-vulcanized seams, and feature independent removable lower lateral speed tubes, integrated intercommunication valve manifold system, interlocking aluminum rigid floorboard decking, one 9-gallon marine fuel bladder, and one 15-foot marine fuel line per craft. All craft, components, and accessories must be new and unused.
Each of the six outboard motors must provide 65 horsepower in a long-shaft, two-stroke, three-cylinder configuration with minimum 697 cubic centimeter piston displacement compatible with a 21.7-inch transom. Motors must be multi-fuel capable (gasoline and heavy fuels), include electric start, pull/recoil start, and emergency rope-start capability, withstand complete saltwater submersion to 65 feet for 24 hours without bagging, include integrated dewatering capability returning motors to operational status within 10 minutes, and not exceed 200 pounds dry weight while producing minimum 60 horsepower. Each motor must include a motor support kit and ready-service/spare-parts kit. Vendors must submit comprehensive technical data sheets, independent laboratory material test reports, and engineering drawings validating compliance with all salient characteristics. Outboard motors must comply with DFARS 252.225-7013 Duty-Free Entry provisions, with core engines remanufactured at a U.S. facility. Delivery locations are Portsmouth, VA (two craft and motors), National City, CA (two craft and motors), and Honolulu, HI (two craft and motors). Outboard motors and motor kits must be delivered within 180 days after contract award; inflatable craft, floorboard systems, and fuel accessories within 270 days after contract award. Vendors must maintain active SAM registration at quote submission and comply with all applicable federal, state, and local laws and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Portsmouth WD 2015-4341 Rev36.pdf | ||
| Honolulu WD 2015-5689 Rev30.pdf | ||
| 70Z08426QDL940033_0_US.pdf | ||
| National City WD 2015-5635 Rev32.pdf | ||
| Attachment 3 Schedule .xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US COAST GUARD PAC-3DSF DIVE FORCE
MANAGEMENT
STATEMENT OF WORK
PROCUREMENT OF COMBAT RUBBER RAIDING CRAFT (CRRC) AND
ANCILLARY EQUIPMENT
REVISION 1
PAC-3DSF DIVE FORCE MANAGER
TABLE OF CONTENTS
SECTION PAGES
OBJECTIVE .............................................................................. PAGE 3
SCOPE OF WORK ................................................................... PAGE 3
DELIVERY LOCATIONS ....................................................... PAGE 5
PERIOD OF PERFORMANCE / DELIVERY SCHEDULE PAGE 6
VENDOR REQUIREMENTS .................................................. PAGE 6
POINT OF CONTACTS ........................................................... PAGE 6
1. OBJECTIVES
The objective of this contract is to procure six (6) Combat Rubber Raiding Craft (CRRC) boats, six (6) multi-fuel outboard motors, and all ancillary equipment as specified in this Statement of Work. The supplies are required to support U.S. Coast Guard operational needs.
2. SCOPE OF WORK
2.1 SALIENT CHARACTERISTICS
The vendor shall provide and deliver the following supplies. All quoted items must meet the applicable salient characteristics identified in Sections 2.1.1 and 2.1.2 of this document.
2.1.1 INFLATABLE CRRC
REQUIREMENT DESCRIPTION / SALIENT CHARACTERISTICS
Quantity Six (6) complete craft.
Craft Type Inflatable craft configured to support Coast Guard dive operations and the transport of divers, dive equipment, and associated mission gear.
Overall Length and Color 5.8 meters overall length, black.
Hull and Collar Fabric Composition
Main hull and buoyancy collar/sponsons shall be constructed of CSM (Chlorosulfonated Polyethylene / Hypalon) / Neoprene fabric (minimum 1100–1670 dtx).
Seam Construction Shall be cold-vulcanized/glued seams.
Hydrodynamic Lower Stabilizers
Shall feature independent, physically removable lower lateral speed tubes (stabilizers) running longitudinally beneath the main port and starboard sponsons.
Inflation Architecture Shall incorporate an integrated Intercommunication Valve manifold system linking all primary buoyancy chambers, allowing inflation from a single master point.
Decking System Shall feature an interlocking, multi-panel anodized aluminum rigid floorboard system that can be completely disassembled and rolled/stacked for transport.
Marine Fuel Bladder Each craft shall include one (1) marine-rated fuel bladder with a minimum capacity of nine (9) U.S. gallons, compatible with the required outboard motor.
Marine Fuel Line Each craft shall include one (1) marine-rated, dripless fuel line with a minimum length of fifteen (15) feet, compatible with the required outboard motor and furnished fuel bladder.
Condition All craft, components, and accessories shall be new and unused.
2.1.2 OUTBOARD MOTORS AND ASSOCIATED KITS
REQUIREMENT DESCRIPTION / SALIENT CHARACTERISTICS
Quantity Six (6) complete outboard motor systems.
Motor Configuration Each motor shall provide 65 horsepower and be a long-shaft, two-stroke, three-cylinder outboard motor with a minimum piston displacement of 697 cubic centimeters, compatible with a 21.7-inch transom
Fuel and Starting Capability
Each motor shall be multi-fuel capable, able to operate on gasoline and heavy fuels, and use a 50:1 fuel-to-two-cycle-oil mixture. Each motor shall include electric start, pull/recoil start, and emergency rope-start capability.
Submersion and Dewatering Capability
Each motor shall be capable of complete saltwater submersion without bagging to a depth of at least 65 feet for at least 24 hours. Each motor shall include an integrated dewatering system that allows the motor to be returned to operational status within 10 minutes after surfacing.
Power Output and Dry Weight
The dry weight of the fully assembled outboard engine, in either short-shaft or long-shaft configuration, shall not exceed 200 pounds (90.7 kilograms) while producing a minimum of 60 horsepower
Motor Support Kit Each motor shall include one (1) motor support kit containing the general and specialized tools, equipment, and components necessary to support installation, operation, field service, and emergency repair of the furnished motor.
Ready-Service/Spare- Parts Kit
Each motor shall include one (1) ready-service/spare-parts kit sufficient to support scheduled maintenance and routine corrective maintenance for one motor, including commonly required cooling-system, fuel-system, ignition/starting-system, corrosion-protection, lower-unit/propeller-service, control-system, and general replacement-hardware items.
Condition All motors, support kits, and spare-parts kits shall be new and unused.
2.2 TECHNICAL COMPLIANCE DOCUMENTATION
Vendors must submit comprehensive technical data sheets, independent laboratory material test reports, and engineering drawings that clearly cross-reference and validate compliance with the following mandatory specifications listed in Sections 2.1.1 and 2.1.2:
Hull and Collar Fabric Composition Seam Construction Hydrodynamic Lower Stabilizers Inflation Architecture Decking System Motor Configuration Fuel and Starting Capability Submersion and Dewatering Capability
The vendor shall provide an itemized list of the contents of each motor support kit and ready-service/spare-parts kit.
2.3 DUTY-FREE ENTRY & RE-MANUFACTURING COMPLIANCE
To ensure compliance with applicable trade regulations while meeting the required salient characteristics, the awarded vendor shall execute the procurement of the outboard motors in the following manner:
Duty-Free Entry (DFE): In accordance with DFARS 252.225-7013 (Duty-Free Entry), if the vendor utilizes core engines manufactured in a qualifying country (e.g., Japan), the vendor shall formally request Duty-Free Entry for these items.
Domestic Re-Manufacturing: Upon importation, the core engines must be re-manufactured at a facility located within the United States to produce the final 65 HP Multi-Fuel, Submersible Outboard Motors.
3. DELIVERY LOCATIONS
The vendor shall deliver all required craft, outboard motors, motor support kits, ready-service/spare-parts kits, fuel accessories, and associated ancillary equipment to the following locations:
Delivery Location Required Delivery
Regional Dive Locker East, Portsmouth, VA 23703
Two (2) complete inflatable craft; two (2) outboard motors; two (2) motor support kits; two (2) ready-service/spare-parts kits; and all associated ancillary equipment for the two craft.
Regional Dive Locker West, National City, CA 91950
Two (2) complete inflatable craft; two (2) outboard motors; two (2) motor support kits; two (2) ready-service/spare-parts kits; and all associated ancillary equipment for the two craft.
Regional Dive Locker Pacific, Honolulu, HI 96819
Two (2) complete inflatable craft; two (2) outboard motors; two (2) motor support kits; two (2) ready-service/spare-parts kits; and all associated ancillary equipment for the two craft.
4. PERIOD OF PERFORMANCE / DELIVERY SCHEDULE
To align with operational requirements, the delivery schedule is structured as follows:
Outboard Motors & Motor Kits: Delivery shall be completed no more than 180 Days
After Contract Award.
Inflatable Craft, Floorboard Systems, and Fuel Accessories: Delivery shall be completed no more than 270 Days After Contract Award.
Delivery Coordination: The vendor shall coordinate final delivery dates and times directly with the COR.
Contract Modifications: Any changes to the delivery timeline that impact the contract's overall Period of Performance must be formally approved by the KO.
5. VENDOR REQUIREMENTS
Vendor must have an active registration in the System for Award Management (SAM) at the time of quote submission (www.sam.gov).
Vendor must comply with all applicable federal, state, and local laws and regulations.
6. POINT OF CONTACT